Posted 16 August 2013 - 06:29 PM

Hopefully Vail has made more progress than meets the eye on the new chair 4 (Mtn Top Express). In comparison, Wolf Creek has the new Treasure quad bottom terminal completely assembled.

This post has been edited by boardski: 16 August 2013 - 07:00 PM

Skiing since 1977, snowboarding since 1989

#22 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 20 August 2013 - 05:57 PM

View Postboardski, on 16 August 2013 - 06:29 PM, said:

Hopefully Vail has made more progress than meets the eye on the new chair 4 (Mtn Top Express). In comparison, Wolf Creek has the new Treasure quad bottom terminal completely assembled.


Well they've finished tree clearing and tower-foundation laying as of this morning.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#23 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 20 August 2013 - 07:24 PM

Lookin good at Stevens Pass
Attached File  1119988_10151529420775598_364047775_o (1).jpg (516.44K)
Number of downloads: 102

Whistler Blackcomb update: http://www.whistlerb...blog/index.aspx
- Peter<br />
Liftblog.com

#24 trooper1556

    Established User

  • Member
  • 67 Posts:

Posted 22 August 2013 - 02:49 PM

Progress on the new treasure high speed quad at wolf creek, CO is coming along. (Sorry i didn't have time to stop and take better pictures) the onsite uploader didn't work either, so here it is via photobucket:
Posted Image

This post has been edited by trooper1556: 22 August 2013 - 02:58 PM


#25 skier691

    skier691

  • Validating
  • 553 Posts:

Posted 22 August 2013 - 07:17 PM

Caribou Express,
Lutsen, MN
08/22/13

Attached File(s)


This post has been edited by skier691: 22 August 2013 - 07:19 PM


#26 skier2

    Established User

  • Member
  • 496 Posts:

Posted 23 August 2013 - 08:32 AM

View Postskier691, on 22 August 2013 - 07:17 PM, said:

Caribou Express,
Lutsen, MN
08/22/13

Still a lot of work to do there! Looks like the line was shifted over quite a bit, as well. Probably to avoid the need to do additional clearing. Gorgeous views, as ever!

#27 vons

    Established User

  • Industry II
  • 940 Posts:

Posted 24 August 2013 - 09:26 AM

not construction but a good video of a rope changehttp://vimeo.com/54237270

#28 BigSkySkier

    New User

  • Member
  • 2 Posts:

Posted 25 August 2013 - 08:00 PM

Here are some good images of the new bottom terminal locations at Bridger Bowl. They are planning are completely revamping their names for the lifts. One of the new lifts will remain Alpine while the other new lift will steal Powder Park away from the quad lift that operates out of the base. The quad will then be renamed Sunnyside. Here is the full article from the local paper in Bozeman. http://www.bozemanda...19bb2963f4.html

Attached File(s)



#29 vons

    Established User

  • Industry II
  • 940 Posts:

Posted 26 August 2013 - 10:47 AM

Those Photos are a little old, the bottom concrete work is well on its way and the top terminals should be up within the next week. I left that job about a week ago to return to school :wacko:. I'll post some shots soon, unfortunately I don't have many, I was too busy Working.

#30 skier691

    skier691

  • Validating
  • 553 Posts:

Posted 26 August 2013 - 08:03 PM

View Postskier2, on 23 August 2013 - 08:32 AM, said:

Still a lot of work to do there! Looks like the line was shifted over quite a bit, as well. Probably to avoid the need to do additional clearing. Gorgeous views, as ever!

Lift line is basically the same. The view, hard pressed to get a better view of the big lake anywhere! 2 new trails, both with winch points, were also cut on backside between The Plunge and the top of the Bull Chair....

