#41 boardski

    Established User

  • Industry II
  • 760 Posts:

Posted 24 December 2011 - 08:18 PM

I wonder if #16 (VB) will show up recycled somewhere else on the mountain either in high speed or as a fixed grip form (similar to what Snowmass did with Fanny Hill lift). Gondola definately sounds like a wise choice for an upgrade out of that base area.
Skiing since 1977, snowboarding since 1989

#42 vons

    Established User

  • Industry II
  • 940 Posts:

Posted 25 December 2011 - 05:56 AM

I think #16 will end up parted out to the other 5 old dopp quads vail has. The lift has too many hours and is to worn out to be of any value as a reinstal

#43 skierdude9450

    Established User

  • Member
  • 1,484 Posts:
  • Interests:Skiing, sailing, music.

Posted 26 December 2011 - 09:51 PM

Sounds like a solid plan, but what kind of gondola has a 3,600 p/h capacity? Unless they plan on building a funitel or 3S, I think they'd be pretty hard pressed to dramatically increase the capacity from a detachable quad. In any case I'm looking forward to this improvement.
-Matt

"Today's problems cannot be solved by the level of thinking that created them." -Albert Einstein

#44 Phalanger

    New User

  • Member
  • 21 Posts:

Posted 27 December 2011 - 03:55 AM

View PostBogong, on 14 September 2011 - 05:30 AM, said:

New quad at Mt Buller, Victoria, Australia to be built December 2011 to March 2012.

Burnt Hut was the triple chair serving a green run that was zapped by lightning 18 months ago. It was removed and temporarily replaced with carpets for the 2010 and 2011 ski seasons]


I believe they got a fairly nice insurance pay out which may have been much better than simply having to replace the lift for age.

#45 Lift Dinosaur

    Established User

  • Industry II
  • 2,076 Posts:

Posted 27 December 2011 - 07:31 AM

View Postskierdude9450, on 26 December 2011 - 09:51 PM, said:


Sounds like a solid plan, but what kind of gondola has a 3,600 p/h capacity? Unless they plan on building a funitel or 3S, I think they'd be pretty hard pressed to dramatically increase the capacity from a detachable quad. In any case I'm looking forward to this improvement.


10 passenger cabins.....
Dino

This post has been edited by Lift Dinosaur: 27 December 2011 - 07:31 AM

"Things turn out best for the people that make the best of the way things turn out." A.L.

#46 mikest2

    Mountain Operations

  • Administrator I
  • 1,204 Posts:

Posted 27 December 2011 - 08:28 PM

View Postskierdude9450, on 26 December 2011 - 09:51 PM, said:

Sounds like a solid plan, but what kind of gondola has a 3,600 p/h capacity? Unless they plan on building a funitel or 3S, I think they'd be pretty hard pressed to dramatically increase the capacity from a detachable quad. In any case I'm looking forward to this improvement.

1800 uphill, 1800 downhill, Marketing will love it !
...Mike

#47 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 27 December 2011 - 09:00 PM

View PostLift Dinosaur, on 27 December 2011 - 07:31 AM, said:



10 passenger cabins.....
Dino

Sounds like Dino's in the know. Must be a L-P project?
- Peter<br />
Liftblog.com

#48 Kicking Horse

    Established User

  • Industry I
  • 3,071 Posts:
  • Interests:Chairlifts

Posted 27 December 2011 - 09:17 PM

View PostSkier, on 27 December 2011 - 09:00 PM, said:

Sounds like Dino's in the know. Must be a L-P project?


One could simply do the math as well and figure it out...
Jeff

#49 Kicking Horse

    Established User

  • Industry I
  • 3,071 Posts:
  • Interests:Chairlifts

Posted 03 January 2012 - 07:35 PM

How many cabins will it have? And what power plants if you know the info...
Jeff

#50 Aussierob

    Lift Sparky

  • Industry II
  • 1,036 Posts:
  • Interests:Search and Rescue
    Hockey
    Ski Touring
    Geocaching

Posted 04 January 2012 - 05:29 AM

We have three of those "old high-hour" installations and could probably use a few parts. Can they throw them to Canada? :wink:
Rob
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.

#51 teachme

    Established User

  • Member
  • 200 Posts:
  • Interests:Skiing, mountain climbing, mountain biking, and hiking.

Posted 04 January 2012 - 07:08 AM

Aussierob,

Wizard, Solar and Seventh?? Keep wondering when they will be replaced due to sheer age. Went in in 85??? so about 26 years old? Whistler Gondala was also 88 I think so getting a bit old too.

General question, how long does a good HS quad live until it gets to be like an old car, cheaper and more reliable to replace than fix?

#52 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 04 January 2012 - 08:19 AM

About 25 years, in my book. Mine is 26 years old this year and while I'm not signing the receipts for the parts, I know they're not getting any cheaper and I'm replacing more every year. If I had an unlimited budget I could make the thing run for many more years, but there won't be many original parts left at the end of that time.

This morning on the radio I heard that Vail's new super-cool gondi will be an L-P.
Member, Department of Ancient Technology, Colorado chapter.

