Starting with J1, the chair that accesses the entire mountain. It is a riblet, but it has a Yan Drive terminal at the bottom. The lift runs very slow due to foot traffic riding it up to Mid Chalet, since there is no food at the parking lot. The lift also must download all guest when the lower runs are lacking snow, as it was last week. It really stinks since the QMC is out, cause the lift is pretty long, and is pretty steep.
Here is the Drive Terminal:
Attached File(s)
-
J1_1.jpg (53.59K)
Number of downloads: 81