New Lift Construction Photos 2008
SuperRat
06 Nov 2008
SuperRat
08 Nov 2008
Andoman
08 Nov 2008
Jonni
12 Nov 2008
Some more pictures of Killington's new Skye Peak Express are up today. They just put the drive in today I gather:
http://insider.killington.com/2008/11/snow...-continues.html
http://insider.killington.com/2008/11/snow...-continues.html
spunkyskier01
14 Nov 2008
Peter
14 Nov 2008
Mont Saint Sauveur's new quad:
Attached File(s)
-
wergwerg.jpg (39.3K)
Number of downloads: 26 -
werfwerfwerf.jpg (30.1K)
Number of downloads: 21 -
werfwerf.jpg (30.17K)
Number of downloads: 18 -
qwefqwef.jpg (34.55K)
Number of downloads: 37 -
qwedqwed.jpg (39.49K)
Number of downloads: 38 -
1__2_.jpg (33.38K)
Number of downloads: 36
RibStaThiok
17 Nov 2008
Snowbasin's new Little Cat Express as of 11/15/08
Bottom Terminal


Line Splice in progress, note mechanic on tower and the bottom terminal of Becker in the background

The lift line (7 towers)

The old Little Cat Terminal area. They really did a good job of fixing up the mountain when they tore her down.

The old Little Cat lift line
This post has been edited by RibStaThio: 17 November 2008 - 09:03 PM
Bottom Terminal


Line Splice in progress, note mechanic on tower and the bottom terminal of Becker in the background

The lift line (7 towers)

The old Little Cat Terminal area. They really did a good job of fixing up the mountain when they tore her down.

The old Little Cat lift line

This post has been edited by RibStaThio: 17 November 2008 - 09:03 PM
yosemitemtb
17 Nov 2008
Here are some photos I took today at Badger Pass. First pic is our Yan terminal being modified to accept a Doppelmayr motor room.







RibStaThiok
17 Nov 2008
Not a new lift, but a beautiful one none the less. Needles Express 8 Person Gondi. Note the maintenance carrier on the line, used for maintenance and also to bring down trash from the Needles Lodge at the top.

Top Terminal (note the old lodge in the background, which is still used from time to time for special events)


Diesel back-up power.




Top Terminal (note the old lodge in the background, which is still used from time to time for special events)


Diesel back-up power.




RibStaThiok
17 Nov 2008
The Ride time of Little Cat Express is going to be about 2 and a half min, but with the slow speeds in the terminals, it will be extra helpful to the new skiers, before they graduate to the non-High Speed lifts at the Basin. (Becker, WildCat, Middlebowl, Porky)
mikest2
17 Nov 2008
Peter
17 Nov 2008
Looks great at Snowbasin and Badger Pass, thanks for the pictures guys.
Guest_mjturley34_* 17 Nov 2008
Allan
18 Nov 2008
yosemitemtb
18 Nov 2008
Agreed about the guy in the leg harness, the other guy is clipped in to the lift with another sling. I removed the pics to protect the guilty. I'll put some other pics up later.
This post has been edited by yosemitemtb: 18 November 2008 - 06:31 AM

This post has been edited by yosemitemtb: 18 November 2008 - 06:31 AM