Mt. Bachelor holiday problems


  • You cannot reply to this topic
2 replies to this topic

#1 Kelly

    Established User

  • Administrator II
  • 2,913 Posts:

Posted 02 January 2005 - 11:39 AM

3 lifts at reduced capacity--

Skyliner –Dop detachable - electric motor failure – running on diesel auxiliary
Pine Martin – Dop detachable – DC drive failure – running on diesel auxiliary
Rainbow – Long YAN triple – gearbox problems – see attachment

The operators were extremely lucky with the evac time as Rainbow chair fills up after 11:00 due to its location.

Ryan B

Attached File(s)


www.ropetech.org

#2 SkiBachelor

    Forum Administrator

  • Administrator II
  • 6,242 Posts:
  • Interests:Hi, I'm Cameron!

Posted 02 January 2005 - 11:53 AM

I noticed on Mt. Bachelor's website that Rainbow was closed yesterday and thought it was kind of odd. It's kind of weird that everything would get plaqued at once too. It kind of reminds me of a few years ago when Bachelor had that power problem and all the lifts were running on auxiliary, not fun.

Anyway, it sounds like Pine Marten is going to be replaced next year with a high-speed six-pack.
- Cameron

#3 liftmech

    lift mechanic

  • Administrator II
  • 5,906 Posts:
  • Interests:Many.

Posted 02 January 2005 - 08:05 PM

Rainbow = 1979 Yan triple = 475 gearbox? I've noticed it's the 250s that seem to fail. Of course, that is a long lift, so perhaps the box is running closer to capacity than the one on our '79 double.