New Lift Construction Photos 2007

EagleAce's Photo EagleAce 22 Jun 2007

View Postskiersage, on Jun 16 2007, 09:01 PM, said:

A YAN/Hall combination? That would be interesting to see. I wonder how they will use the Hall parts. Probably the only thing they could use is the tower caps and the sheaves.


:rolleyes: Another Frankenlift! Our mechanics would love that one!! I catch hell 'cause I like our Yans better than the Halls :smile:
Reply

Snoqualmie guy's Photo Snoqualmie guy 22 Jun 2007

Like many people I have mixed feelings about this lift. One, it will be cool to have a new lift one lots of new left served runs. But to lose the North Back country will be sad, now it well be not packed but more people about. :smile: :sad:
Reply

Peter's Photo Peter 22 Jun 2007

I am really not sure where Crystal gets the "New Lift Served Runs" idea. Most of the terrain goes onto I-5 and back to the base. It may be long, but it is lift served. I am still not quite sure how much of Brand X I will be able to get back to the lift from.
Reply

liftmech's Photo liftmech 27 Jun 2007

As I understand it, there will be several 'new' runs- mainly extensions out of Morning Glory, Paradise, Spook Hill, and such. There will also be a new egress out of the bottom of Brand X allowing for return trips; I don't think there will be much loss of vertical over the original exit to Lower Northway.
Reply

Peter's Photo Peter 28 Jun 2007

Shirley Lake coming down...

Attached File(s)

Reply

Lift Kid's Photo Lift Kid 28 Jun 2007

View PostSkier, on Jun 28 2007, 12:35 PM, said:

Shirley Lake coming down...

She'll be missed..... :sad:
Reply

JustJeepIt's Photo JustJeepIt 28 Jun 2007

Wasn't she a HSQ? What happend? Being replaced? Closed?
Reply

Peter's Photo Peter 28 Jun 2007

See new lift 2007 thread. (she is being replaced with a 6pack)
Reply

LuvPow's Photo LuvPow 29 Jun 2007

The mid station and top of the gondola at Revelstoke, 26 towers... the lower part of the gondola will be completed next year. A lot of rock, and some steep cliff bands will make the installation a bit challenging.
Reply

LuvPow's Photo LuvPow 29 Jun 2007

chair "12" at revelstoke will be 23 towers...
Reply

Peter's Photo Peter 29 Jun 2007

Thank you for posting these photos, it looks beautiful up there. Chair 12 will be a detachable quad, right?
Reply

P01itiC4lR3B31's Photo P01itiC4lR3B31 29 Jun 2007

View PostSkier, on Jun 29 2007, 01:13 PM, said:

Thank you for posting these photos, it looks beautiful up there. Chair 12 will be a detachable quad, right?

Chair 12 is a detachable quad. Leitner-Poma Omega that is. Thanks for the pics
This post has been edited by P01itiC4lR3B31: 29 June 2007 - 02:00 PM
Reply

Peter's Photo Peter 30 Jun 2007

I went to Crystal today and took pictures of the Northway project. I will post them in the next little while....
Reply

Peter's Photo Peter 30 Jun 2007

I hiked from the top of the new lift down. Right now they are in the process of heli-logging. All the trees are cut, but very few have been removed. The liftline seems very wide for a double chair...

Top terminal looking down
Attached File  northway_6_30_07_021_small.jpg (1.06MB)
Number of downloads: 47
Midline looking down
Attached File  northway_6_30_07_034_small.jpg (930.62K)
Number of downloads: 37
Reply

Peter's Photo Peter 30 Jun 2007

looking up
Attached File  northway_6_30_07_035_small.jpg (729.72K)
Number of downloads: 24

looking up
Attached File  northway_6_30_07_037_small.jpg (597.52K)
Number of downloads: 13
Reply

Peter's Photo Peter 30 Jun 2007

tower marker
Attached File  northway_6_30_07_036_small.jpg (1.22MB)
Number of downloads: 18

looking down
Attached File  northway_6_30_07_040_small.jpg (467.2K)
Number of downloads: 24

bottom of Northway
Attached File  northway_6_30_07_045_small.jpg (894.8K)
Number of downloads: 33
Reply

Peter's Photo Peter 30 Jun 2007

The only part that has arrived, there are two of these. Does 4S Products make the haul rope or is this something else?
Attached File  northway_6_30_07_051_small.jpg (424.08K)
Number of downloads: 48
Attached File  northway_6_30_07_050_small.jpg (600.12K)
Number of downloads: 23
Reply

Skiing#1's Photo Skiing#1 30 Jun 2007

Skier, will it be former Millicent lift?

Wow there are snow in the pictures. Here in the Wasatch Mountain...all snow is gone alreardy. The temperature in the mountain is average 85 and the valley, the temperature stays 100. No rain since last April.
Reply

Peter's Photo Peter 30 Jun 2007

No, this will be a new Doppelmayr CTEC double. Their plan is to finish logging in the next few weeks, then work on foundations as soon as all the snow is gone. It will be late August/Early September before any towers are flown. The top two towers seem to be perched on the cliffs, it is very steep up there. There are going to be around 22 or so towers in all. Walking this thing made it seem very long and very steep. As of right now, there is no road to the top drive or bottom terminals.
Reply

mikest2's Photo mikest2 30 Jun 2007

View PostSkier, on Jun 30 2007, 05:43 PM, said:

The only part that has arrived, there are two of these. Does 4S Products make the haul rope or is this something else?

That would be the comm line, it is a 25 pair 19 guage, figure 8 cable. The integral guy strand is 3/8 diameter. 3/8 is good ! It'll hold up to about a foot of cocktail ice before snapping.
Reply