Lift Construction Photos 2013


246 replies to this topic

#61 liftmech

    lift mechanic

  • Administrator II
  • 5,916 Posts:
  • Interests:Many.

Posted 03 October 2013 - 05:38 PM

I don't honestly know.
Member, Department of Ancient Technology, Colorado chapter.

#62 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 03 October 2013 - 06:41 PM

Looks like they started stringing the com lines for the Mountaintop Express today.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#63 teachme

    Established User

  • Member
  • 200 Posts:
  • Interests:Skiing, mountain climbing, mountain biking, and hiking.

Posted 04 October 2013 - 04:27 AM

Why do so many resorts leave it till so late to build lifts! I would think you would want everything done (including test runs) by mid-Sept just in case problems arose. It is a lot easier to build in July than in a snowy November. (I understand some are due to environmental mitigations, but not all I'm sure)

#64 liftmech

    lift mechanic

  • Administrator II
  • 5,916 Posts:
  • Interests:Many.

Posted 04 October 2013 - 08:29 AM

There are several factors affecting a construction timeline. Start off with contract signing. The later you are, the more folks are ahead of you in the factory queue. There aren't many lift part factories so there's limited capacity. Second, there's Forest Service approval. We didn't get their go-ahead for West Ridge until 29 August, for instance. Nothing you can do to speed that up. Third (for turn-key projects) is crew availability. The same guys building Vail's chair 4 are building our two lifts as well. There are other complications but those are the biggest, to my mind.
Member, Department of Ancient Technology, Colorado chapter.

#65 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 05 October 2013 - 02:39 PM

Photo of Peak 6 tower installation from today. This is for the Zendo lift. Attached File  Peak 6 lift installation.jpg (72.2K)
Number of downloads: 104

This post has been edited by DonaldMReif: 07 November 2013 - 08:35 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#66 teachme

    Established User

  • Member
  • 200 Posts:
  • Interests:Skiing, mountain climbing, mountain biking, and hiking.

Posted 06 October 2013 - 12:35 AM

Thanks liftmech. I can understand forest service approval, but contract signing and manufacturing again relate to the resort, not outside factors. If you sign in early it gets built early and is ready early just in case. Is it financial - sign late, pay later, less interest?

My thoughts on this were based on Lake Louise about 20 years ago when they built a lift on the backside and in load tests the top station shifted; as we working in LL were told, but may not be the whole story. As such it did not open until much later in the season and the top of the lift was a construction zone for a good part of the winter.

#67 Razvan

    Established User

  • Industry II
  • 326 Posts:

Posted 06 October 2013 - 11:00 AM

View PostDonaldMReif, on 05 October 2013 - 02:39 PM, said:

Photo of Peak 6 tower installation from today. This is the access quad. Attachement Peak 6 lift installation.jpg


Kaman K-Max K-1200 synchropter (intermeshing rotors).

#68 liftmech

    lift mechanic

  • Administrator II
  • 5,916 Posts:
  • Interests:Many.

Posted 06 October 2013 - 12:07 PM

Teachme-- you're absolutely right on the contract signing being the resort's issue. Being on the maintenance side I don't know the reasons as to why management will leave that decision for the last minute. Could be capital approval from the parent corporation or owners, loan approval from the bank unfamiliarity with the whole process, not sure.
Member, Department of Ancient Technology, Colorado chapter.

#69 JSteigs

    Established User

  • Industry II
  • 115 Posts:

Posted 06 October 2013 - 02:30 PM

Got a quick pic of the return for Caribou express at Lutsen Mountains MN.

Posted Image

#70 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 08 October 2013 - 03:01 PM

I don't know if I should assume the Kensho SuperChair will be a clockwise or an anticlockwise lift by using this photo as reference. The deeper foundation looks more likely to be that for the terminal while the one on the right is for the shack.Posted Image

This post has been edited by DonaldMReif: 07 November 2013 - 08:36 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#71 CH3skier

    Established User

  • Member
  • 364 Posts:
  • Interests:Skiing, Drag Racing, River running

Posted 09 October 2013 - 04:00 PM

Gad II splice @ Snowbird

Attached File(s)

  • Attached File  GadII.jpg (262.34K)
    Number of downloads: 116


#72 Allan

    Maintenance Manager

  • Administrator I
  • 2,745 Posts:

Posted 09 October 2013 - 06:44 PM

Towers are in!

Attached File(s)


- Allan

#73 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 10 October 2013 - 05:21 PM

Breckenridge released some more construction photos today on their Facebook page. Looks like the quad's towers are all completed. The photos also seem to show that the quad and six pack will both be clockwise lifts, based on the positioning of the foundation for the shack at the quad's top terminal.

Attached File(s)


This post has been edited by DonaldMReif: 11 October 2013 - 07:48 PM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#74 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 12 October 2013 - 12:42 PM

Vail's starting to construct the Mountaintop Express lift's bottom terminal, now that they've completed the top terminal.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#75 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 16 October 2013 - 07:41 PM

Wolf Creek

Attached File(s)


- Peter<br />
Liftblog.com

#76 liftmech

    lift mechanic

  • Administrator II
  • 5,916 Posts:
  • Interests:Many.

Posted 17 October 2013 - 05:58 AM

You know, we have the same terminal as they do, but the black colour makes theirs so much cooler :thumbsup:

I'll have some more photos from Stormy next week, perhaps. Been a little busy lower down on the hill lately. Towers are in, comline's been pulled, and I think the top terminal's in but I'm not sure. West Ridge towers are also in, and although you can see them quite well from across the hill they still don't show up on my cell phone camera.
Member, Department of Ancient Technology, Colorado chapter.

#77 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 17 October 2013 - 08:21 AM

Wolf Creek has the traditional EJ backrests. Last year's Mountaineer at Deer Valley has these plastic slat backrests I've never seen anywhere else before. Is the old style still around, or was DV's a one off?
- Tyler
West Palm Beach, FL - elev. 9 feet

#78 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 17 October 2013 - 08:40 AM

View Postfloridaskier, on 17 October 2013 - 08:21 AM, said:

Wolf Creek has the traditional EJ backrests. Last year's Mountaineer at Deer Valley has these plastic slat backrests I've never seen anywhere else before. Is the old style still around, or was DV's a one off?

Little Cloud at Snowbird got the slats last year too. I'm guessing they are better in high winds.
- Peter<br />
Liftblog.com

#79 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 17 October 2013 - 12:57 PM

View PostPeter, on 17 October 2013 - 08:40 AM, said:

Little Cloud at Snowbird got the slats last year too. I'm guessing they are better in high winds.


Definitely makes sense for that location, it's very exposed up there. Certainly isn't for comfort
- Tyler
West Palm Beach, FL - elev. 9 feet

#80 liftmech

    lift mechanic

  • Administrator II
  • 5,916 Posts:
  • Interests:Many.

Posted 17 October 2013 - 01:23 PM

Before the EJ-style carriers came around Doppelmayr put green plastic slats on every part of the chair. Most places wrapped some sort of seat pad around the bottom, though.