#53 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 13 January 2012 - 12:38 PM

Spirit Mountain, MN is planning to replace their 28-year old High Speed Quad with a new one: http://www.duluthnew...icle/id/219781/
- Peter<br />
Liftblog.com

#54 Andy1962

    Established User

  • Member
  • 209 Posts:

Posted 13 January 2012 - 03:50 PM

Devil's Glen, a private member owned ski club in Glen Huron, Ont, will replace a 1969 Hall double (Hades double) with a Quad chair on about the same alignment, The new chair will be slightly longer and higher than the current chair. Hades current stats are length: 1440 feet vert: 455 feet Capacity: 1200 per hour

This replacement will be done in summer 2012

In summer 2013 Devil's Glen will move the Lucifer Quad, a 1991 Borvig quad, to replace a mid 1960's T bar (Hallelujah T bar)

(source: Devil's Glen ski club's fall 2011 newsletter)

#55 Aussierob

    Lift Sparky

  • Industry II
  • 1,036 Posts:
  • Interests:Search and Rescue
    Hockey
    Ski Touring
    Geocaching

Posted 13 January 2012 - 06:40 PM

View Postteachme, on 04 January 2012 - 07:08 AM, said:

Aussierob,

Wizard, Solar and Seventh?? Keep wondering when they will be replaced due to sheer age. Went in in 85??? so about 26 years old? Whistler Gondala was also 88 I think so getting a bit old too.

General question, how long does a good HS quad live until it gets to be like an old car, cheaper and more reliable to replace than fix?

Wiz/Solar /7th are '87 installs. Wizard has nearly 70k hours on it and the village gondola is just about to turn over 80k. The problem is parts availability, particularly for electronics. To be honest, I think we will have these forever unless the powers that be want something different e.g Wizard replaced with a gondola.
Rob
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.

#56 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 13 January 2012 - 08:25 PM

I can sympathise with the parts issues-- half the time when I order parts your mechanics have beaten me to them :devil: One year I needed fixed jaws for my grips but I was told the entire inventory went to the Village Gondola.
Member, Department of Ancient Technology, Colorado chapter.

#57 SuperRat

    Established User

  • Industry II
  • 311 Posts:

Posted 03 February 2012 - 01:33 PM

Press Release ...

NEW HAMPSHIRE SKI RESORT GETS FIRST HIGH SPEED QUAD LIFT

Peak Resorts announces the acquisition of the high speed detachable quad chairlift formerly of Ascutney Mountain, VT. The installation of the lift, along with a terrain expansion is planned at Crotched Mountain, NH for the 2012-2013 season. This 3 million dollar capital investment will happen on the 10 year anniversary of the reconstruction of the resort.

We are very excited about the prospect of adding a detachable lift at Crotched Mountain. This lift will provide quick access to the summit, ultimately providing more value and vertical to our guests. Along with the lift, the addition of 25 acres of skiable terrain will be a significant upgrade for the resort.", said Jesse Boyd, VP of Operations for Peak Resorts.

While replacing the current Summit fixed grip lift, the only high speed quad lift in Southern NH will provide an uphill capacity of 2400 persons per hour, and access to an additional 25 acres of terrain in less than 4 minutes of time on the lift. The additional terrain access is accomplished by the extension of the current summit lift profile to the top of the mountain, approaching 1000 feet of vertical drop. The additional 25 acres of terrain will encompass three extra slopes and two glade areas. The new terrain will have 100 percent fan snowmaking coverage as well as being lit for night skiing.

"We at Crotched pride ourself on the commitment of service to all skiing and snowboarding guests from beginners all the way to expert terrain park and racing enthusiasts. The ability for us to provide the value of even more time on the slopes is very exciting. The expansion of terrain will benefit all of our clientele with an easier route off the top of the mountain and trails that will access our progressive terrain parks, glade skiing and allow us to stay committed to the ski racing culture of New Hampshire.", said Pat Terry, General Manager of Crotched Mountain.

Lift construction and trail development are scheduled to take place starting the spring of 2012 pending approval of permitting with NH State and local township regulations.

#58 SkiLiftsRock

    Established User

  • Industry II
  • 302 Posts:
  • Interests:Industrial Engineering

Posted 03 February 2012 - 08:12 PM

CROTCHED TO INSTALL FIRST DETACHABLE QUAD IN SOUTHERN N.H.
February 3, 2012

SAM Magazine--February 3, 2012--Peak Resorts, the parent company of Crotched Mountain, N.H., announced the acquisition of the high speed detachable quad at Ascutney Mountain, which has closed its doors. Crotched will install the 5,000+-foot lift this coming summer.

The Garaventa CTEC lift will replace a fixed grip lift and access an additional 25 acres of terrain, which will be covered 100 percent with fan gun snowmaking. The total cost of the project will be $3 million.

Link to Post: http://goo.gl/W8Jkg

#59 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 09 February 2012 - 05:29 PM

Can anyone identify this Riblet double in Michigan? It sounds as though it's being replaced this summer.

http://www.resortbon...uble-chair/2560

Big Powderhorn, Indianhead, or Blackjack maybe?
- Peter<br />
Liftblog.com

#60 Andoman

    Established User

  • Member
  • 395 Posts:
  • Interests:Winning the lotto

Posted 09 February 2012 - 06:19 PM

View PostSkier, on 09 February 2012 - 05:29 PM, said:

Can anyone identify this Riblet double in Michigan? It sounds as though it's being replaced this summer.

http://www.resortbon...uble-chair/2560

Big Powderhorn, Indianhead, or Blackjack maybe?


With the quoted vertical it would have to be Bohemia, but the description and lift doesn't look right. Lusten?

This post has been edited by Andoman: 09 February 2012 - 06:21 PM