jaytrem's Photo jaytrem 27 Feb 2008

Here's an article on the Sunday River Chondola from maybe a month ago. "If all approvals are received, it could be installed next summer"

http://bethelcitizen...hp?storyid=4041
Reply

lastchair_44's Photo lastchair_44 27 Feb 2008

View PostOutback, on Feb 27 2008, 04:13 PM, said:

Doubtful information......still need civil engineers with state specific stamps to design foundations.

Good call.
Reply

Guest_mjturley34_* 27 Feb 2008

"still need civil engineers with state specific stamps to design foundations."

or

still need ONE civil engineer with state specific stamps ? Last I heard there were only two guys with stamps @ CTEC and one was Jan ?
Reply

Outback's Photo Outback 27 Feb 2008

View Postmjturley34, on Feb 27 2008, 09:06 PM, said:

"still need civil engineers with state specific stamps to design foundations."

or

still need ONE civil engineer with state specific stamps ? Last I heard there were only two guys with stamps @ CTEC and one was Jan ?


Last time I looked in the window at Salt Lake everybody was doing a worthy job in the engineering department.
Lot of engineering goes into a lift in the USA....civil, electrical, hydraulic, mechanical, general cartooning, etc.

Yes Jan had a lot of state engineering licenses on his office wall (more than I ever saw one man have) but there are others in the building with a few.
Most of the lift foundation engineering gets farmed out to free agent engineers with state specific licenses.

Are you a Dop employee in fear of loosing his job or a frenchman with Austrian envy? :w00t:
Reply

Guest_mjturley34_* 27 Feb 2008

I know that there are a LOT of good people there doing lots of good work and I would hate to see any of them loose their job.

I'm just a crippled guy who used to work for them and heard some news that didn't make much sense so I thought I'd bounce it off the wall here but perhaps I'm not worthy and don't know enuff to contribute sorry if I caused any delays in the compilation of the oh so important list of lifts that might happen next summer.

I've been to France & Austria but unfortunately I was born in Colorado :w00t:
Reply

Lift Dinosaur's Photo Lift Dinosaur 28 Feb 2008

View Postmjturley34, on Feb 27 2008, 09:02 AM, said:

that Doppelmayr was going to shut down some of their North American operations and rely more on parts from Europe.


The last I had heard was that Doppelmayr in Austria was "maxed" supplying the rest of the world and had no production capabilities for North America.
Towers and crossarms are "dumb steel". It doesn't matter where they are produced. The major structural components are another story with closer tolerances required. They will probably continue to be produced in St. Jerome, even with the devaluation of the American Peso.
$0.02 CAD

Dino
This post has been edited by Lift Dinosaur: 28 February 2008 - 05:14 AM
Reply

liftmech's Photo liftmech 28 Feb 2008

Quote

Crystal Mountain, WA DoppelmayrCTEC High Speed Quad Bullion Basin

Word from the shop- maybe, maybe not. I wouldn't say it's a sure thing until steel's in the parking lot. Old Millicent is in Spokane getting refurbished and even with the good year Crystal's been having, the quad isn't a done deal.
Reply

trooper1556's Photo trooper1556 28 Feb 2008

Steamboat plans:

Posted: 11-09-2007 12:50 PM
We are currently working through the approval process with the Forest Service and have engaged Leitner - Poma to do an engineering study on replacing the existing Thunderhead Express with a 6 place detachable chairlift with a capacity of 2,800 skiers per hour and relocating the equipment from Thunderhead Express to the Elkhead liftline. A detachable chairlift in this location will increase efficiencies as lower level skiers have difficulty in loading the current fixed quad. Although the theoretical capacity of the lifts is the same, we all know how many times this lift stops due to the passenger having difficulty loading.

We hope to accomplish this project next summer.

Doug Allen
VP Mountain Operations
Reply

Outback's Photo Outback 28 Feb 2008

View Postmjturley34, on Feb 27 2008, 11:32 PM, said:

I know that there are a LOT of good people there doing lots of good work and I would hate to see any of them loose their job.

