New Lifts for 2012
Lift Dinosaur
27 Apr 2012
Peter-
Changes to your list:
Squaw Valley- High Camp- High Speed Six 'PhatBoy' Terminal- Leitner-Poma NOT Doppelmayr
Squaw Valley- Granite Chief Express- Posponed.
Dino
Changes to your list:
Squaw Valley- High Camp- High Speed Six 'PhatBoy' Terminal- Leitner-Poma NOT Doppelmayr
Squaw Valley- Granite Chief Express- Posponed.
Dino

Andy1962
27 Apr 2012
Lift Dinosaur
28 Apr 2012
Andy1962, on 27 April 2012 - 04:33 PM, said:
Also missing from the list is the Quad at Devil's Glen Ski Club, Glen Huron Ont. I don't know the manufacturer at this point. Does anyone else know?
The fixed grip Quad at Devil's Glen will be Leitner-Poma.
Peter- please add to your list:
Vail, CO- Gondola 10- Leitner-Poma- Vail #1
Brimacombe, ON- CL4- Leitner-Poma
Jackson Hole, WY- DCL4- Leitner-Poma- Casper
Granite Peak, WI- DCL4- Leitner-Poma- West End.

Dino
This post has been edited by Lift Dinosaur: 28 April 2012 - 06:26 AM
vons
28 Apr 2012
you can add Bryce resort new Skytrac quad replacing an SLI double http://www.brycereso.../l1c/category/6
skier691
28 Apr 2012
another Detach at Granite.....cool, wonder if the Riblet is staying on property or Lutsen bound.... Another blow to the "Big Snow Country" areas of the U.P., whos skiers must choose to drive 2 hours farther to the UP, past all the 'glitz' of Wausau....
MNSkier
28 Apr 2012
skier691, on 28 April 2012 - 11:24 AM, said:
another Detach at Granite.....cool, wonder if the Riblet is staying on property or Lutsen bound.... Another blow to the "Big Snow Country" areas of the U.P., whos skiers must choose to drive 2 hours farther to the UP, past all the 'glitz' of Wausau....
Quite possible that if they do take out the Riblet it would go to Lutsen to expand the North side of Moose as they have in their long term plan.
It is just too bad that detach isn't going in @ Lutsen.....
This post has been edited by MNSkier: 28 April 2012 - 11:50 AM
Peter
28 Apr 2012
Just to summarize what the Squaw plan is:
Remove High Camp, East Broadway, Links, Bailey's Beach and Pulse
Build a new High Camp Six Pack with a new alignment from the bottom of the existing High Camp to the top of the current East Broadway and Links.
Use some combination of the removed lifts to build a new Links lift from the bottom of the existing Links/Belmont/Bailey's Beach to the top of Silverado/Solitude
Does anyone know if in fact all of that is happening this summer?
Before map:
before.jpg (443.93K)
Number of downloads: 239
After map:
after.jpg (433.23K)
Number of downloads: 324
Updated list:
lifts.jpg (259.35K)
Number of downloads: 229
Remove High Camp, East Broadway, Links, Bailey's Beach and Pulse
Build a new High Camp Six Pack with a new alignment from the bottom of the existing High Camp to the top of the current East Broadway and Links.
Use some combination of the removed lifts to build a new Links lift from the bottom of the existing Links/Belmont/Bailey's Beach to the top of Silverado/Solitude
Does anyone know if in fact all of that is happening this summer?
Before map:

Number of downloads: 239
After map:

Number of downloads: 324
Updated list:

