New Lift Construction Photos 2012
Peter
27 Apr 2012
Parts for the new Angel Peak lift are arriving at 49 Degrees North. It will be a Yan double built from 2 lifts - the Millicent double at Brighton and a lift from Copper (H-lift?) At one point, Boyne had planned on using Millicent in Bullion Basin at Crystal.
Attached File(s)
-
319884_405971392756205_169455726407774_1470971_184825331_n.jpg (38.14K)
Number of downloads: 273 -
306155_405971352756209_169455726407774_1470970_1556894382_n.jpg (39.22K)
Number of downloads: 250
liftmech
06 May 2012
It is indeed our old H-lift. Anything green is from Milly, anything faded black/grey (and the orange carriers) were ours. 49's manager helped us take it down last spring. I hadn't heard that he was going to use parts from another lift-- H was significantly longer than the Angel Peak profile requires.
Peter
25 Jun 2012
Photos of Ascutney's high speed quad being removed by helicopter:
http://thevermontsta...70087&k=dSCRJRH
http://thevermontsta...70087&k=dSCRJRH
floridaskier
01 Jul 2012
Photos of the long-anticipated removal of the Deer Crest lift at Deer Valley, making way for the Mountaineer Express high speed quad
https://www.facebook...54868313&type=3
https://www.facebook...54868313&type=3
DonaldMReif
13 Jul 2012
I don't have the photos downloaded yet, but Breckenridge replaced the chairs on the Colorado SuperChair this summer (going from the old Falcon chairs and replacing them with Omega chairs with Multix footrests). I'll add those photos to this thread when I get the time. They also appear to have added compression sheaves to tower 15 on the uphill side.
Peter
15 Jul 2012
Ted Stevens Express, Alyeska, Alaska
Untitled.jpg (396.19K)
Number of downloads: 146
IMG_2270.jpg (453.65K)
Number of downloads: 195
Expo Express, HoliMont, New York
243702_10150954364352998_700060247_o.jpg (495.77K)
Number of downloads: 142

Number of downloads: 146

Number of downloads: 195
Expo Express, HoliMont, New York

Number of downloads: 142
Andy1962
26 Jul 2012
Earl Bales Park, Toronto (North York) Ont.
One of the shorter chairlifts that Leitner Poma will replace this season. The ski hill is in a city park and is a top down ski area (chalet at top of mountain with all parking and all access from the top. LP is replacing a 5 tower double chair (only 35 chairs) with a 4 tower (+ load and unload) Quad chair. First 2 pics show the old chair still standing at the end of July 2012. In each picture, on the trail in the right hand side of each photo you can just make out the last lift tower at the top of the old chair. What looks like a construction road (brown dirt twisting path from top is actually also the route that the 3 underground conduits took to get from top to bottom (electrical, communications and whatever) . More pics later
This post has been edited by Andy1962: 26 July 2012 - 01:37 PM
One of the shorter chairlifts that Leitner Poma will replace this season. The ski hill is in a city park and is a top down ski area (chalet at top of mountain with all parking and all access from the top. LP is replacing a 5 tower double chair (only 35 chairs) with a 4 tower (+ load and unload) Quad chair. First 2 pics show the old chair still standing at the end of July 2012. In each picture, on the trail in the right hand side of each photo you can just make out the last lift tower at the top of the old chair. What looks like a construction road (brown dirt twisting path from top is actually also the route that the 3 underground conduits took to get from top to bottom (electrical, communications and whatever) . More pics later
Attached File(s)
-
HPIM1341.JPG (267.78K)
Number of downloads: 75 -
HPIM1338.JPG (340.34K)
Number of downloads: 78
This post has been edited by Andy1962: 26 July 2012 - 01:37 PM
Andy1962
26 Jul 2012
More Pictures of Earl Bales, Toronto Ont LP Quad chair build Summer 2012. First picture shows a concrete bunker (painted green) which was the old bottom station for a pair of T bar lifts that preceeded the current old chair (which was "new" 15 to 20 years ago as a second hand 25 year old lift from another Ontario Resort)
Second pic shows new bottom station frame pieces sitting next old chairlit (still standing)
Third picture shows bottom station excavation hole full of water after 2 days of heavy rain that ended the June / July drought the whole of North America is having this year.
Fourth picture shows bottom station excavation hole (looking downhill) with lift shack foundation excavation hole beside it on the left. (Bring the pumps boys )
And yes, in the two pictures posted in the previous entry, the "horizon" that you see is the top of the hill , a flat area the size of a football field. Probably one of the most expensive installations that LP will do this year on a cost per elevation foot gained basis ie Total Project Cost divided by Elevation feet gained . Any comments from the experts in the business?
Second pic shows new bottom station frame pieces sitting next old chairlit (still standing)
Third picture shows bottom station excavation hole full of water after 2 days of heavy rain that ended the June / July drought the whole of North America is having this year.
Fourth picture shows bottom station excavation hole (looking downhill) with lift shack foundation excavation hole beside it on the left. (Bring the pumps boys )
And yes, in the two pictures posted in the previous entry, the "horizon" that you see is the top of the hill , a flat area the size of a football field. Probably one of the most expensive installations that LP will do this year on a cost per elevation foot gained basis ie Total Project Cost divided by Elevation feet gained . Any comments from the experts in the business?
Attached File(s)
-
HPIM1336.JPG (279.68K)
Number of downloads: 68 -
HPIM1337.JPG (317.78K)
Number of downloads: 91 -
HPIM1339.JPG (422.91K)
Number of downloads: 83 -
HPIM1340.JPG (316.15K)
Number of downloads: 50
Peter
09 Aug 2012
Holimont, NY
holimont 2.jpg (563.51K)
Number of downloads: 96
holimont.jpg (400.48K)
Number of downloads: 129
Terry Peak, SD
terry peak.jpg (668.48K)
Number of downloads: 140
terry peak2.jpg (74.58K)
Number of downloads: 167
Hyland, MN
hyland.jpg (336.78K)
Number of downloads: 196
Seymour, BC
seymour.jpg (135.29K)
Number of downloads: 139