I'm just a crippled guy who used to work for them and heard some news that didn't make much sense so I thought I'd bounce it off the wall here but perhaps I'm not worthy and don't know enuff to contribute sorry if I caused any delays in the compilation of the oh so important list of lifts that might happen next summer.

I've been to France & Austria but unfortunately I was born in Colorado :w00t:


No worries mjturley34, I am a grumpy sensative old man that relies on the industry for food and get worried when I hear rumors that the grocery store is closing!
Pretty funny comment about frenchies huh? :cool: Hey Dino!
Reply

silence's Photo silence 28 Feb 2008

Is Indy @ Breck still going to be extended this summer, with the return terminal being brought down to the new Peak 7 base?
Reply

coskibum's Photo coskibum 28 Feb 2008

huh, as civil engineer myself, we typically don't worry to much about out-sourcing to other countries because many of the projects are too site specific. While I don't design anything related to lifts, I would assume, like what was said above, this would be true here.
Reply

Lift Dinosaur's Photo Lift Dinosaur 29 Feb 2008

View Postsilence, on Feb 28 2008, 12:31 PM, said:

Is Indy @ Breck still going to be extended this summer, with the return terminal being brought down to the new Peak 7 base?


Yes.

Dino
Reply

Aussierob's Photo Aussierob 29 Feb 2008

Doppelmayr are discontinuing the AB controls that CTEC were supplying. The are going to Pilz after they use up their existing stock. I don't know if the Pilz panels will be built in SLC, or whether they will source them from Austria or St. Jerome.
Reply

skisox34's Photo skisox34 01 Mar 2008

Here is an e-mail I recieved from the public relations person at Okemo about new lifts next year:

Dear Ryan,

Thank you for your interest in Okemo Mountain Resort. Nothing is definite, but the plan for a new lift at Jackson Gore is to replace the two carpet lifts in the base area with an overhead chairlift. Then, at least one of the 400-foot carpet lifts will replace the Poma lift in the Galaxy Bowl (Children’s Snowstars area) in the clock tower base area. Our master plan for Jackson Gore also includes a gondola from the base to the summit (near the terminus of the North Star Express), but there is no set timeline on that right now.



Cheers,

Bonnie



__________________________________________



Bonnie MacPherson

Director of Public Relations

Okemo Mountain Resort
Reply

LuvPow's Photo LuvPow 02 Mar 2008

Revelstoke is moving ahead in 08 with LPoma for two chair lifts and the second stage of the Gondola.
Reply

Lavalamp's Photo Lavalamp 03 Mar 2008

Quote

Crystal Mountain, WA DoppelmayrCTEC High Speed Quad Bullion Basin


View Postliftmech, on Feb 28 2008, 06:11 AM, said:

Word from the shop- maybe, maybe not. I wouldn't say it's a sure thing until steel's in the parking lot. Old Millicent is in Spokane getting refurbished and even with the good year Crystal's been having, the quad isn't a done deal.


I've been hearing similar things, although its leaning more towards "Not going to happen this summer." Aparently they are going to worry about the Northway return trail instead.
This post has been edited by Lavalamp: 03 March 2008 - 01:53 PM
Reply

skiracer's Photo skiracer 05 Mar 2008

does anyone know yet if there are any highspeed eight pack chairs in the u.s. yet?
This post has been edited by skiracer: 05 March 2008 - 03:11 PM
Reply

Peter's Photo Peter 05 Mar 2008

No, there are none.
Reply

skiracer's Photo skiracer 05 Mar 2008

View PostSkier, on Mar 5 2008, 06:19 PM, said:

No, there are none.

thats what i thought but i was not sure , so they are all still in europe unfortunately.
Reply

NoPainNoJane's Photo NoPainNoJane 06 Mar 2008

View Postskiracer, on Mar 5 2008, 04:36 PM, said:

thats what i thought but i was not sure , so they are all still in europe unfortunately.


not true, Perisher Blue in Australia has one installed w/ a loading carpet
Reply