←  Skilifts.org General Discussion

Skilifts.org / SORT Forum

»

Mid Loading Area?

skierdude9450's Photo skierdude9450 03 Apr 2007

Whistler's Village Gondola I think has two different ropes and drives. It seems like it would be very hard to keep the ropes going at exactly the same speed.
Reply

Lift Kid's Photo Lift Kid 04 Apr 2007

View Postskierdude9450, on Apr 3 2007, 09:43 PM, said:

Whistler's Village Gondola I think has two different ropes and drives. It seems like it would be very hard to keep the ropes going at exactly the same speed.

So does Telluride's Gondola. It is two gondolas that have a chain cadence system that takes the cabins back and forth between gondolas. It is really slow. Inside the top terminal, there are two "skeletons" of gondola terminals. There is a rail on both sides that has the chain attached to it.
Reply

bhb399mm's Photo bhb399mm 04 Apr 2007

View PostLift Kid, on Apr 4 2007, 05:46 AM, said:

So does Telluride's Gondola.

as does ours at Mammoth - we can run the lower and upper gondola's completely separate from eachother
Reply

Jonni's Photo Jonni 05 Apr 2007

The Skyeship Express also is a great example of this at Killington, VT. Here's Killington's Skilifts.org page: http://www.skilifts....killington.html
Reply

Peter's Photo Peter 05 Apr 2007

Excalibur at Blackcomb is a turn with 2 gondolas as one also.

Attached File(s)

Reply

poloxskier's Photo poloxskier 05 Apr 2007

View PostSkiing#1, on Apr 3 2007, 02:29 PM, said:

Poloxshier,

Really? I thought the angle station have two terminals and two ropes between bottom/middle and middle/top since see the picture that two terminals are together connection. Because I rode and I felt the chair was swinging and chair was moved slow after the first terminal get the chair off the rope and make chairs slow down and move them forward to other terminal (it looks like transfer) and it speed the chairs up and go up to the mountain.

Skier is correct.

As stated above, I have not ridden this lift so I was not certain about its set up, so I did not present the way I thought that that lift was set up as fact. The vast majority of high speed chairs with mid stations are single rope instalations, and as such the mid station is not concidered to be a terminal as lifts with only one rope only have two terminals, top and bottom. The definition of a terminal is a station where the haul rope turns more than 150 degrees.
This post has been edited by poloxskier: 05 April 2007 - 05:02 PM
Reply

Guest_skisox34_* 09 Apr 2007

Killington's has a seperately driven tire bank to connect the two sections. The connect section actually runs slightly faster than the load/unload speed. Speaking about seeing a detach terminal's inside, You all should see if you can get someone to take you in that terminal. It is pretty spectacular.
Reply

Skiing#1's Photo Skiing#1 17 Apr 2007

I found one video from the webiste. its ski dome and in Ski Dubai. The video showed mid-load area. I am amazing to see how it works.

http://www.youtube.c...h?v=RU1MGE3vr3k
This post has been edited by Skiing#1: 17 April 2007 - 07:38 AM
Reply

Ontariodude's Photo Ontariodude 05 May 2007

Le Massif, Quebec has a mid loading station on the Mailard Express. In images under Le Massif, I have a pic posted of the station. We used it frequently and was super nifty. :thumbsup:

Will T. (ontariodude)
Reply

ceo's Photo ceo 14 May 2007

View PostSkiing#1, on Apr 17 2007, 11:37 AM, said:

I don't think that's the video you meant to post. It's pretty funny though (but I bet the industry folks here will vehemently disagree).
Reply

liftmech's Photo liftmech 15 May 2007

It's all funny until someone loses an eye- or falls off the lift, or maims himself... Just as a disinterested observer, though, definitely funny. Glad we don't have any midstations, especially those that operate in the summer.
Reply

Skiing#1's Photo Skiing#1 09 May 2008

I found the video on the mid-station. I wonder how do one chair turn around and others stay staright up the mountain work?

http://youtube.com/watch?v=T4r3m-VLevI
Reply

Snoqualmie guy's Photo Snoqualmie guy 09 May 2008

View PostSkier, on Apr 5 2007, 05:09 PM, said:

Excalibur at Blackcomb is a turn with 2 gondolas as one also.

