264 replies to this topic

#41 timberlaker

    New User

  • Industry II
  • 143 Posts:
  • Interests:waking up

Posted 28 June 2015 - 05:33 PM

Good riddance to those King Con towers. The nearist one in the photo gave me a hematoma crawling from the chair to the tower.
210105

#42 SkiDaBird

    Established User

  • Member
  • 509 Posts:
  • Interests:Skiing

Posted 28 June 2015 - 08:55 PM

View Postfloridaskier, on 28 June 2015 - 08:03 AM, said:

Yes, they're rebuilding the old Snow Hut restaurant on that spot, looks like it's a biggger footprint lined up differently farther down the hill. Hard to tell where the gondola base will be - there isn't much room down there. It looks like they've moved quite a bit of dirt around already. That area is laid out really awkwardly now, which is bad because it's the most crowded spot on either of the two mountains. It looks like they're filling in the gully at the bottom of King Con run (where before you had to go down and back up to get to Silverlode, and the Silverlode line would often extend all the way back to the Snow Hut ski racks.

Has anyone seen if they've done anything else on the gondola so far? A little surprised we can't see anything there yet

Guardsman is open, I might take a detour after a hike some time this week. Try and grab PC and Summit pictures.

This post has been edited by SkiDaBird: 28 June 2015 - 08:55 PM


#43 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 29 June 2015 - 05:55 PM

If there was any lingering doubt about whether King Con will be reused as Motherlode at PCMR:

https://instagram.com/p/4Zs91uCuXp/

PCMR seems to be posting more pictures of this on Instagram - they have one of the Crescent painting in progress there that didn't show up on the blog or on Facebook
- Tyler
West Palm Beach, FL - elev. 9 feet

#44 Backbowlsbilly

    Established User

  • Member
  • 259 Posts:

Posted 29 June 2015 - 07:04 PM

Had a chance today to go up to Vail and check out the progress on the new Chair 2 Avanti Express. Towers are still in, the bottom station is completely gone but they are still working on disassembling the top terminal, today they were using a crane to take the diesel engine out of the top terminal but the bare bones skeleton of the terminal including the bullwheel is still in place. A staging area near the top terminal has the old chairs and new parts from Doppelmayr. There are many trees along the line marked with either blue ribbons or blue paint, indicating that there will have to be some significant tree removal for the new lift line. I would guess the construction timeline for the new lift will be very similar to Chair 4 Mountaintop Express two years, it'll really pick up in the late summer.

Pictures 1,3,4,5,7,8 and 10 are various pictures of the towers standing without cable.

Picture 2 is of the top terminal skeleton.

Pictures 6 and 9 are of the new Doppelmayr parts near the top terminal.

Attached File(s)


This post has been edited by Backbowlsbilly: 29 June 2015 - 07:07 PM


#45 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 29 June 2015 - 08:59 PM

I'm wondering if Vail will reuse the tower foundations from the old lift. I don't know why I think that. On a related note, I don't think I've ever gotten a chance to see what that part of the CLD terminal's interior looked like.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#46 boardski

    Established User

  • Industry II
  • 760 Posts:

Posted 30 June 2015 - 05:53 AM

Is old lift 2 being reused or sold to another area?
Skiing since 1977, snowboarding since 1989

#47 NHskier13

    Established User

  • Member
  • 567 Posts:
  • Interests:Yes

Posted 30 June 2015 - 06:02 AM

View PostDonaldMReif, on 29 June 2015 - 08:59 PM, said:

I'm wondering if Vail will reuse the tower foundations from the old lift. I don't know why I think that. On a related note, I don't think I've ever gotten a chance to see what that part of the CLD terminal's interior looked like.

This video below is of #10 at Telluride. I think it uses somewhat similar terminals to the ones at Vail, only the exteriors are a little more squared off.
https://www.youtube....h?v=EUsYzY6ZJ7I

#48 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 30 June 2015 - 07:58 AM

I believe the original Mountaintop Express was sold to Mount Brighton in Michigan. If someone bought the old Avanti Express, I have a feeling that someone would have mentioned something on the Internet somewhere.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#49 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2015 - 01:06 PM

Some pictures of Snow King's new lift which passed its load test last week and will open Friday.

http://liftblog.com/...s-this-weekend/
- Peter<br />
Liftblog.com

#50 Backbowlsbilly

    Established User

  • Member
  • 259 Posts:

Posted 30 June 2015 - 05:55 PM

View PostDonaldMReif, on 30 June 2015 - 07:58 AM, said:

I believe the original Mountaintop Express was sold to Mount Brighton in Michigan. If someone bought the old Avanti Express, I have a feeling that someone would have mentioned something on the Internet somewhere.

