| North Peak - Loon Mountain |
| Lift Stats: |
| Manufacturer: | CTEC |
| Type: | Triple |
| Installed: | 1984 |
| Removed: | 2004 |
| Drive: | At bottom station |
| Tensioning: | At bottom station (counter weight) |
| Motor: | 500 HP |
| Motor rating, continuous: | N/A kW |
| Motor rating, starting: | N/A kW |
| Haul rope diameter: | N/A mm |
| Line guage: | 3.6 m |
| Vertical rise: | 1,563 ft / 476.40 m |
| Inclined length: | 4,805 ft / 1,464.56 m |
| Speed on line: |
550 fpm / 2.79 m/s |
| Speed in station: | 550 fpm / 2.79 m/s |
| Number of towers: | 18 |
| Number of carriers: | 176 pcs. |
| Capacity: | 1,700 P/h |
| Ride time: | 8.7 minutes |
| Chair parking: |
Manual Rail at Bottom Station |
| Other notes: |
Sold to Shawnee Peak Maine in 2006. Had a special variance from NH Tramway Board to run at 550 fpm. |