

Possible Lifts for Summer 2008
#301
Posted 20 April 2008 - 05:44 PM
Liftblog.com
#302
Posted 26 April 2008 - 10:54 PM
The new chairlift will replace the Little Cat lift which services beginning terrain. The bottom terminal will be located above Earl’s Lodge and the upper terminal will end at the upper parking lot. The new lift will be 1,578 feet in length with a vertical rise of 173.5 feet. A 1,000 foot per minute line speed will yield a carrying capacity of 2,600 people per hour.
The new lift will better accommodate the beginning skier by reducing the intimidation from downhill skier traffic and easing loading and unloading due to the detachable lift's design.
Construction is scheduled to be completed in October in time for the 2008-09 ski season.
This post has been edited by Skier: 26 April 2008 - 10:54 PM
Liftblog.com
#303
Posted 27 April 2008 - 06:55 AM
http://www.skilifts.org/images/resort_imag...t/littlecat.htm
#305
Posted 27 April 2008 - 09:36 AM
skierdude9450, on Apr 27 2008, 09:34 AM, said:
skierdude,
I have to disagree with you... Can You picture Gemini at Winter Park being a FG lift?
Before saying that it's a waste of Techology think about why it will be 100% better!
#307 Guest_mjturley34_*
Posted 27 April 2008 - 04:51 PM
This post has been edited by mjturley34: 27 April 2008 - 04:56 PM
#308
Posted 27 April 2008 - 04:51 PM
skierdude9450, on Apr 27 2008, 04:13 PM, said:
If you have to run an FG at a slow .5 m/s in order for beginners to load, then the entire line has to ride at that speed. If it is a detachable lift, it can be slowed down in the terminal and the line will still go fast. I can only see the problem with unloading perhaps.
#309
Posted 28 April 2008 - 07:00 PM
Gore Mountain Ski Area
North Creek, New York
Burnt Ridge 700 HP Omega
Detachable Chair
Revelstoke Mountain Resort
Revelstoke, British Columbia
Lower Gondola 600 HP Omega
8 Place Gondola
Snowmass Ski Area
Aspen, Colorado
Sheer Bliss 600 HP Omega
Detachable Chair
Killington Resort
Killington, VT
Skye Peak 600 HP Omega
Detachable Chair
Winter Park Resort
Winter Park, Colorado
Base Transport 200 HP Omega
8 Place Gondola
This post has been edited by Skier: 28 April 2008 - 07:00 PM
Liftblog.com
#311
Posted 29 April 2008 - 05:26 AM
Also, Leitner-Poma installed a detachable quad at Cardrona in New Zealand this past winter.
"Today's problems cannot be solved by the level of thinking that created them." -Albert Einstein
#312
Posted 29 April 2008 - 07:51 AM
boardski, on Apr 28 2008, 11:17 PM, said:
I haven't heard anything recently, most of the lift discussions here lately have been about the 2nd gondola. going from a pulse design to a full detach has created issues with terminal locations, etc. I did see thunderhead running on 4/24 - probably inspection of some sort.
#313
Posted 29 April 2008 - 09:26 PM
Boreal, CA DoppelmayrCTEC Quad Castle Peak
Heavenly, CA DoppelmayrCTEC High Speed Quad Galaxy Express
Jackson Hole, WY DoppelmayrCTEC 100 Passenger Tram Tram
Keystone, CO DoppelmayrCTEC Gondola 8 River Run Gondola
Kirkwood, CA DoppelmayrCTEC Platter Covered Wagon
Kirkwood, CA DoppelmayrCTEC Platter Lookout Vista
Mont Tremblant, PQ DoppelmayrCTEC Gondola 8 Connection
Mt. Baker, WA DoppelmayrCTEC Quad Chair 1
Park City, UT DoppelmayrCTEC High Speed Quad Crescent Express
Saddleback, ME DoppelmayrCTEC Quad Kennebago
Solitude, UT DoppelmayrCTEC High Speed Quad Apex Express
Solitude, UT DoppelmayrCTEC High Speed Quad Moonbeam Express
Sun Valley, ID DoppelmayrCTEC High Speed Quad Elkhorn Express
Sun Valley, ID DoppelmayrCTEC High Speed Quad Half Dollar Express
Sunday River, ME DoppelmayrCTEC Chondola 4/6 Lift 7
Whistler Blackcomb, BC DoppelmayrCTEC Tri Cable Gondola Peak to Peak
Whistler Blackcomb, BC DoppelmayrCTEC Cabriolet Timing Flats
Whistler Blackcomb, BC DoppelmayrCTEC Gondola 8 Kadenwood
Whiteface, NY DoppelmayrCTEC Triple Lookout Mountain
Gore Mountain, NY Leitner-Poma High Speed Quad Burnt Ridge Express
Killington, VT Leitner-Poma High Speed Quad Skye Peak Express
Revelstoke, BC Leitner-Poma Gondola 8 Lower Gondola
Snowmass, CO Leitner-Poma High Speed Quad Sheer Bliss
Winter Park, CO Leitner-Poma Cabriolet Village
Bridger Bowl, MT Used Double Slushman's
Poley Mountain, NB Used Triple
Nub's Nob, MI Used Superior Triple Pintail Peak
Liftblog.com
#315
Posted 29 April 2008 - 09:56 PM
Liftblog.com
#316
Posted 30 April 2008 - 04:15 AM
#317
Posted 30 April 2008 - 07:09 AM
http://www.adn.com/play/recreation/feature...ory/378433.html
""We will be replacing Chair 3 with a quad, adding a midway station to Chair 7, a carpet loader to Chair 7 and increasing our hiking and biking terrain," Lott wrote. "
"So they contacted the resort, which said that it decided not to offer May skiing this year because it did not make financial sense. Also, the extra month would provide time for the renovation project."
#318
Posted 30 April 2008 - 03:46 PM
Thanks to Coe @ Snowbasin for his response!
********************************************************************************
******************************************
Your E-mail was forwarded to me a while ago and I wanted to wait until I knew for sure. I would have hated to continue with the rumors about a new Littlecat lift. Fact is we are going to replace Littlecat lift and move it to the east near the original location of a T-bar I am told. Lift stats: Doppelmayr/CTEC detachable Quad out of Canada, 1564 feet in length, vertical rise 173 feet, 1000 feet per minute, 2600 pph, 43 chairs with a ride time of 2.3 minutes. I would think that if you are coming out this way this summer you will see some real progress on the construction, provided the snow finally melts.
Thank you for your interest in Snowbasin. I will get with the GM sometime and inquire about joining skilifts.org, we all visit the site from time to time. Next rumor... detachable Quad from just below Strawberry Gondola up to Dan's Saddle.
This post has been edited by RibStaThio: 30 April 2008 - 03:48 PM
#319
Posted 30 April 2008 - 06:00 PM
#320
Posted 01 May 2008 - 12:27 PM
Telluride Announces the New Revelation Lift and ANOTHER New Terrain Expansion
April 30, 2008
Hi Folks,
It is our pleasure to announce that Telluride Ski and Golf is installing a new fixed-grip quad chairlift and again expanding advanced terrain. The new lift - called "Revelation" - will expand into the long-awaited and anticipated "Revelation Bowl" terrain and add vertical rise to the entire ski resort.
Environmentally responsible helicopter construction techniques will be used on this project. Construction is scheduled to be completed by November 15, 2008.
Check out this link for photos and blog comments:
http://blog.tellurideskiresort.com/blogs/d...n.aspx#comments

Number of downloads: 39
6 User(s) are reading this topic
0 members, 6 guests, 0 anonymous users