Number of downloads: 96

Number of downloads: 129
Terry Peak, SD

Number of downloads: 140

Number of downloads: 167
Hyland, MN

Number of downloads: 196
Seymour, BC

Number of downloads: 139
skier2
10 Aug 2012
CH3skier
15 Aug 2012
Little Cloud from SnowBird's website.
Attached File(s)
-
Little Cloud.jpg (143.66K)
Number of downloads: 76
floridaskier
15 Aug 2012
CH3skier, on 15 August 2012 - 06:04 PM, said:
Little Cloud from SnowBird's website.

Another Little Cloud shot. The top terminal is on a very narrow ridge. Will it be the same alignment or are they taking it up to the top of the tram and Mineral Basin?
Looks like they're using 6-pack width towers. Is there a reason to do that besides upgradeability to a six pack some day?
CH3skier
15 Aug 2012
floridaskier, on 15 August 2012 - 06:13 PM, said:

Another Little Cloud shot. The top terminal is on a very narrow ridge. Will it be the same alignment or are they taking it up to the top of the tram and Mineral Basin?
Looks like they're using 6-pack width towers. Is there a reason to do that besides upgradeability to a six pack some day?
Same alignment as the removed lift. I know the new towers went up very fast, maybe sat for two weeks in the parking lot. Most of the old lift towers were still in the lower parking lot as of a week and a half ago. I would guess they used the existing foundations for the new towers.
CH3skier
21 Aug 2012
skier691
21 Aug 2012
Spirit Mountain, MN 8/17/12
1st pic...new lower terminal, reused towers/line equip. and new Grand Ave Base Area Outpost
100_1598a.jpg (943.36K)
Number of downloads: 117
2nd pic... upper terminal parts, The Bong Bridge, Duluth/Superior and associated Harbor in the background.... upper terminal shell also on property.
100_1600.JPG (1.57MB)
Number of downloads: 117
1st pic...new lower terminal, reused towers/line equip. and new Grand Ave Base Area Outpost

Number of downloads: 117
2nd pic... upper terminal parts, The Bong Bridge, Duluth/Superior and associated Harbor in the background.... upper terminal shell also on property.

Number of downloads: 117
skier2
22 Aug 2012
skier691, on 21 August 2012 - 10:01 PM, said:
Spirit Mountain, MN 8/17/12
1st pic...new lower terminal, reused towers/line equip. and new Grand Ave Base Area Outpost
100_1598a.jpg
2nd pic... upper terminal parts, The Bong Bridge, Duluth/Superior and associated Harbor in the background.... upper terminal shell also on property.
100_1600.JPG
1st pic...new lower terminal, reused towers/line equip. and new Grand Ave Base Area Outpost

2nd pic... upper terminal parts, The Bong Bridge, Duluth/Superior and associated Harbor in the background.... upper terminal shell also on property.

Any chalet updates? Now they just need to tear out that double that runs adjacent, remove the summit triple and replace the gandy chair with a new quad on an extended line