#31 jwilliams

    New User

  • Member
  • 3 Posts:
  • Interests:mountains, weather, engineering

Posted 28 August 2013 - 06:21 AM

Towers are flying at Vail today. The Vail webcam shows two new Chair 4 towers have popped up in the past hour. I also caught a glimpse of the the helo on the cam.

http://www.vail.com/...ntain-cams.aspx

#32 Lift Dinosaur

    Established User

  • Industry II
  • 2,076 Posts:

Posted 28 August 2013 - 04:21 PM

Flying concrete for the top station of the 6 Pack at Breckenridge this week.....Attached File  1 Hooking Up.JPG (804.15K)
Number of downloads: 111Attached File  2 Hooked Up.JPG (862.18K)
Number of downloads: 140Attached File  12 Heli above top station- Upper Lift.JPG (677.98K)
Number of downloads: 99

Dino
"Things turn out best for the people that make the best of the way things turn out." A.L.

#33 vons

    Established User

  • Industry II
  • 940 Posts:

Posted 30 August 2013 - 10:32 AM

from a few weeks ago at Bridger

Attached File(s)

  • Attached File  mud.jpg (169.43K)
    Number of downloads: 75


#34 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 30 August 2013 - 12:45 PM

Leaning Towers of Gad 2 at Snowbird

http://www.snowbird....aveFields_1.jpg
- Tyler
West Palm Beach, FL - elev. 9 feet

#35 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 30 August 2013 - 06:56 PM

This picture was posted on Vail's Facebook page recently, and it shows one of the Mountaintop Express lift's terminal pieces being transported by truck up the mountain. Based on its appearance, it's going to be using detachable grips similar to those used on the Doppelmayr-CTEC high speed quads at Beaver Creek.

Attached File(s)


YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#36 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 30 August 2013 - 09:52 PM

View PostLift Dinosaur, on 28 August 2013 - 04:21 PM, said:

Flying concrete for the top station of the 6 Pack at Breckenridge this week.....Attachement 1 Hooking Up.JPGAttachement 2 Hooked Up.JPGAttachement 12 Heli above top station- Upper Lift.JPG

Dino
Leitner Poma has galleries up for lift construction on both Peak 6 lifts. Here's the one for the fixed grip quad: http://leitner-poma....d-breckenridge/ It appears that it will be a bottom drive lift, like the six pack will be.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#37 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 31 August 2013 - 04:54 AM

It'll be a top drive. The terminal you see is the fixed return wheel that goes with the Alpha drive station. The hill slopes up beyond the terminal. I imagine they wanted to trench power as little as possible, so both lifts' drives will be in the same spot.
Member, Department of Ancient Technology, Colorado chapter.

#38 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 31 August 2013 - 08:35 AM

View Postliftmech, on 31 August 2013 - 04:54 AM, said:

It'll be a top drive. The terminal you see is the fixed return wheel that goes with the Alpha drive station. The hill slopes up beyond the terminal. I imagine they wanted to trench power as little as possible, so both lifts' drives will be in the same spot.

Well I was having a hard time telling in this photo: http://leitner-poma..../2013/07/22.jpg and comparing it to pictures of the Snowflake lift, which is also bottom drive. I know that the terminals and towers will look like the Big Blue Express at Squaw (http://leitner-poma..../SQUAW-3-JF.jpg, and http://leitner-poma....2012/10/sq2.jpg). In fact, I think the new style of towerheads is a retro style, given that the tower heads slant outwards from the crossarms, like the towers on the Falcon SuperChair (http://www.panoramio.../photo/85185796).

This post has been edited by DonaldMReif: 31 August 2013 - 08:39 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#39 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 31 August 2013 - 01:22 PM

I know, I'm double posting, but Breckenridge also released this video here a few days ago: http://www.youtube.c...eature=youtu.be. Apparently, the six pack will have a custom wood skin similar to that seen on a number of European high speed quads, six packs, and eight packs. I think Breckenridge is going for the same type of terminal appearance that Crested Butte had done to their high speed quads in 2004.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#40 shelldog

    Established User

  • Industry II
  • 64 Posts:

Posted 01 September 2013 - 11:13 AM

Here are a few from Peak 6