Number of downloads: 229
nathanvg
28 Apr 2012
skier691, on 28 April 2012 - 11:24 AM, said:
another Detach at Granite.....cool, wonder if the Riblet is staying on property or Lutsen bound.... Another blow to the "Big Snow Country" areas of the U.P., whos skiers must choose to drive 2 hours farther to the UP, past all the 'glitz' of Wausau....
A 2nd HS lift would be a first for the Midwest (unless you count Blue Mt, Ontario or Terry Peak, SD) Any other details on the new lift at granite. Is it just a replacement for the triple on the west side or is it new terrain too? I think big snow country has way better skiing than Granite but Granite's location plus improving lift infrastructure will make it hard to pass.
Lift Dinosaur
28 Apr 2012
nathanvg, on 28 April 2012 - 01:12 PM, said:
A 2nd HS lift would be a first for the Midwest (unless you count Blue Mt, Ontario or Terry Peak, SD) Any other details on the new lift at granite. Is it just a replacement for the triple on the west side or is it new terrain too? I think big snow country has way better skiing than Granite but Granite's location plus improving lift infrastructure will make it hard to pass.
Not true- Alpine Valley, WI has THREE detachables...unless you don't count WI as being in the Midwest!

Dino
jaytrem
28 Apr 2012
Jay Peak is adding a short quad to replace a dead t-bar, L-P maybe. Different allingment. They postponed the other upgrades, Boneventure 6, and move the current Boneventure to Jet.
nathanvg
28 Apr 2012
skier2
29 Apr 2012
Lift Dinosaur, on 28 April 2012 - 06:25 AM, said:
The fixed grip Quad at Devil's Glen will be Leitner-Poma.
Peter- please add to your list:
Vail, CO- Gondola 10- Leitner-Poma- Vail #1
Brimacombe, ON- CL4- Leitner-Poma
Jackson Hole, WY- DCL4- Leitner-Poma- Casper
Granite Peak, WI- DCL4- Leitner-Poma- West End.

Dino
GOOD GOD another DCL4 for Granite Peak when Lutsen has crumbling Yan doubles and the resorts are commonly owned.........
missouriskier
30 Apr 2012
skier2, on 29 April 2012 - 05:58 PM, said:
GOOD GOD another DCL4 for Granite Peak when Lutsen has crumbling Yan doubles and the resorts are commonly owned.........
I'm glad to see Granite Peak get another high speed lift, especially because I've heard they get busy on the holidays with all of the traffic from Chicago. While Lutsen may have much older lifts, the Donner Triple was really slow, probably not much faster than 300 fpm. Honestly, I preferred the center-pole doubles at Devil's Head because they were quite a bit faster.
JSteigs
30 Apr 2012
Peter, on 28 April 2012 - 11:59 AM, said:
Just to summarize what the Squaw plan is:
Remove High Camp, East Broadway, Links, Bailey's Beach and Pulse
Build a new High Camp Six Pack with a new alignment from the bottom of the existing High Camp to the top of the current East Broadway and Links.
Use some combination of the removed lifts to build a new Links lift from the bottom of the existing Links/Belmont/Bailey's Beach to the top of Silverado/Solitude
Does anyone know if in fact all of that is happening this summer?
Before map:
before.jpg
After map:
after.jpg
Updated list:
lifts.jpg
Remove High Camp, East Broadway, Links, Bailey's Beach and Pulse
Build a new High Camp Six Pack with a new alignment from the bottom of the existing High Camp to the top of the current East Broadway and Links.
Use some combination of the removed lifts to build a new Links lift from the bottom of the existing Links/Belmont/Bailey's Beach to the top of Silverado/Solitude
Does anyone know if in fact all of that is happening this summer?
Before map:

After map:

Updated list:

Most of this yes. I don't believe that Baileys Beach is being removed, the Pulse was taken out last year, and there will be a surface lift built for terrain park access. Squaw put out a video a while ago outlining this years lift work. http://www.youtube.c...v=rMxlGRXZZGo#!
CH3skier
08 May 2012
Today on Facebook, Snowbird mentioned that they are trying to sell the Little Cloud lift to a resort on the East coast.
Peter
08 May 2012
Tanglwood, PA's two lifts were sold today at auction
Borvig double -> Kissing Bridge, NY
Hall double -> Plattekill, NY
Borvig double -> Kissing Bridge, NY
Hall double -> Plattekill, NY
Peter
10 May 2012
Alyeska's Chair 4 (Poma Alpha quad) was apparently sold to a resort in BC.
Allan
10 May 2012
jaytrem
11 May 2012
Allan
11 May 2012
Oh we do, but I'll have to wait for the official release.. sorry :)