Jump to content


How do you evacuate P2P?


  • You cannot reply to this topic
5 replies to this topic

#1 Snowy Ferries

    Established User

  • Member
  • 154 Posts:
  • Interests:Skilifts, Ferryboats, Skiing

Posted 09 May 2013 - 06:35 PM

Hey, guys. I am curious: if a catostrophic failure were to stall the Peak 2 Peak Gondola, how would you evacuate costuers? Obviosly 1,500 feet is a little bit high for a standard rope evac. I have heard about a system where you whinch carriers to towers 2 and 3, but how exacly does that work?

If I am starting a redundant topic, I apologise. I could not find this kind of thing anywhere else on the forum.

#2 Razvan

    Established User

  • Industry II
  • 323 Posts:

Posted 10 May 2013 - 07:32 AM

Hints about this were given in the Discovery Channel's "Peak to Peak - Building the World's Biggest Gondola" presentation. However, it wasn't the main focus of the documentary, and insights from an insider would be great - especially if accompanied by photos or movies. Should be a very interesting feat - the tower from the pictures resembles the Apollo's Launch Umbilical Tower, so in an emergency some neat tech would unfold. From across the pond, that's pretty much all I can contribute.

Attached File(s)



#3 Aussierob

    Lift Sparky

  • Industry II
  • 1,029 Posts:
  • Interests:Search and Rescue
    Hockey
    Ski Touring
    Geocaching

Posted 11 May 2013 - 06:55 AM

I'm trying to pry some video out of the company. Stay tuned.
Rob
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.

#4 brad82

    Established User

  • Member
  • 71 Posts:

Posted 06 August 2013 - 03:03 PM

From what I've dug up, there is a auxiliary winch on the rescue tower. As shown in the photos above there are rescue carriages that are stowed on the tower out the way of the line during normal operation. When a rescue is required the carriages are loaded onto the track ropes (note not attached to the haul rope, but the winch on the tower itself) using the cranes on the tower. The rescue carriage is then lowered to the first cabin, and then latches onto the stranded cabins hangar (using the mechanism on the right of the first photo above). The combined rescue carriage and cabin are towed by the auxiliary winch to the tower where the cabin is opened and a normal gondola style rescue can be performed by patrol from a "safe" height. The whole process is repeated over an estimated 4-5 hours [according to WB's press releases]

Hope thats not too far off, im sure Rob can clear up any details I've missed or got wrong, but it should give you an overview of how the rescue is performed.

#5 Aussierob

    Lift Sparky

  • Industry II
  • 1,029 Posts:
  • Interests:Search and Rescue
    Hockey
    Ski Touring
    Geocaching

Posted 09 September 2013 - 06:09 PM

I have requested a couple of times for the marketing people to put the rescue video up with the other P2P vids but it seems no joy so far. Brad82 has the gist of it though.
Rob
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.

#6 Ryan

    New User

  • Member
  • 24 Posts:

Posted 14 September 2013 - 05:45 AM

Isn't there a similar device for emergency evac of the Red Pine Gondola at The Canyons for the section near the top that crosses the ravine?





1 User(s) are reading this topic

0 members, 1 guests, 0 anonymous users