New Lift Construction Photos 2009
Peter
08 May 2009
Well this came as a surprise, the towers and terminals for White Pass' 2 new quads (1 fixed and 1 detachable) for the Hogback Basin expansion have arrived and are being dragged up the mountain over snow. I believe these lifts aren't supposed to be finished for 2 summers, but they are wasting no time getting started. Doppelmayr CTEC is doing the installation I think.
Attached File(s)
-
firsttower.jpg (18.31K)
Number of downloads: 141 -
Semi_load_1.jpg (98.41K)
Number of downloads: 138
vons
10 May 2009
excess supply and future legal uncertainty may be facctor in doing the expansion this year vs later.
Peter
12 May 2009
Red lift at Red River, NM starting to come down, photo from Flickr.
Attached File(s)
-
3520788877_e77db6fa53_o.jpg (276.81K)
Number of downloads: 167
cfrankrun58
13 May 2009
Sun Valley appears to be working on the River Run gondola hear is a link to there web cams page.
http://www.sunvalley...o/mtn.cams.aspx
cfrankrun58
http://www.sunvalley...o/mtn.cams.aspx
cfrankrun58
Peter
13 May 2009
Marmot Basin
Attached File(s)
-
1242249650_pod.jpg (77.62K)
Number of downloads: 118
RibStaThiok
16 May 2009
DonaldMReif
09 Jun 2009
Peter
10 Jun 2009
Haul rope time at Eaglecrest, Alaska:
20090608032429.jpg (346.61K)
Number of downloads: 115
The liftline for Marmot Basin, Alberta's new Canadian Rockies Express:
1244646914_pod.jpg (275.84K)
Number of downloads: 112

Number of downloads: 115
The liftline for Marmot Basin, Alberta's new Canadian Rockies Express:

Number of downloads: 112
Peter
24 Jun 2009
Pictures of the new Roundhouse Gondola at Sun Valley. It seems Roundhouse Gondola is the name being used instead of River Run Gondola™. (It is a Vail Resorts trademark)
Attached File(s)
-
unloading2.jpg (151.04K)
Number of downloads: 43 -
car.jpg (140.59K)
Number of downloads: 50 -
unloading1.jpg (164.93K)
Number of downloads: 80 -
terminal2.jpg (158.42K)
Number of downloads: 149 -
terminal1.jpg (155.68K)
Number of downloads: 135
Keymech
25 Jun 2009
skierdude9450
25 Jun 2009
DonaldMReif
05 Jul 2009
cfrankrun58, on 13 May 2009 - 09:39 AM, said:
Sun Valley appears to be working on the River Run gondola hear is a link to there web cams page.
http://www.sunvalley...o/mtn.cams.aspx
cfrankrun58
http://www.sunvalley...o/mtn.cams.aspx
cfrankrun58
It just replaces Exhibition, and keeps the old high speed quad (when looking at the cam). However, it will now be a little more inconvenient to try and get there directly if you're the type of person who prefers chairlifts over gondolas, since you now have to enter from the Lookout Express.
SkiBachelor
06 Jul 2009
I'm not sure if it's happening next summer or the following, but Christmas Express at Sun Valley will be removed when the second stage of the Roundhouse Gondola is built.
Peter
06 Jul 2009
More pictures of the Sun Valley Gondola from their website...
Attached File(s)
-
p61700091.jpg (1.22MB)
Number of downloads: 84 -
p7010012-1.jpg (1.07MB)
Number of downloads: 92 -
p61100051.jpg (1.17MB)
Number of downloads: 93 -
p62300011.jpg (1.41MB)
Number of downloads: 72
floridaskier
06 Jul 2009
Too bad about Christmas at Sun Valley being removed. Yan teardrop chairs are a rare sight now, and I'm not a fan of gondolas in areas that people might want to ski laps on
Peter
06 Jul 2009
floridaskier, on 06 July 2009 - 07:12 PM, said:
Too bad about Christmas at Sun Valley being removed. Yan teardrop chairs are a rare sight now, and I'm not a fan of gondolas in areas that people might want to ski laps on
The removal of Christmas is in the master plan although in phase 3. Right now is the middle of phase 1. Sun Valley's ultimate plan is to replace both Christmas and Challenger with gondolas and build 6 new detachable quads (2 expansions and 2 replacements on Baldy and 2 replacements on Dollar). The replacements of Cold Springs and Mayday along with the Turkey Bowl Expansion lift are all ahead of the Christmas gondola in the current master plan phasing. It seems probable that SV will reuse both detachable quads or at least sell them to another resort.
Peter
10 Jul 2009
Some pictures from White Pass. These look like they were taken at the top of the new fixed grip quad, not the new detachable. Still can't believe it's not opening this year!
Attached File(s)
-
070209_GK_WhitePassliftwork1.jpg (33.13K)
Number of downloads: 63 -
070209_GK_WhitePassliftwork3.jpg (67.86K)
Number of downloads: 77 -
070209_GK_WhitePassliftwork5.jpg (59.14K)
Number of downloads: 71 -
070209_GK_WhitePassliftwork6.jpg (54.67K)
Number of downloads: 77 -
070209_GK_WhitePassliftwork8.jpg (56.84K)
Number of downloads: 62
ewillso7
11 Jul 2009
Whatever happened to PCMR putting in a people mover from the Town lift area to the Payday area
sphrrt
12 Jul 2009
ewillso7, on 11 July 2009 - 10:50 AM, said:
Whatever happened to PCMR putting in a people mover from the Town lift area to the Payday area
Are you referring to the Treasure Hill development which will realign Town Lift w/a high speed quad and add a people mover of some sort from the existing Town Lift plaza to the base of the new lift? If so, the update is that the City Council hasn't formally approved the development plan and w/the current economy, I'm betting nothing will be built for at least a few more seasons...
Peter
21 Jul 2009
I found a few pictures of the Timing Flats lift at Whistler Creekside. Looks like it runs right next to the Creekside Gondola. It's hard to tell but it looks like it might be a Uni-G, not a Uni-GS.




