| Manufacturer:
|
Heron-POMA with a Lift Engineering
(YAN) loading station |
| Type:
|
Double |
| Installed:
|
1972 |
| Drive:
|
In top station |
| Tensioning: |
In bottom station |
| Motor: |
N/A HP |
| Motor rating, continuous: |
N/A kW |
| Motor rating, starting:
|
N/A kW |
| Haul rope diameter:
|
N/A mm |
| Rope guage: |
N/A m |
| Vertical rise: |
588 m |
| Inclined length:
|
N/A m |
| Speed on line:
|
N/A m/s |
| Speed in station: |
N/A m/s |
| Number of towers:
|
N/A |
| Number of chairs:
|
N/A pcs. |
| Capacity: |
N/A P/h |
| Ride time: |
10.5 minutes |
| Chair parking:
|
N/A |
| Notes: |
First lift to be planted by helicopter |