New Lift Construction Photos 2007
Lift Kid
30 Aug 2007
liftmech
31 Aug 2007
Not yet, still warm enough to break a sweat. We sized all our rigging for the new bullwheel so that we wouldn't have to change halfway through. It turned out to be about a ton heavier than the old, so purchase of new chain falls was necessary. Removal went very smooth, hopefully installation goes as well. And, of course, we've gotten the brand-new paint all scratched and dirty already
Lift Kid
02 Sep 2007
liftmech, on Aug 31 2007, 06:39 AM, said:
Not yet, still warm enough to break a sweat. We sized all our rigging for the new bullwheel so that we wouldn't have to change halfway through. It turned out to be about a ton heavier than the old, so purchase of new chain falls was necessary. Removal went very smooth, hopefully installation goes as well. And, of course, we've gotten the brand-new paint all scratched and dirty already 
If you take pictures of the install, please post them! I will keep my eyes open next winter for that new bullwheel.....
Peter
02 Sep 2007
I have tons of new pictures from Crystal. There is more progress...
This post has been edited by Skier: 02 September 2007 - 04:53 PM
Attached File(s)
-
tower_10.jpg (392.25K)
Number of downloads: 25 -
top_2.jpg (266.49K)
Number of downloads: 13 -
top.jpg (405.25K)
Number of downloads: 26 -
chairs.jpg (379.38K)
Number of downloads: 35 -
cable.jpg (254.8K)
Number of downloads: 19 -
bottom.jpg (253.5K)
Number of downloads: 47 -
tower_1_looking_down.jpg (415.18K)
Number of downloads: 15 -
new_run.jpg (276.61K)
Number of downloads: 20
This post has been edited by Skier: 02 September 2007 - 04:53 PM
Peter
02 Sep 2007
All the foundations are done except the top 3, bottom terminal is taking shape, still no towers or sheaves in the parking lot. Towers will be flown around September 15th.
Attached File(s)
-
tower_looking_up.jpg (363.58K)
Number of downloads: 10 -
tower_13_looking_up.jpg (371.42K)
Number of downloads: 7 -
tower_14.jpg (336.4K)
Number of downloads: 9 -
tower_16.jpg (374.27K)
Number of downloads: 11
Skiing#1
02 Sep 2007
Thank you for sharing these pictures of new lifts. I am fastantic to see most pictures.
I will go up to Brighton this thursday and I will take pictures of the new lift...Milly Express (I will hike up to the top, too and take the pictures) and I will post them.
I will go up to Brighton this thursday and I will take pictures of the new lift...Milly Express (I will hike up to the top, too and take the pictures) and I will post them.
Peter
02 Sep 2007
I thought I'd give a roundup of Crystal Projects this summer...
Northway Lift...In Progress
Northway Runs...Mostly done
Summit House Remodel...Mostly Done
Lucky Shot Regrade...Not Started
Quicksilver New Cable...In Progress
Painting the Main Lodge...In Progress
Painting Quicksilver...Done
Painting Gold Hills...Done
Painting Discovery...Done
Northway Lift...In Progress
Northway Runs...Mostly done
Summit House Remodel...Mostly Done
Lucky Shot Regrade...Not Started
Quicksilver New Cable...In Progress
Painting the Main Lodge...In Progress
Painting Quicksilver...Done
Painting Gold Hills...Done
Painting Discovery...Done
Allan
03 Sep 2007
Here, have some pictures of our new lift.
Attached File(s)
-
IMG_0021.JPG (58.22K)
Number of downloads: 37 -
IMG_0022.JPG (52.31K)
Number of downloads: 29 -
IMG_0044.JPG (34.5K)
Number of downloads: 25 -
IMG_0039.JPG (39.67K)
Number of downloads: 11 -
IMG_0035.JPG (66.96K)
Number of downloads: 28 -
IMG_0034.JPG (52.08K)
Number of downloads: 27 -
IMG_0023.JPG (63.42K)
Number of downloads: 16 -
IMG_0024.JPG (59.07K)
Number of downloads: 15 -
IMG_0032.JPG (76.98K)
Number of downloads: 15 -
IMG_0031.JPG (36.44K)
Number of downloads: 25 -
IMG_0036.JPG (56.84K)
Number of downloads: 49
Peter
03 Sep 2007
This is a really cool video from Doppelmayr posted 2 days ago. This time, they put a helmet cam on the crossarm being flown for the Lady Morgan Express.
