Well it appears that the bottom terminal of the new Schoolyard Express (17) at Mammoth is done. I can't see any foundations or towers, so they probably aren't quite that far yet.

Here is the new lower terminal from about 12:20 today.

Attached File(s)


Zack

#62 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 17 August 2004 - 05:28 PM

They dont have a whole bunch of time to get it done

#63 SkiBachelor

    Forum Administrator

  • Administrator II
  • 6,242 Posts:
  • Interests:Hi, I'm Cameron!

Posted 17 August 2004 - 06:02 PM

You will be suprised on how fast that lift will be complete. I think that lift could be running within the next two weeks. Then it goes through a series of lift tests and stuff to see if the lift is safe to transport people.
- Cameron

#64 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 17 August 2004 - 07:22 PM

foundations towers haul rope and chairs can go up in 2 weeks? I dosent even look like the cover is on the terminal

This post has been edited by snowboardguy: 17 August 2004 - 07:23 PM


#65 SkiBachelor

    Forum Administrator

  • Administrator II
  • 6,242 Posts:
  • Interests:Hi, I'm Cameron!

Posted 17 August 2004 - 07:28 PM

The towers are most likely already up and ready. You can put up all the towers in one day. The haul rope also takes one day, basically they just use a crane to pick up the haul rope and place it on the sheave trains on the towers. The terminal is basically just a pre-built model that has to be snapped together. All the wiring and controls have already been built. Carriers should only take a few days to add and this lift will be ready to move.
- Cameron

#66 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 17 August 2004 - 07:40 PM

wow thats fast...but the towers arent up

#67 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 17 August 2004 - 08:47 PM

I think the lift may have a new line because the old terminal was in a different spot then that, so the towers may actually be up, and they probably are or will be in the next 2 weeks.
Zack

#68 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 17 August 2004 - 11:24 PM

I've seen a lot of bulldozing going on to the right of the old line. I think you would see them though.

#69 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 18 August 2004 - 09:12 AM

How long should it take them to do al the load testing on it?
Thats pretty cool how they can do the whole thing in two weeks once the foundations are in
- Tyler
West Palm Beach, FL - elev. 9 feet

#70 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 18 August 2004 - 09:55 AM

looks like there doing the foundation work now.

#71 CAski

    Established User

  • Member
  • 363 Posts:

Posted 20 August 2004 - 03:12 PM

Here's another project:

Echo at Northstar is being replaced with a HSQ. They were removing the bullwheel when I was there mountain biking today. The haul rope and chairs are all down, as well as the rails to ensure that the chairs don't hit the towers. It is supposed to be completed by Christmas. It appeared as though there was going to be no room for the lift queue of the Gondola, with the extent of the construction, but now that won't matter. Appearantly, they were going to move the entire gondola building over when they built the village, but it turned out to be too expensive. Instead, they just shifted the plans. So the line will take its former course.

Oh, and they are still planning on putting another lift from the village (either in the middle or the far opposite end from the gondola) to mid-mountain in a few years from now.

So much for the mountain not being crowded from opening to about 10:00. This sounds like it could make a mess.

So when are they going to replace Pioneer?!

This post has been edited by CAski: 20 August 2004 - 03:21 PM

"Quo usque tandem abutere, Catalina, patientia nostra?" -Cicero

#72 CAski

    Established User

  • Member
  • 363 Posts:

Posted 20 August 2004 - 03:20 PM

The Chuter Chair at Mount Rose is almost up.

Posted Image
"Quo usque tandem abutere, Catalina, patientia nostra?" -Cicero

#73 SkiBachelor

    Forum Administrator

  • Administrator II
  • 6,242 Posts:
  • Interests:Hi, I'm Cameron!

Posted 20 August 2004 - 03:25 PM

Well then I guess that the new lift at Northstar will be a L-P or something since its not on my Doppelmayr installation sheet. But it makes no sense on why it would be a L-P since the other H-S lifts are Dopps and one Garaventa CTEC.
- Cameron

#74 CAski

    Established User

  • Member
  • 363 Posts:

Posted 20 August 2004 - 03:44 PM

Three possibilities:

1. Northstar was so late on the ball that they did not buy the lift until after the list was published (the lift still mostly stands). Therefore, it could still be a Doppelmayr.

2. Northstar did not like the UNI-GS and went with Poma instead, as they were probably too late to get a Stealth.

3. Poma outbid Doppelmayr.
"Quo usque tandem abutere, Catalina, patientia nostra?" -Cicero

#75 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 20 August 2004 - 06:27 PM

Very interesting. What they should do is make the Echo line a little shorter so it starts a little past the gondola building so that it isn't as close as it is now. Strange who late they are starting on this project.
Zack

#76 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 20 August 2004 - 10:38 PM

Did you get an employee to confirm this caski? On their sire they have the picture and it says "relocated echo chairlift" on the echo terminal, so they may just be moving the terminal up the line a little and taking out a tower or 2. I may be completly wrong, but that is a possibility unless you got a worker to confirm that a new lift is going in. If that is the case, they are a bit behind schedule especially if the lift isnt even down yet and its just about september. Those will be some long gondola lines untill the new lift opens......
Zack

#77 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 21 August 2004 - 07:22 AM

We saw from Diamond Peak last year that you can get a late start on a lift and still get it up in time
- Tyler
West Palm Beach, FL - elev. 9 feet

#78 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 21 August 2004 - 07:50 AM

Yes but Diamond Peak wasn't open untill the 18th of december, and that was when the lift was finished. In this case the lift will not be complete untill about a month and a half into the season. Northstar is creating quite the warzone down at the village with all of it under construction plus a lift under construction. This may be a good year to avoid the place.
Zack

#79 snowboardguy

    Established User

  • Member
  • 180 Posts:
  • Interests:SNOW

Posted 21 August 2004 - 10:31 AM

I'm going to be at northstar next week. I'll check it out.

#80 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 21 August 2004 - 02:21 PM

Squaw has a pdf for "Whats new for 04-05", so here it is:
http://www.squaw.com...newfor04-05.pdf

They say they have added restrooms on the funitel unloading deck, and the only way this is possible is if the gondola is out and part of the cabin storage was used for the facilities. They will probably keep about half of it for the mechanics and all their stuff as it is now. They also say they are putting in a new "deluxe double chairlift" so I wonder what will be so great about it.
Zack





1 User(s) are reading this topic

0 members, 1 guests, 0 anonymous users