New Lift Construction Photos 2011
floridaskier
25 Jul 2011
What's at the bottom terminal that required them to build it like that? It looks like it's right in the middle of a hillside by the train tracks
Andy1962
26 Jul 2011
floridaskier, on 25 July 2011 - 08:29 PM, said:
What's at the bottom terminal that required them to build it like that? It looks like it's right in the middle of a hillside by the train tracks
In answer to the question why is the lift built right beside some train tracks? - the answer is that the lift is being built as a transportation lift to take people from a train station to the ski resort
Emax
26 Jul 2011
Jonni, on 28 March 2011 - 06:31 AM, said:
Mount Snow, VT has begun/is well on there way to having the Summit Local/Lift 17 dismantled for the new bubble 6-Pack:
http://mountsnow.com/live-cams/
http://mountsnow.com...ry/bubble-blog/
http://mountsnow.com/live-cams/
http://mountsnow.com...ry/bubble-blog/
reminder... there / their / they're
lastchair_44
26 Jul 2011
There is a pulse gondola in St. Thomas that has vertical bullwheels at the bottom station as well.
Lift Dinosaur
27 Jul 2011
Allan
27 Jul 2011
Wow.. I hope they don't have to carry a spare on the work deck! It doesn't look like there's enough room from the bottom terminal to the first support tower for all the negative sheave assemblies it would require to change the angle of the rope!
Jonni
01 Aug 2011
jaxxex
04 Aug 2011
demolition of superior @ bogus basin
This post has been edited by jaxxex: 04 August 2011 - 12:06 PM
This post has been edited by jaxxex: 04 August 2011 - 12:06 PM
LuvPow
08 Aug 2011
Flying concrete Marmot Basin -Jasper Alberta
This post has been edited by LuvPow: 08 August 2011 - 07:56 AM
This post has been edited by LuvPow: 08 August 2011 - 07:56 AM
skiersage
09 Aug 2011
http://www.crystalmo...LokiLift_Photos
Crystal mt Michigan has photos of the goings on at loki. There used to be a hall double next to the ctec triple but now that is completely gone. they are re grading the slope as well.
Crystal mt Michigan has photos of the goings on at loki. There used to be a hall double next to the ctec triple but now that is completely gone. they are re grading the slope as well.
Lift Dinosaur
10 Aug 2011
vons
10 Aug 2011
Copper's new H. They have named it "Union Creek High Speed....I forgot the rest, it doesn't exactly roll of the tongue.
Attached File(s)
-
uchslb.jpeg (32.96K)
Number of downloads: 138 -
uchsltjpeg.jpeg (22.75K)
Number of downloads: 141
iceberg210
10 Aug 2011
vons, on 10 August 2011 - 04:18 PM, said:
Copper's new H. They have named it "Union Creek High Speed....I forgot the rest, it doesn't exactly roll of the tongue.
Looks nice, still think it should be called HEX.
Lift Dinosaur
11 Aug 2011
vons
11 Aug 2011
Yup. Not sure when LM will start building it. The project is ahead of schedule by about a month so it's looking like end of Sep. Early Oct load test.
Lift Dinosaur
12 Aug 2011
Some pictures from Alpine Valley, WI. Just waiting for towers to show up from galvanizing- crossarms and sheaves on-site.
Alpine Valley, WI Bottom Terminal.jpg (324.94K)
Number of downloads: 110
Alpine Valley, WI Bottom Drive-Tension.jpg (374.63K)
Number of downloads: 137
Alpine Valley, WI Top Return.jpg (171.38K)
Number of downloads: 137
Alpine Valley, WI Down the Line.jpg (413.72K)
Number of downloads: 102
Dino
Alpine Valley, WI Bottom Terminal.jpg (324.94K)
Number of downloads: 110
Alpine Valley, WI Bottom Drive-Tension.jpg (374.63K)
Number of downloads: 137
Alpine Valley, WI Top Return.jpg (171.38K)
Number of downloads: 137
Alpine Valley, WI Down the Line.jpg (413.72K)
Number of downloads: 102
Dino
floridaskier
12 Aug 2011
Lift Dinosaur, on 12 August 2011 - 08:02 AM, said:
Some pictures from Alpine Valley, WI. Just waiting for towers to show up from galvanizing- crossarms and sheaves on-site.
Alpine Valley, WI Bottom Terminal.jpg
Alpine Valley, WI Bottom Drive-Tension.jpg
Alpine Valley, WI Top Return.jpg
Alpine Valley, WI Down the Line.jpg
Dino
Dino
New logo for Leitner Poma? Not sure it's an upgrade, looks like it came out of the 70s.
I thought future Poma high speed quads were going to have the same terminal style as High Noon at Vail. Are other LP detachables this summer using the old design or the newer one?
skier691
12 Aug 2011
floridaskier, on 12 August 2011 - 03:35 PM, said:
New logo for Leitner Poma? Not sure it's an upgrade, looks like it came out of the 70s.
I thought future Poma high speed quads were going to have the same terminal style as High Noon at Vail. Are other LP detachables this summer using the old design or the newer one?
This lift was ordered last year...I believe the owner wanted one similar to his other ones, this being the 3rd one installed there on this tiny hill. Very nice terminal, I toured it on Wednesday.
skiersage
13 Aug 2011
skier691, on 12 August 2011 - 06:50 PM, said:
This lift was ordered last year...I believe the owner wanted one similar to his other ones, this being the 3rd one installed there on this tiny hill. Very nice terminal, I toured it on Wednesday.
Similar to one of the others anyway. I know that the existing two are mis matched. One is a challenger, the other is an early omega.
Lift Dinosaur
13 Aug 2011
floridaskier, on 12 August 2011 - 03:35 PM, said:
New logo for Leitner Poma? Not sure it's an upgrade, looks like it came out of the 70s.
I thought future Poma high speed quads were going to have the same terminal style as High Noon at Vail. Are other LP detachables this summer using the old design or the newer one?
The new logo was unveiled at the LPOA Annual Meeting in January, which celebrated 30 years in North America. Some felt it was time for a logo change and a new direction for the next 30 years.
Both Alpine Valley (who actually ordered their lift last year as stated by skier691) and Marmot Basin, AB got the last 2 Omega terminals as they already had this grip in service. The remainder are the LPA grip and terminal like High Noon at Vail.
Dino

