

Lifts that Need a Replacement
#122
Posted 03 February 2015 - 04:31 PM
snoloco, on 02 February 2015 - 08:24 PM, said:
If Winter Park ever does implement the plan, I'd think a Chondola might be the best option for the Zephyr Express lift, given that it does get a lot of foot traffic.
boardski, on 02 February 2015 - 08:18 PM, said:
What would 'average' be here? 'Cause I have no idea how average would be defined in terms of number of stops and slows for misloads or misunloads here.
https://www.youtube....TimeQueenOfRome
#123
Posted 03 February 2015 - 08:15 PM
DonaldMReif, on 03 February 2015 - 04:31 PM, said:
What would 'average' be here? 'Cause I have no idea how average would be defined in terms of number of stops and slows for misloads or misunloads here.
By average, I meant about the same as any other 6 pack chair which serves intermediate terrain, IOW about the same frequency of stops/ slows as Super Bee at Copper, Independence at Breck, Lift 1 at Durango Mtn. On a normal ride up Pano there are about 1-2 slows and maybe 1 full stop due to rider error, other times it is a non-stop ride. On Sunnyside, it is difficult to get to the next tower without a stop or slow, and there are 14 of them. The triple chair is just not cutting it anymore and on days when Pano has to be closed, it is a nightmare, especially on weekends. Good thing most passes are also good at Copper since I would definatlely suggest skiing there on weekends when high winds are in the forecast. Last Sunday, at least, when high winds forced them not to run Pano or Eagle Wind, they opened Iron Horse even though it normally only runs Saturdays, this helped immensely since the line for Challenger was backed into the trees, Super Gauge was overflowing the ropes and even Pony Express was 3x the size of the maze. Apparently not enough football fans.
This post has been edited by boardski: 03 February 2015 - 08:20 PM
#124
Posted 03 February 2015 - 09:23 PM
boardski, on 03 February 2015 - 08:15 PM, said:
So rule of thumb is, whenever the Panoramic Express is on wind hold, avoid the Sunnyside section of the Mary Jane because that lift is stop and slow and stop and slow all the way up. A lift that's slowing or stopping roughly every ten to fifteen chairs clearly suffers from a people problem - misloads caused by people not paying attention, which seems even more bizarre when there is no beginner access to the Sunnyside lift.
Of course, for six packs, I always think IME that the Kensho SuperChair usually does better than most other intermediate terrain-servicing six packs when it comes to the rate of stops and slows. It services pretty much the same time of terrain the Panoramic Express services. I did 15 trips up the lift over the Christmas week, and I believe it slowed only once in those 15 rides. Now, it having inline loading and having a limited number of routes to access it (your three options to get to Kensho are to traverse down the Dunes from Imperial, take the Wanderlust catwalk from the Independence SuperChair, or ride the Zendo Chair) might have something to contribute to that. Off-topic, but just for a little contrast.
Perhaps for the Mary Jane, the solution is something akin to a high speed quad for Sunnyside, possibly another high speed quad for Challenger, and one for Iron Horse with a mid-unload station near where Pony Express ends. Perhaps Winter Park needs to put up video cameras to study the lift lines at these lifts to see where to upgrade. Sunnyside and the Zephyr Express should almost certainly be put at the top of that list.
https://www.youtube....TimeQueenOfRome
#125
Posted 04 February 2015 - 12:34 PM
#126
Posted 04 February 2015 - 12:45 PM
https://www.youtube....TimeQueenOfRome
#128
Posted 04 February 2015 - 08:06 PM
boardski, on 04 February 2015 - 06:59 PM, said:
Yep, I also think they run Zephyr at a slower speed then the rest of their high speeds with the exception of High Lonesome (Zephyr is around 800 fpm ish, Eskimo, Pano and Super Gauge are 1,000 ish with Olympia at about 900). A replacement for either Challenger or Iron Horse would probably do wonders for the lines at Super Gauge, I was thinking a HSQ over the Iron Horse Line with a one way mid unload at the top of the current Pony Express but a loading carpet triple or quad for Challenger would be nice too. Donald I think a chondola probably would be nice if they replaced Zephyr but they're not going to replace Zephyr just so they can have the cabins on full time for a chondola, I think the current situation works out relatively well with the exception of monster morning lines on weekends on the quad.
Also not a replacement but I think the Battle Mountain development on the backside of Blue Sky at Vail will be nice as well, if they decide not to make it a private club. I would guess they will design it like Arrowhead was designed, as a private club with lift and trail layout built to be annexed in Vail (in that case Beaver Creek via Bachelor Gulch) so that if VR buys it, then they could just slide it into the existing mountain. That whole thing is a really long way off though.
This post has been edited by Backbowlsbilly: 04 February 2015 - 08:08 PM
#129
Posted 04 February 2015 - 09:37 PM
As for Battle Mountain, I haven't heard any word about that project in years, making me think its status is "in limbo".
This post has been edited by DonaldMReif: 04 February 2015 - 10:10 PM
https://www.youtube....TimeQueenOfRome
#130
Posted 04 February 2015 - 10:13 PM
https://www.youtube....TimeQueenOfRome
#131
Posted 05 February 2015 - 01:38 AM
#132
Posted 21 April 2015 - 09:07 PM
#133
Posted 22 April 2015 - 08:44 PM
I think what needs to be done to WB is to put in the lifts to Westbowl from Creek (planned and cut 20 years ago) or to move on to build the Function Junction base for Vancouver day traffic. While moving Wiz and Solar to one of these spots and putting in a new lift in their place is an option, not sure there is much value in that considering the age of Wiz and Solar. Perhaps that would have been a option 10 years ago, but my guess now is that they will live out their lives where they are until they are too expensive to maintain.
So, that raises the question for the experts on here, at what point do these lifts get too old to maintain economically? (remember they are about 28 years old already!!!)
#134
Posted 23 April 2015 - 11:11 AM
#136
Posted 23 April 2015 - 08:16 PM
Just cuz she's 25 years old does not mean she's needs to be replaced. Mean hell, do you replace your house after living in it for 25 years?
#138
Posted 24 April 2015 - 11:59 AM
Jeff-- I agree but I don't write the checks. I don't, however, see the parallel between a fixed, non-moving structure and what is essentially a vehicle. You can keep a car running indefinitely too, but you'll throw more and more money at it as it ages. Lifts are no different.
#139
Posted 27 April 2015 - 09:19 PM
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.
#140
Posted 27 April 2015 - 10:22 PM
https://www.youtube....TimeQueenOfRome
1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users