

2004/2005 Installations.
Started by floridaskier, Jan 24 2004 06:18 AM
61 replies to this topic
#1
Posted 24 January 2004 - 06:18 AM
Ok, how many lifts do we know of being installed this year? Or that we think might be installed?
I'm pretty sure TR and/or lastchair44 said that the new Sultan Express at DV was going in this year, and when I ws there a few weeks ago, I heard that DV is building a housing development in that flat meadow by the Quincy lift (I'll find a pic later) in partnership with the mining company that owns the land in Empire Canyon, and in return, the mining company is going to let DV install a new lift in Empire Canyon.
In the 'Planned Lifts' section of the DV page on skilifts.org, it says Sultan Express, then it has an unnamed lift. I'm guessing that the Empire Canyon lift is the unnamed one
I'm pretty sure TR and/or lastchair44 said that the new Sultan Express at DV was going in this year, and when I ws there a few weeks ago, I heard that DV is building a housing development in that flat meadow by the Quincy lift (I'll find a pic later) in partnership with the mining company that owns the land in Empire Canyon, and in return, the mining company is going to let DV install a new lift in Empire Canyon.
In the 'Planned Lifts' section of the DV page on skilifts.org, it says Sultan Express, then it has an unnamed lift. I'm guessing that the Empire Canyon lift is the unnamed one
- Tyler
West Palm Beach, FL - elev. 9 feet
West Palm Beach, FL - elev. 9 feet
#4
Posted 24 January 2004 - 10:28 AM
Willamette Pass, OR: FG Gondola
Alpine Meadows, CA: HSQ <-- Not sure if it's going in this year.
Kirkwood, CA: HSQ
Mt. Rose, CA: Was it another HSS or a HSQ?
Crystal, WA: Maybe a HSQ?
Tamarack, ID: 2 HSQs plus a platter lift
Cyrpess B.C.: HSQ I think
Snowbird, UT: HSQ
That's all I can think of.
Alpine Meadows, CA: HSQ <-- Not sure if it's going in this year.
Kirkwood, CA: HSQ
Mt. Rose, CA: Was it another HSS or a HSQ?
Crystal, WA: Maybe a HSQ?
Tamarack, ID: 2 HSQs plus a platter lift
Cyrpess B.C.: HSQ I think
Snowbird, UT: HSQ
That's all I can think of.
- Cameron
#8
Posted 24 January 2004 - 11:08 AM
i already have a list of 4 or 5 for colorado...i'll update my lift news section sometime soon and post the url here. steamboat is only 'maybe' not totally for sure going to do the burgess creek lift this summer. sunshine replacement is scheduled for like 3 or 4 summers from this upcoming one.
#9
Posted 24 January 2004 - 11:21 AM
-squaw may upgrage Links to a FGQ
-sugar bowl has the go-ahead to re-align crows nest, but i dunno when.
-Mt Rose is putting in a HSS and a FGQ
-I think heavenly may remove the tram, but thats not a new lift.
-Homewood has plans for new lifts, but i dunno when they start.
-Dodge Ridge and Bear Valley are likely to be replacing some lifts soon.
-Sierra Summit has the go-ahead for a new lift and a few new runs, but i dunno when.
Thats all i know of right now. And just a note, The new HSQ at Kirkwood will replace chair 7 (Hole 'n Wall). THey have plans for several more lifts including 2 more hsq's besides the one going in this summer.
This year looks like it might be a good one for new lifts :)
-sugar bowl has the go-ahead to re-align crows nest, but i dunno when.
-Mt Rose is putting in a HSS and a FGQ
-I think heavenly may remove the tram, but thats not a new lift.
-Homewood has plans for new lifts, but i dunno when they start.
-Dodge Ridge and Bear Valley are likely to be replacing some lifts soon.
-Sierra Summit has the go-ahead for a new lift and a few new runs, but i dunno when.
Thats all i know of right now. And just a note, The new HSQ at Kirkwood will replace chair 7 (Hole 'n Wall). THey have plans for several more lifts including 2 more hsq's besides the one going in this summer.
This year looks like it might be a good one for new lifts :)
Zack
#10
Posted 24 January 2004 - 11:44 AM
Crystal Mtn, WA is a go ahead only if they get there ROD which was suppose to be available last November, as of today, no ROD has been released.
My guess is that if they get an ROD, they will start on the tram, a 2 year project. Maybe put in a HSQ...
My guess is that if they get an ROD, they will start on the tram, a 2 year project. Maybe put in a HSQ...
#11
Posted 24 January 2004 - 11:53 AM
#13
Posted 24 January 2004 - 12:43 PM
they will be in bachelor gulch...not replacing anything but providing better access to the new hotel they built there. one will go up to the top of the strawberry park lift and the other will run below that.
i would assume they will be doppelmayrCTEC lifts but i can't confirm that yet
i would assume they will be doppelmayrCTEC lifts but i can't confirm that yet
#15
Posted 24 January 2004 - 02:18 PM
Where is the local ridge Allan? I was looking at an old Red Mountain trail map and it shows the lift lines for the next mountain over where there are plans for 2 fixed grip triples and a t-bar or something. However, from looking at Red's expansion, those look to be low capacity HSQs.
- Cameron
#17
Posted 24 January 2004 - 04:48 PM
Yea, I was thinking that too. I just thought it would be weird if you ripped that lift out in the next decade or something, while many of your other lifts are pretty old. Motherload is the only lift that probably needs to be replaced with a HSL.
- Cameron
1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users