New Lift Construction Photos 2008
Peter
07 Jun 2008
Tower 1 is going up on Blackcomb. The cable for Emerald Express is on the ground, presumably to accomodate P2P constructon. Also, the crossarm and lifting frame of a tower have been removed.
This post has been edited by Skier: 07 June 2008 - 05:42 PM
Attached File(s)
-
Peak_to_Peak_Gondola_Construction_2008_06_07_164500.jpg (651.33K)
Number of downloads: 113
This post has been edited by Skier: 07 June 2008 - 05:42 PM
Adrenaline
09 Jun 2008
floridaskier, on Jun 1 2008, 08:20 AM, said:
Doesn't look like anything's happened yet for Ski Team at PCMR. The snow is gone from the base area, but the old lift is still there and all the summer stuff is up at the base area. Wonder where the bottom terminal is going, there's not much extra space down there
http://www.parkcitymountain.com/winter/con...cams/index.html
http://www.parkcitymountain.com/winter/con...cams/index.html
Base is next to the base building for the alpine coaster. If you thought PC was ridiculous for traffic congestion, this will make that area just that much tighter. But another lift out of the base area is much needed.
Peter
11 Jun 2008
The old chair 7 and the new Chondola lift line at Sunday River:
Attached File(s)
-
gallery_1_67_106174.jpg (193.37K)
Number of downloads: 71
Peter
12 Jun 2008
Here is the new Mountaineer Skyride at the Cheyenne Mountain Zoo in Colorado Springs. It is a Doppelmayr quad that is 1100 feet long and it just opened.
Attached File(s)
-
2498293420054971943qxWGXl_fs.jpg (797.83K)
Number of downloads: 95
floridaskier
12 Jun 2008
poloxskier
12 Jun 2008
Snoqualmie guy, on Jun 12 2008, 02:32 PM, said:
Is it a flat lift or does it have any vertical rise?
Its been a while since I have been to the Zoo but from previous visits I would estimate 150-200 feet max.
I should go next time I'm visiting family in the springs as they have a membership to the zoo.
This post has been edited by poloxskier: 12 June 2008 - 06:14 PM
lastchair_44
14 Jun 2008
Go to www.tramformation.com to see a picture of one of our new tram cars. There is also a cool trailer for the video that will come out next year documenting the construction.
Peter
17 Jun 2008
I just read that Bear Creek, PA is getting a new fixed grip quad this summer. I went to there website and looked at their camera, and the lift is just about to be spliced!
This post has been edited by Skier: 17 June 2008 - 09:27 AM
Attached File(s)
This post has been edited by Skier: 17 June 2008 - 09:27 AM
Brian
17 Jun 2008
that's funny that bear creek is getting a quad. i learned to ski there, it wasn't too far from where i grew up.
Peter
17 Jun 2008
This is actually Bear Creek's 2nd quad. I assume when you learned there it was Doe Mountain.
skierdude9450
17 Jun 2008
More Keystone Construction Pics!!
The tower heads and assemblies have arrived!! It looks like there will be 32 towers with 2 compression towers (probably bottom and mid stations) and a good number of combination towers. Also there are quite a few parts in the gated lot for the bottom station.
Tower pics:
My first thought of the assemblies was just their sheer size. I always thought that sheaves were just little wheels and that catwalks were impossible to walk on unless you're a gymnast. Man was I wrong!
A 10-sheave support assembly:

You think cable catchers are small...

A 4S/4C combination assembly:

Tower head for #14 which will be a 10-support assembly:

An 8S/8C combination assembly - BIG:

A 16-sheave compression assembly. I measured it out to be almost 30 feet long!!

Tower head for #32, the last tower. It will be a 10-support assembly:

Various mounted tower heads:
The tower heads and assemblies have arrived!! It looks like there will be 32 towers with 2 compression towers (probably bottom and mid stations) and a good number of combination towers. Also there are quite a few parts in the gated lot for the bottom station.
Tower pics:
My first thought of the assemblies was just their sheer size. I always thought that sheaves were just little wheels and that catwalks were impossible to walk on unless you're a gymnast. Man was I wrong!
A 10-sheave support assembly:

You think cable catchers are small...

A 4S/4C combination assembly:

Tower head for #14 which will be a 10-support assembly:

An 8S/8C combination assembly - BIG:

A 16-sheave compression assembly. I measured it out to be almost 30 feet long!!

Tower head for #32, the last tower. It will be a 10-support assembly:

Various mounted tower heads:

skierdude9450
17 Jun 2008
A mounted combination assembly:

A cable position sensor:

There's a piece of wood inside this sheave. Why?

Complete tower 9 and 10. Like I said before, they're gonna be big. I measured them out at over 100 feet each!

What are these things that look like a satellite solar panel for?

The bottom station:
Various bottom station parts:

You can see the bullwheel in its quarters before they bolt it on to the center.

The center of the bullwheel:
This post has been edited by skierdude9450: 17 June 2008 - 02:01 PM

A cable position sensor:

There's a piece of wood inside this sheave. Why?

Complete tower 9 and 10. Like I said before, they're gonna be big. I measured them out at over 100 feet each!

What are these things that look like a satellite solar panel for?

The bottom station:
Various bottom station parts:

You can see the bullwheel in its quarters before they bolt it on to the center.

The center of the bullwheel:

This post has been edited by skierdude9450: 17 June 2008 - 02:01 PM
skierdude9450
17 Jun 2008
The hydraulic tensioning arms:

The acceleration (or deceleration) zone:

That's all for now.
P.S. why can you only post 8 pictures at a time??
This post has been edited by skierdude9450: 17 June 2008 - 02:00 PM

The acceleration (or deceleration) zone:

That's all for now.

P.S. why can you only post 8 pictures at a time??
This post has been edited by skierdude9450: 17 June 2008 - 02:00 PM
vons
17 Jun 2008
those are work platforms so the crew can catch and bolt the tower sections together they are removed after installation
SuperRat
17 Jun 2008
skiersage
17 Jun 2008
Quote
A few weeks ago the chairs from lift 7 were loaded onto a flatbed on their way to Boyne Highlands in Michigan.
That is kind of funny. Before I read this I was thinking to myself "I bet they send that lift to Boyne Highlands". Boyne H has not had a new lift in a few years and with Nubs getting a new lift this year, it is obviously time for an addition.
nathanvg
17 Jun 2008
skiersage, on Jun 17 2008, 07:26 PM, said:
That is kind of funny. Before I read this I was thinking to myself "I bet they send that lift to Boyne Highlands". Boyne H has not had a new lift in a few years and with Nubs getting a new lift this year, it is obviously time for an addition.
What in the world is Boyne H going to do with this lift? I don't know where they'd expand to and I don't know what lift they might replace or upgrade.
skiersage
18 Jun 2008
nathanvg, on Jun 18 2008, 12:34 AM, said:
What in the world is Boyne H going to do with this lift? I don't know where they'd expand to and I don't know what lift they might replace or upgrade.
I am 90% sure that they will use this lift to expand the north face area. I know that they have wanted to put another lift back there to the right of the current quad for a while.
liftmech
18 Jun 2008
Quote
A cable position sensor:
Not quite. If you notice the black plastic block there, you'll see that it has a hole in the centre where the sensor will go once the lift is (mostly) finished. That way they don't get damaged in transit, either on the road or in the air.
Quote
There's a piece of wood inside this sheave. Why?
Probably to keep the sheave from rotating, for whatever reason.
Nice photos.