Here is the install LP is doing for Edelweiss in Wakefield Quebec.. little place needs some TLC (used lift from Stratton)
125.sm.JPG (131.52K)
Number of downloads: 128
130.sm.JPG (86.93K)
Number of downloads: 152
131.sm.JPG (127.94K)
Number of downloads: 130
125.sm.JPG (131.52K)
Number of downloads: 128
130.sm.JPG (86.93K)
Number of downloads: 152
131.sm.JPG (127.94K)
Number of downloads: 130
SkiBachelor
11 Sep 2010
floridaskier
12 Sep 2010
From the base area at The Canyons. They've hardly done anything yet at the base area, it looks like
http://thecanyons.co...224355photo.JPG
http://thecanyons.co...224355photo.JPG
floridaskier
13 Sep 2010
More from The Canyons. They have a facebook album up now with some new pictures of the Iron Mountain run cutting, snowmaking pond, new cabins, and flying concrete for the new high speed quad, which is pretty much confirmed to be called Lookout Express now. Hopefully they update this more later on
http://www.facebook....65017191&ref=mf
http://www.facebook....65017191&ref=mf
chairliftsrcool
17 Sep 2010
Here are a few pictures of the Black Mountain Express at Arapahoe Basin from Labor Day weekend.
Attached File(s)
-
DSCN1792-115.jpg (1.4MB)
Number of downloads: 76 -
_MG_8424-135.jpg (1.46MB)
Number of downloads: 69
chairliftsrcool
17 Sep 2010
More pictures of Black Mountain Express.
Attached File(s)
-
DSCN1788-111.jpg (1.99MB)
Number of downloads: 29
chairliftsrcool
17 Sep 2010
More Pictures, the files are really large.
Attached File(s)
-
IMG_8443-154.jpg (1.72MB)
Number of downloads: 45
chairliftsrcool
17 Sep 2010
More Pictures, large files.
Attached File(s)
-
IMG_8441-152.jpg (1.68MB)
Number of downloads: 13
chairliftsrcool
17 Sep 2010
More Pictures, Large Files.
Attached File(s)
-
IMG_8455-166.jpg (1.84MB)
Number of downloads: 43
sseguin613
19 Sep 2010
LuvPow, on 10 September 2010 - 08:05 PM, said:
Here is the install LP is doing for Edelweiss in Wakefield Quebec.. little place needs some TLC (used lift from Stratton)
125.sm.JPG
130.sm.JPG
131.sm.JPG
When were these pictures taken? To me, it looks like it is going up the exact same path as the old double poma chair. But MSSI have confirmed there will be two new trails cut in this area to compliment the lift. I was actually thinking of driving there to take a look at the progress today, but if all they have mostly done is the tower foundations, then I won't bother and wait another month or so. Thanks for the posting
Can I ask, can you tell if it will be top drive or bottom drive? The lift from Stratton was top drive so I would assume it would be the same here but since you were there, can you tell by the foundations at the bottom, if it was narrow or wide (to accomodate the alpha series drive)?
Thanks
This post has been edited by sseguin613: 19 September 2010 - 05:10 AM
LuvPow
21 Sep 2010
sseguin613, on 19 September 2010 - 05:07 AM, said:
When were these pictures taken? To me, it looks like it is going up the exact same path as the old double poma chair. But MSSI have confirmed there will be two new trails cut in this area to compliment the lift. I was actually thinking of driving there to take a look at the progress today, but if all they have mostly done is the tower foundations, then I won't bother and wait another month or so. Thanks for the posting
Can I ask, can you tell if it will be top drive or bottom drive? The lift from Stratton was top drive so I would assume it would be the same here but since you were there, can you tell by the foundations at the bottom, if it was narrow or wide (to accomodate the alpha series drive)?
Thanks
Can I ask, can you tell if it will be top drive or bottom drive? The lift from Stratton was top drive so I would assume it would be the same here but since you were there, can you tell by the foundations at the bottom, if it was narrow or wide (to accomodate the alpha series drive)?
Thanks
I took them the first of Sept., the drive will be at the bottom. It is a new lift line, but parallels the detach they have there... they have a short double near it that they have stopped operating. All the concrete should be done end of this week I've been told.
sseguin613
22 Sep 2010
Looking at your picture, it seems to be going the same way up the original path. But I could be wrong, it is just one picture. But thanks for the info.
Andy1962
22 Sep 2010
construction photos for all the changes going on at Le Massif this year.
(gondola, new beginners area etc ($16 million dollars in changes)
http://www.lemassif....ies?doc_id=1691
(when the first photo finishes opening, hit close on the open photo to see the whole page of available photos.)
This post has been edited by Andy1962: 22 September 2010 - 03:26 PM
(gondola, new beginners area etc ($16 million dollars in changes)
http://www.lemassif....ies?doc_id=1691
(when the first photo finishes opening, hit close on the open photo to see the whole page of available photos.)
This post has been edited by Andy1962: 22 September 2010 - 03:26 PM
skier691
26 Sep 2010
Been watching the progress of a new Dopp. at Welch Village, MN, via webcam. 10" of rain upstream has caused record breaking flooding, which now is at the parking lots edge.
LuvPow
26 Sep 2010
sseguin613, on 22 September 2010 - 02:43 PM, said:
Looking at your picture, it seems to be going the same way up the original path. But I could be wrong, it is just one picture. But thanks for the info.
Yea, I don't know the ski area at all... there might have been a lift there at one time, there was not one there this summer before they started
sseguin613
27 Sep 2010
Ok, no they had taken down the old double back in April. But yes it looks like it is the same path up. Although going from what I've heard, will go a bit farther up. In any case, an improvement since the double would run 2-3 times a year.
MSSI have posted pictures on their site. www.edelweissvalley.com
This post has been edited by sseguin613: 27 September 2010 - 02:58 AM
MSSI have posted pictures on their site. www.edelweissvalley.com
This post has been edited by sseguin613: 27 September 2010 - 02:58 AM
Kicking Horse
28 Sep 2010
BM Express is done and is in testing phase. Video was posted there facebook group. Looking mighty nice.