It's August, so I thought I'd start the 2013 new lifts thread with some of the possibilities.
- Gad 2 HSQ at Snowbird
- Chair 6 replacement at Crystal
- Bonaventure 6 pack at Jay Peak
- new Kanc at Loon, old one becomes King Pine Express at Sugarloaf
- Granite Chief HSQ at Squaw
- Tamarack's HSQ will likely go in somewhere
What am I missing?
- Gad 2 HSQ at Snowbird
- Chair 6 replacement at Crystal
- Bonaventure 6 pack at Jay Peak
- new Kanc at Loon, old one becomes King Pine Express at Sugarloaf
- Granite Chief HSQ at Squaw
- Tamarack's HSQ will likely go in somewhere
What am I missing?
JSteigs
19 Aug 2012
Peter, on 19 August 2012 - 04:35 PM, said:
It's August, so I thought I'd start the 2013 new lifts thread with some of the possibilities.
- Gad 2 HSQ at Snowbird
- Chair 6 replacement at Crystal
- Bonaventure 6 pack at Jay Peak
- new Kanc at Loon, old one becomes King Pine Express at Sugarloaf
- Granite Chief HSQ at Squaw
- Tamarack's HSQ will likely go in somewhere
What am I missing?
- Gad 2 HSQ at Snowbird
- Chair 6 replacement at Crystal
- Bonaventure 6 pack at Jay Peak
- new Kanc at Loon, old one becomes King Pine Express at Sugarloaf
- Granite Chief HSQ at Squaw
- Tamarack's HSQ will likely go in somewhere
What am I missing?
Since this is speculative, I believe that Squaw is leaning towards a new Red Dog, in place of a new Granite Chief.
Also Hot Wheels at Alpine is will be replaced with a high speed, and a realignment.
boardski
19 Aug 2012
Eldora might replace Cannonball and Challenge with HSS, other projects have been talked about at Vail and Winter Park but have not progressed past that. Probably depends what kind of winter we have this coming season.
jaytrem
20 Aug 2012
Haystack in VT should be getting a new quad to connect it to the Hermitage Inn, might even go in this year. In other news they fixed up all the upper mountain lifts and started building the new base lodge. They're also still talking about the Chondola, apparently that would be built using EB5 money. Info here..
http://www.haystackc...timbers-updates
http://www.haystackc...timbers-updates
SkiBachelor
20 Aug 2012
Quote
new Kanc at Loon, old one becomes King Pine Express at Sugarloaf
Is it being replaced by a HSS?
jaytrem
20 Aug 2012
I think the Waterville Valley NH Green Peak chair has a good shot for 2013. Details here...
http://www.fs.fed.us...p?project=36652
http://www.fs.fed.us...p?project=36652
Peter
20 Aug 2012
alexboesen
20 Aug 2012
More details on the proposed Hot Wheels HSQ at http://unofficialalpine.com/?p=444
jaytrem
21 Aug 2012
Mt. Ashland OR might finally be able to expand...
http://www.therepubl...shland-Ski-Area
And Red Mountain BC has the old Alyeska quad that was upgraded this year, sounds like it would be going on Grey.
http://www.therepubl...shland-Ski-Area
And Red Mountain BC has the old Alyeska quad that was upgraded this year, sounds like it would be going on Grey.
silence
21 Aug 2012
Looks like possibly 2 new lifts on Peak 6 at Breck for '13/'14...a HSS and a fixed grip
http://www.breckenri...nfo/peak-6.aspx
http://www.breckenri...nfo/peak-6.aspx
SuperRat
21 Aug 2012
jaytrem
21 Aug 2012
silence, on 21 August 2012 - 12:44 PM, said:
Looks like possibly 2 new lifts on Peak 6 at Breck for '13/'14...a HSS and a fixed grip
http://www.breckenri...nfo/peak-6.aspx
http://www.breckenri...nfo/peak-6.aspx
Didn't realize they were considering two lifts, thought it would be one with a loading mid-station. Anyway, here is a map of the approved config...
http://a123.g.akamai...PLT2_052022.pdf
jaytrem
21 Aug 2012
Updated map at the bottom...
http://www.breckenri...of-Decision.pdf
And a couple stats from the Record of Descision...
The upper Peak 6 lift will be installed as a detachable six-person chairlift. The lift will have a slope length
of approximately 6,000 feet, a vertical rise of approximately 1,550 feet, and a design capacity of 3,000
people per hour (pph). Ground disturbance (grading) will occur for the installation of the top and bottom
terminals. This lift will be a bottom drive lift to minimize disturbance above treeline. The power line to
the top terminal will also provide power to the ski patrol/warming hut.
The lower Peak 6 lift will be installed as a fixed-grip four-person chairlift. The lift will have a slope
length of approximately 2,600 feet, a vertical rise of approximately 350 feet, and a design capacity of
2,000 people per hour (pph). Ground disturbance (grading) is required for the installation of the top and
bottom terminals. The lower Peak 6 lift will be constructed as a top drive lift.
This post has been edited by jaytrem: 21 August 2012 - 04:13 PM
liftmech
21 Aug 2012
silence, on 21 August 2012 - 12:44 PM, said:
Looks like possibly 2 new lifts on Peak 6 at Breck for '13/'14...a HSS and a fixed grip
http://www.breckenri...nfo/peak-6.aspx
http://www.breckenri...nfo/peak-6.aspx
Next question-- are they going to add another base area for these, or have them as 'access from Peak 7 only'?
Aussierob
21 Aug 2012
Right off the 2010 rumor mill, Harmony to go the Crystal zone on Blackomb and be replaced by a six pack. (if we get another winter like last year.)
liftmech
22 Aug 2012
If we get another winter like last year, I shudder to think of the cuts. Definitely no new lifts. If we have one like Rob's, however, who knows?
floridaskier
24 Aug 2012
More talk of the distant-future Deer Valley gondola to Main Street in Park City
http://www.parkrecor...rce=most_viewed
http://www.parkrecor...rce=most_viewed
jaytrem
01 Sep 2012
I notice Sun Peaks new map has a couple "Coming Soon..."s
http://www.sunpeaksr...ive-maps/alpine
Master Plan...