What is the point of having two gondolas there? Why not just have one that spanned the whole line?
Reply

Peter's Photo Peter 09 May 2008

Because they can run the two independently. For example, I believe they run the lower section from the Whistler Village to the midstation where their Tube Park is in the evenings. The cabins are just turned around there without going all the way up and down Blackcomb.
Reply

skierdude9450's Photo skierdude9450 10 May 2008

View PostSkiing#1, on May 9 2008, 10:31 PM, said:

I found the video on the mid-station. I wonder how do one chair turn around and others stay staright up the mountain work?

http://youtube.com/watch?v=T4r3m-VLevI

That's the six-pack Bollin-Fresse at Tignes in France. It's a double-loading 6-pack at the bottom, and half of the chairs (Bollin) only go up to the mid-station and then turn around with 90 degree unloading. The other half (Fresse) go to the top station and are on the full line. It's a pretty clever system, but it doesn't make much sense that only half of the chairs go to the top. Here's the discussion (in French) on r-m.net: http://www.remontees-mecaniques.net/forums...c=320&st=60 There's plenty of good pictures.
Reply

Skiing#1's Photo Skiing#1 02 Jun 2008

View PostSkiing#1, on Apr 17 2007, 09:37 AM, said:

I found one video from the webiste. its ski dome and in Ski Dubai. The video showed mid-load area. I am amazing to see how it works.

http://www.youtube.c...h?v=RU1MGE3vr3k



After I read what liftmech and ceo said about the video. OOPS!!! I laughed!!! Two men got off the lift at the mid-station and ran round back to the same seat except one man missed it. That is off topic or subject. LOL.

I looked and found right ones.

http://youtube.com/watch?v=SBQaJmcqadU

Also T-bar has turns, too. Very interesting.

http://youtube.com/watch?v=8ZHu0zeMx1M
Reply

SuperRat's Photo SuperRat 03 Jun 2008

View PostSkiBachelor, on Apr 3 2007, 08:25 PM, said:

Well, computer technology has increased dramatically within the last few years making it easier to do.


True. Jonni mentioned the Killington Skye Ship, a modern (1994) Poma detachable, but don't forget the original 1969 Killington Gondola. It was comprised of three lifts that could be run separately or linked together by angled mid-stations and run as one. It didn't have any terminal conveyors, the cabins were pushed through by lift attendants and launched manually.
Reply

Andoman's Photo Andoman 03 Jun 2008

View PostSkiing#1, on Jun 2 2008, 11:09 AM, said:

After I read what liftmech and ceo said about the video. OOPS!!! I laughed!!! Two men got off the lift at the mid-station and ran round back to the same seat except one man missed it. That is off topic or subject. LOL.

I looked and found right ones.

http://youtube.com/watch?v=SBQaJmcqadU

Also T-bar has turns, too. Very interesting.

http://youtube.com/watch?v=8ZHu0zeMx1M



WOW!!! how stink'in slow is that chair?? :cursing: It looked like the t-bar was lapping the chairlift. It looks about as bad as skiing in michigan (it's a lot like a roller coaster line) 30 seconds on the run, 15 minutes in the line, and 4 minutes on the lift.
Reply

hyak.net's Photo hyak.net 03 Jun 2008

Here is a photo of the old Dinosaur mid-station Murray-Latta lift from the 1960's. Check out the folks unloading left as riders are arriving to the right. I wonder how many collisions there were of people unloading into people arriving the other direction? They had a ramp down each side of the terminal area for unloading only both directions.

Posted Image
This post has been edited by hyak.net: 03 June 2008 - 06:51 PM
Reply

liftmech's Photo liftmech 04 Jun 2008

That was certainly a trip, especially at night :rolleyes: I don't think I ever unloaded as people were coming up from the other side, but one still had to avoid running into chairs. Near the end of the operation I believe they put up a dividing wall between the two sides.
Reply