Parts from Chair 4 (mainly chairs) were used at Mt. Brighton to build two new lifts. However Vail owns Mt Brighton so it wasn't sold and the new lifts are fixed grip, using new Doppelmayr terminals.

#51 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 30 June 2015 - 07:19 PM

Thanks for the clarification. I guess the right word would have been "recycled".

I'd think, looking back through the hundreds of photos I've made on the old Avanti Express, that the most significant tree removal work for the six pack would have to be between what were towers 9 and 19 on the old lift, especially on the stretch between tower 11 and 15.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#52 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 01 July 2015 - 08:27 PM

I went to Breckenridge today. While driving past Loveland, I could see the construction work done so far on Lift 2. All of the towers above the reload station are gone, although if you look in this photograph, you can see that the upper station is still there:

Posted Image
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#53 Backbowlsbilly

    Established User

  • Member
  • 259 Posts:

Posted 02 July 2015 - 05:13 PM

View Postboardski, on 30 June 2015 - 05:53 AM, said:

Is old lift 2 being reused or sold to another area?

Likely used for parts on the other CLD-260 lifts at Vail Resorts (Orient, Northwoods, and Game Creek at Vail, Arrowbahn at Beaver Creek)

#54 boardski

    Established User

  • Industry II
  • 760 Posts:

Posted 02 July 2015 - 08:02 PM

View PostDonaldMReif, on 01 July 2015 - 08:27 PM, said:

I went to Breckenridge today. While driving past Loveland, I could see the construction work done so far on Lift 2. All of the towers above the reload station are gone, although if you look in this photograph, you can see that the upper station is still there:

Posted Image

Maybe they are planning to move the upper terminal directly to the new location when it is ready. I am thinking the new upper terminal will be in the former "reload" location. Seems like a little more room. Prior to the installation of the mid-unload terminal, the reload was used for unloading instead of reloading late season and it seemed to work out great. On Loveland's facebook page, people seem rather negative about the removal of the poma lift and shortening of lift 2 but they (Loveland) had to do something, lift 2 has been the most dysfunctional lift in the state for quite awhile. The 20 minute ride from the reload to the top was no fun. It would be nice if they would relocate that platter lift to the top of the ridge though as was suggested on their FB page. Loveland did not have a response for that. Maybe the platter lift is too old to be recycled.

This post has been edited by boardski: 02 July 2015 - 08:07 PM

Skiing since 1977, snowboarding since 1989

#55 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 04 July 2015 - 11:09 AM

PCMR is continuing progress on the Interconnect. Looks like they're preparing the foundations.

This post has been edited by DonaldMReif: 04 July 2015 - 11:09 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#56 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 06 July 2015 - 06:56 AM

The newest photo as of this morning shows some trucks with parts for the new King Con and/or the Interconnect gondola.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#57 woofydoggie

    Established User

  • Member
  • 86 Posts:
  • Interests:Mechanical things

Posted 08 July 2015 - 08:44 AM

Old tubes going away at the Hermitage Club
https://instagram.co...y=hermitageclub

#58 Andy1962

    Established User

  • Member
  • 209 Posts:

Posted 08 July 2015 - 12:22 PM

View Postwoofydoggie, on 08 July 2015 - 08:44 AM, said:

Old tubes going away at the Hermitage Club
https://instagram.co...y=hermitageclub


would have been more useful to include this link below:

http://hermitageclub...-ski-lift-poles

instead of the instagram link which only had one photo. The link to the Hermitageclub.com page was on the instagram page referenced on the first link..

This post has been edited by Andy1962: 08 July 2015 - 12:26 PM


#59 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 09 July 2015 - 10:05 AM

This photo was taken on Canyons' Facebook page showing that terminal footers are in place for the Iron Mountain terminus of the interconnect.

Attached File  InterconnectCanyons.jpg (133.86K)
Number of downloads: 103
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#60 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 14 July 2015 - 08:07 PM

I walked the new Pinecone Gondola line and took some pictures. It's coming along but of course there is lots of work left to do. I'll post some pictures of King Con and Motherlode when I get a chance in the next few days. Lots of lift painting going on around PCMR as well.

http://liftblog.com/...necone-gondola/
- Peter<br />
Liftblog.com