garthd's Photo garthd 07 Nov 2006

 poloxskier, on Nov 6 2006, 07:38 PM, said:

That bridge is for the short term, I was referencing mre of long term plans and the reason that it was constructed off of ground level. I have pics to post tonight.

Ah, I see. Big happenings. The construction at the new Peak 7 Base was pretty interesting too.
Reply

poloxskier's Photo poloxskier 07 Nov 2006

Heres a few pics of Breck's new gondola construction.
Attached File  DSCN1944.JPG (1.17MB)
Number of downloads: 41Attached File  DSCN1945.JPG (1.09MB)
Number of downloads: 48Attached File  DSCN1947.JPG (1MB)
Number of downloads: 60nt]
Reply

Peter's Photo Peter 09 Nov 2006

Looks like Stowe has new Omega cabins for their transfer lift. I thought it was going to be a cabriolet?

http://www.stowe.com/mountain/gallery/blow...ountain/pod.php
Reply

Jonni's Photo Jonni 09 Nov 2006

That was an interesting swing. All the news and information that I saw showed that that was going to be a Cabriolet. I look forward to riding this thing this winter.
Reply

necskibum's Photo necskibum 11 Nov 2006

 Jonni, on Nov 9 2006, 07:25 PM, said:

That was an interesting swing. All the news and information that I saw showed that that was going to be a Cabriolet. I look forward to riding this thing this winter.



yea, just was up there last weekend, everything i heard was going towards cabriolet
Reply

SkiBachelor's Photo SkiBachelor 11 Nov 2006

Maybe Stowe thought a short gondola was called a cabriolet?
Reply

floridaskier's Photo floridaskier 13 Nov 2006

Tombstone six pack at The Canyons, keeping with The Canyons' new red theme that showed up on Day Break and Dreamcatcher this summer. Doesn't look like it'll be ready to go by Saturday. I don't see any chairs, and I can't tell if there's a haul rope yet. I hope they can get it finished soon, it's probably the most important lift there after the gondola

Posted Image
Reply

Peter's Photo Peter 13 Nov 2006

It is suprising that The Canyons had Dreamcatcher completed and load tested in mid October, but the much more important Tombstone lift isn't complete yet. Did anyone else read in this months issue of SAM that Soaring Eagle at Snowshoe, West Virginia was completed and load tested in Early August?
Reply

poloxskier's Photo poloxskier 14 Nov 2006

This is not an official word but there was discussion on the radio this morning about Breck pushing back the opening of the Gondola because the two mid stations are not up yet and the rope still has to be pulled. The date discussed was early January.
This post has been edited by poloxskier: 14 November 2006 - 11:25 AM
Reply

Lift Kid's Photo Lift Kid 14 Nov 2006

 poloxskier, on Nov 14 2006, 11:23 AM, said:

This is not an official word but there was discussion on the radio this morning about Breck pushing back the opening of the Gondola because the two mid stations are not up yet and the rope still has to be pulled. The date discussed was early January.

They recently changed it to 1-1-07 but they could change it at any time.
Reply

floridaskier's Photo floridaskier 16 Nov 2006

The DV webcam is now pointing back over towards the new Sterling HSQ. Can't tell if there's any chairs on the line yet (or even if there's a line). Looks like it's going to have 90 degree loading and rotate in the opposite direction of the old Sterling, seeing where the lift sign board is

Attached File(s)

Reply

Peter's Photo Peter 16 Nov 2006

Are those chairs on the Powder Mountain lift different? The backrests look different from the ones on other lifts.
Reply

Skiing#1's Photo Skiing#1 16 Nov 2006

At DV, the old Sterling and new Sterling bottom are not same place. Old ones stood was close to the hill, the skiers skiied pass Sterling Lift toward to Quincy and Red Cloud from Carpenter and Silver Lake or the skiers ski toward Silver Lake and Homesteak either. New Sterling have moved far from the hill, close to the buildings, just like about moved 100 to 200 feet. The skiers will ski under new Sterling to Quincy and Red Cloud or ski under the Sterling from Quincy and Red Cloud to Silver Lake or Homesteak either.

Attached File(s)

  • Attached File  lifts.JPG (750.28K)
    Number of downloads: 85

This post has been edited by Skiing#1: 16 November 2006 - 07:16 PM
Reply

lastchair_44's Photo lastchair_44 16 Nov 2006

 floridaskier, on Nov 16 2006, 04:14 PM, said:

The DV webcam is now pointing back over towards the new Sterling HSQ. Can't tell if there's any chairs on the line yet (or even if there's a line). Looks like it's going to have 90 degree loading and rotate in the opposite direction of the old Sterling, seeing where the lift sign board is

You're right...old Sterl was a left hand carry, new Sterl is right hand...the shack is on the other side of the terminal. I hear that carriers are still on the ground due to a shortage of electricans on Doppelmayr's end...they sell a really nice lift for a good price so I can see why.
Reply

truckintr's Photo truckintr 17 Nov 2006

plus it looks like they werent able to do any dirt work to bring ramp elevation up. Guess Paul and crew will have thier work cut out when they get to build the loading ramp. Boys, break out the shovels.
haha. Something i don't miss, building the loading ramps with snow.
Reply

skier691's Photo skier691 18 Nov 2006

I should have pictures of our nice new 'carpet', but wait, the delivery date has been moved for the 3rd time, the earlist is mid-Dec. It wasn't like it was ordered yesterday. Should be fun installing on Christmas Eve, under the fallout of our guns.
Reply

Peter's Photo Peter 20 Nov 2006

New Photos of the Shock Hill Midstation going in on the BreckConnect Gondola: http://www.mountainresortmag.com/coppermin...astup&cat=0
Breckenridge's website says that the Peak 7 Station won't be open until the 2008/09 Ski Season.
Reply

poloxskier's Photo poloxskier 20 Nov 2006

I havent been able to go by and get any pics of the peak 7 station yet but they have begun the construction and have the frame up for the station.
Reply

Guest_skisox34_* 21 Nov 2006

Is breckconnect going to have one drive terminal or will it be a multiple drive system??
Reply