607 replies to this topic

#121 EagleAce

    Established User

  • Industry I
  • 716 Posts:
  • Interests:driving large trucks and learning all that I can about lifts

Posted 22 June 2007 - 03:18 PM

View Postskiersage, on Jun 16 2007, 09:01 PM, said:

A YAN/Hall combination? That would be interesting to see. I wonder how they will use the Hall parts. Probably the only thing they could use is the tower caps and the sheaves.


:rolleyes: Another Frankenlift! Our mechanics would love that one!! I catch hell 'cause I like our Yans better than the Halls :smile:

#122 Snoqualmie guy

    Snoqualmie guy

  • Member
  • 1,065 Posts:
  • Interests:Snoqualmie Pass ski areas

Posted 22 June 2007 - 05:44 PM

Like many people I have mixed feelings about this lift. One, it will be cool to have a new lift one lots of new left served runs. But to lose the North Back country will be sad, now it well be not packed but more people about. :smile: :sad:
- Jeff


Why couldn't they of come up with "Global Cooling"?

#123 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 22 June 2007 - 06:14 PM

I am really not sure where Crystal gets the "New Lift Served Runs" idea. Most of the terrain goes onto I-5 and back to the base. It may be long, but it is lift served. I am still not quite sure how much of Brand X I will be able to get back to the lift from.
- Peter<br />
Liftblog.com

#124 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 27 June 2007 - 10:29 AM

As I understand it, there will be several 'new' runs- mainly extensions out of Morning Glory, Paradise, Spook Hill, and such. There will also be a new egress out of the bottom of Brand X allowing for return trips; I don't think there will be much loss of vertical over the original exit to Lower Northway.
Member, Department of Ancient Technology, Colorado chapter.

#125 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 28 June 2007 - 09:35 AM

Shirley Lake coming down...

Attached File(s)


- Peter<br />
Liftblog.com

#126 Lift Kid

    Minnesota Skier!

  • Industry I
  • 1,333 Posts:

Posted 28 June 2007 - 12:31 PM

View PostSkier, on Jun 28 2007, 12:35 PM, said:

Shirley Lake coming down...

She'll be missed..... :sad:

#127 JustJeepIt

    Established User

  • Member
  • 132 Posts:

Posted 28 June 2007 - 08:59 PM

Wasn't she a HSQ? What happend? Being replaced? Closed?

#128 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 28 June 2007 - 10:54 PM

See new lift 2007 thread. (she is being replaced with a 6pack)
- Peter<br />
Liftblog.com

#129 LuvPow

    Established User

  • Industry II
  • 220 Posts:

Posted 29 June 2007 - 11:51 AM

The mid station and top of the gondola at Revelstoke, 26 towers... the lower part of the gondola will be completed next year. A lot of rock, and some steep cliff bands will make the installation a bit challenging.
Nothing is so perfectly amusing as a total change of ideas.
Laurence Sterne

#130 LuvPow

    Established User

  • Industry II
  • 220 Posts:

Posted 29 June 2007 - 11:56 AM

chair "12" at revelstoke will be 23 towers...
Nothing is so perfectly amusing as a total change of ideas.
Laurence Sterne

#131 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 29 June 2007 - 12:13 PM

Thank you for posting these photos, it looks beautiful up there. Chair 12 will be a detachable quad, right?
- Peter<br />
Liftblog.com

#132 P01itiC4lR3B31

    Established User

  • Member
  • 56 Posts:

Posted 29 June 2007 - 01:59 PM

View PostSkier, on Jun 29 2007, 01:13 PM, said:

Thank you for posting these photos, it looks beautiful up there. Chair 12 will be a detachable quad, right?

Chair 12 is a detachable quad. Leitner-Poma Omega that is. Thanks for the pics

This post has been edited by P01itiC4lR3B31: 29 June 2007 - 02:00 PM


#133 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:16 PM

I went to Crystal today and took pictures of the Northway project. I will post them in the next little while....
- Peter<br />
Liftblog.com

#134 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:29 PM

I hiked from the top of the new lift down. Right now they are in the process of heli-logging. All the trees are cut, but very few have been removed. The liftline seems very wide for a double chair...

Top terminal looking down
Attached File  northway_6_30_07_021_small.jpg (1.06MB)
Number of downloads: 47
Midline looking down
Attached File  northway_6_30_07_034_small.jpg (930.62K)
Number of downloads: 37
- Peter<br />
Liftblog.com

#135 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:39 PM

looking up
Attached File  northway_6_30_07_035_small.jpg (729.72K)
Number of downloads: 24

looking up
Attached File  northway_6_30_07_037_small.jpg (597.52K)
Number of downloads: 13
- Peter<br />
Liftblog.com

#136 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:41 PM

tower marker
Attached File  northway_6_30_07_036_small.jpg (1.22MB)
Number of downloads: 18

looking down
Attached File  northway_6_30_07_040_small.jpg (467.2K)
Number of downloads: 24

bottom of Northway
Attached File  northway_6_30_07_045_small.jpg (894.8K)
Number of downloads: 33
- Peter<br />
Liftblog.com

#137 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:43 PM

The only part that has arrived, there are two of these. Does 4S Products make the haul rope or is this something else?
Attached File  northway_6_30_07_051_small.jpg (424.08K)
Number of downloads: 48
Attached File  northway_6_30_07_050_small.jpg (600.12K)
Number of downloads: 23
- Peter<br />
Liftblog.com

#138 Skiing#1

    Established User

  • Member
  • 745 Posts:

Posted 30 June 2007 - 04:45 PM

Skier, will it be former Millicent lift?

Wow there are snow in the pictures. Here in the Wasatch Mountain...all snow is gone alreardy. The temperature in the mountain is average 85 and the valley, the temperature stays 100. No rain since last April.

#139 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 30 June 2007 - 04:50 PM

No, this will be a new Doppelmayr CTEC double. Their plan is to finish logging in the next few weeks, then work on foundations as soon as all the snow is gone. It will be late August/Early September before any towers are flown. The top two towers seem to be perched on the cliffs, it is very steep up there. There are going to be around 22 or so towers in all. Walking this thing made it seem very long and very steep. As of right now, there is no road to the top drive or bottom terminals.
- Peter<br />
Liftblog.com

#140 mikest2

    Mountain Operations

  • Administrator I
  • 1,204 Posts:

Posted 30 June 2007 - 05:37 PM

View PostSkier, on Jun 30 2007, 05:43 PM, said:

The only part that has arrived, there are two of these. Does 4S Products make the haul rope or is this something else?

That would be the comm line, it is a 25 pair 19 guage, figure 8 cable. The integral guy strand is 3/8 diameter. 3/8 is good ! It'll hold up to about a foot of cocktail ice before snapping.
...Mike