| Wallowa Lake Tramway - Mt. Bachelor |
| Lift Stats: |
| Manufacturer: | PHB Hall |
| Type: | Gondola (4 Person) |
| Installed: | 1968 |
| Drive: | At bottom station |
| Tensioning: | At top station |
| Motor: | N/A HP |
| Motor rating, continuous: | N/A kW |
| Motor rating, starting: | N/A kW |
| Haul rope diameter: | N/A mm |
| Rope guage: | 4.8 m |
| Vertical rise: | 3,700 ft / 1,127.7 m |
| Inclined length: | N/A ft / N/A m |
| Speed on line: |
N/A fpm / N/A m/s |
| Speed in station: | N/A fpm / N/A m/s |
| Number of towers: | N/A |
| Number of chairs: | N/A pcs. |
| Capacity: | N/A P/h |
| Ride time: | 15 minutes |
| Chair parking: |
N/A |
| Other notes: |
Steepest four-person gondola in North America. |