http://www.youtube.c...h?v=Mc2fPEzIBvo
And some footage of Shirley Lake Express being built at Squaw:
http://www.youtube.c...h?v=E15Rz8tT5dE
This post has been edited by Skier: 03 September 2007 - 11:36 PM
http://www.youtube.c...h?v=Mc2fPEzIBvo
And some footage of Shirley Lake Express being built at Squaw:
http://www.youtube.c...h?v=E15Rz8tT5dE
This post has been edited by Skier: 03 September 2007 - 11:36 PM
Allan
04 Sep 2007
liftmech
04 Sep 2007
Allan, looks like you've got the Doppelmayr version of the infamous Pomapass... not as good as a catwalk but better than nothing at all.
Skier- where is Lucky Shot being regraded? Are they taking out all the rollers over which one can catch massive air?
...and our new bullwheel moves a final twenty feet...
Skier- where is Lucky Shot being regraded? Are they taking out all the rollers over which one can catch massive air?
...and our new bullwheel moves a final twenty feet...
Attached File(s)
-
setting_the_Dobikon.jpg (136.86K)
Number of downloads: 29 -
what_do_you_mean__we_have_to_tip_this_thing_up.jpg (188.25K)
Number of downloads: 32 -
more_high_angle_drive_sheave.jpg (191.71K)
Number of downloads: 31 -
New_Flyer_Bullwheel___07_061.jpg (816.17K)
Number of downloads: 27 -
come_on_up.jpg (159.05K)
Number of downloads: 26 -
high_angle_drive_sheave.jpg (142.68K)
Number of downloads: 25 -
big_hole_in_the_floor.jpg (182.71K)
Number of downloads: 31
Peter
04 Sep 2007
Allan, on Sep 4 2007, 05:31 PM, said:
No catwalks, just those funny rails. It's shinier than anything else we have!! And it's not the YAN so we don't have an extra 100 carriers to gusset!
I think so. So far there has been no progress. I think they are going to use all the rick and dirt that they took off the top of Northway Peak.
Lift Kid
06 Sep 2007
liftmech, on Sep 4 2007, 08:36 PM, said:
Allan, looks like you've got the Doppelmayr version of the infamous Pomapass... not as good as a catwalk but better than nothing at all.
Skier- where is Lucky Shot being regraded? Are they taking out all the rollers over which one can catch massive air?
...and our new bullwheel moves a final twenty feet...
Skier- where is Lucky Shot being regraded? Are they taking out all the rollers over which one can catch massive air?
...and our new bullwheel moves a final twenty feet...
Looks like you have the whole crew working on that new bullwheel! Have you guys taken it for a spin yet?
Peter
09 Sep 2007
The person who works for Doppelmayr really like making these point of view videos. It looks like there are a bunch now.
http://www.youtube.c...ser=pdogandyboy
http://www.youtube.c...ser=pdogandyboy
Lift Dinosaur
09 Sep 2007
Great to see that they have the time to share their work with the industry, but like the Vail #10 "destruction"(FYI, there was never any input from the owner to do a test like Winter Park on this lift), they have too much time on their hands.(OK, I'm a Dinosaur and never had the technology (to photograph) while I was riding in the concrete bucket from tower to tower. When they're freezing their
fingers off in November, they may reconsider their efforts while wearing T-Shirts in July.
Lift Maintenance is different than Lift Destruction/ Lift Construction.
As liftmech says (where did you hear this?) "Maintenance is a Marathorn, Not a Sprint".
"Construction is a Sprint, Not a Marathon"
2 Cuervos...
Lift Maintenance is different than Lift Destruction/ Lift Construction.
As liftmech says (where did you hear this?) "Maintenance is a Marathorn, Not a Sprint".
"Construction is a Sprint, Not a Marathon"
2 Cuervos...
Skiing#1
09 Sep 2007
Skier, on Sep 9 2007, 05:56 PM, said:
The person who works for Doppelmayr really like making these point of view videos. It looks like there are a bunch now.
http://www.youtube.c...ser=pdogandyboy
http://www.youtube.c...ser=pdogandyboy
I watched these videos...WOW...I feel like I am inside videos to do installation the tower, head, wheels, etc. It is fun and learned a lot.
Thank you, Skier.

