| Sunrise Express - Mt. Bachelor |
|
|
||
| Lift Stats: |
| Manufacturer: | Doppelmayr |
| Type: | High-speed quad |
| Installed: | 1993 |
| Drive: | In top station |
| Tensioning: | In bottom station |
| Motor: | 300 HP |
| Motor rating, continuous: | 195.7 kW |
| Motor rating, starting: | 224.84 kW |
| Haul rope diameter: | 38 mm |
| Rope guage: | 4.8 m |
| Vertical rise: | 246.42 m |
| Inclined length: | 1,137.51 m |
| Speed on line: |
4.5 m/s |
| Speed in station: | 1 m/s |
| Number of towers: | 15 |
| Number of chairs: | 68 pcs. |
| Capacity: | 2,200 P/h |
| Ride time: | N/A minutes |
| Chair parking: |
Manual emergency rail |
| Other notes: |
Replaced the Sunrise triple chair. |