New Lift Construction Photos 2007
#382
Posted 16 September 2007 - 08:58 PM
JustJeepIt, on Sep 16 2007, 09:54 PM, said:
It moved over just a bit to become the Gold Hills chair at Crystal in 1984.
Liftblog.com
#383
Posted 16 September 2007 - 09:01 PM
I am actually anxious to see what happens with the new lift that will be installed in its old spot. I want to see if the same problems plague it, like the old ones did to the triple.
#384
Posted 16 September 2007 - 09:04 PM
Liftblog.com
#385
Posted 16 September 2007 - 09:10 PM
Skier, on Sep 15 2007, 08:06 PM, said:
I found a good spot up by the old Gun Tower to watch the helicopter fly the towers from. That will be around September 30th. I am thinking they are going to have to lift the excavator out with the helicopter while it is there.
Are they working weekends to get this project done? The 30th would be a Sunday. Skier, can you get some exact dates?
#386
Posted 16 September 2007 - 09:15 PM
This post has been edited by Skier: 16 September 2007 - 09:16 PM
Liftblog.com
#389
Posted 17 September 2007 - 07:37 PM
Liftblog.com
#391
Posted 20 September 2007 - 04:42 AM
Skier, on Sep 16 2007, 04:13 PM, said:
How are they tripling the size of D-lot? If I recall correctly, the eastern edge of the lot sits on the bank of the creek, same as E and F-lots. I assume C-lot is staying as is?
#392
Posted 20 September 2007 - 05:09 AM
http://www.wcax.com/...y.asp?S=7101106
Your Northeastern US Representative
#393
Posted 20 September 2007 - 09:56 AM
sseguin613, on Jul 29 2007, 09:09 PM, said:
Thanks
Tremblant, for budget problems because of the sewage systems on Versant Soleil, has decided to drop this project for this summer and send it up to 2009 or 2010, but they are keeping the "sous-bois" project on the Edge. The lift will probably be a Dopplemayr built by them, or else a private contractor will stand it up
#394
Posted 20 September 2007 - 03:16 PM
liftmech, on Sep 20 2007, 05:42 AM, said:
You're right. They are actually halving both B and F lots. Then adding G, H, and I across the highway. The advantage is the new lots will have ski in ski out access to the new Bullion Basin base area with direct access to and from the Kelly's Gap Express and Bullion Bain lifts.
Liftblog.com
#395
Posted 21 September 2007 - 05:14 AM
#396
Posted 22 September 2007 - 05:59 PM
Seven Springs' Gunnar Lift is complete and load tested as of 9/17.
Liftblog.com
#400
Posted 23 September 2007 - 01:30 PM
This post has been edited by Skier: 23 September 2007 - 04:27 PM
Liftblog.com