New lift construction photos
garthd
07 Nov 2006
poloxskier, on Nov 6 2006, 07:38 PM, said:
That bridge is for the short term, I was referencing mre of long term plans and the reason that it was constructed off of ground level. I have pics to post tonight.
Ah, I see. Big happenings. The construction at the new Peak 7 Base was pretty interesting too.
poloxskier
07 Nov 2006
Heres a few pics of Breck's new gondola construction.
DSCN1944.JPG (1.17MB)
Number of downloads: 41
DSCN1945.JPG (1.09MB)
Number of downloads: 48
DSCN1947.JPG (1MB)
Number of downloads: 60nt]
DSCN1944.JPG (1.17MB)
Number of downloads: 41
DSCN1945.JPG (1.09MB)
Number of downloads: 48
DSCN1947.JPG (1MB)
Number of downloads: 60nt]
Peter
09 Nov 2006
Looks like Stowe has new Omega cabins for their transfer lift. I thought it was going to be a cabriolet?
http://www.stowe.com/mountain/gallery/blow...ountain/pod.php
http://www.stowe.com/mountain/gallery/blow...ountain/pod.php
Jonni
09 Nov 2006
That was an interesting swing. All the news and information that I saw showed that that was going to be a Cabriolet. I look forward to riding this thing this winter.
necskibum
11 Nov 2006
Peter
11 Nov 2006
The Sunrise Quad at 49 Degrees North is complete: http://www.ski49n.com/sunrisequad.asp
More new photos:
http://www.skiroundt...m/fifechair.htm
http://www.snowbird....n/peruvian.html
http://www.windhammo...untain_news/340
http://www.mtpeter.com/slideshow_2.htm
http://www.kingpine....tion=3&photo=86
More new photos:
http://www.skiroundt...m/fifechair.htm
http://www.snowbird....n/peruvian.html
http://www.windhammo...untain_news/340
http://www.mtpeter.com/slideshow_2.htm
http://www.kingpine....tion=3&photo=86
floridaskier
13 Nov 2006
Tombstone six pack at The Canyons, keeping with The Canyons' new red theme that showed up on Day Break and Dreamcatcher this summer. Doesn't look like it'll be ready to go by Saturday. I don't see any chairs, and I can't tell if there's a haul rope yet. I hope they can get it finished soon, it's probably the most important lift there after the gondola
Peter
13 Nov 2006
It is suprising that The Canyons had Dreamcatcher completed and load tested in mid October, but the much more important Tombstone lift isn't complete yet. Did anyone else read in this months issue of SAM that Soaring Eagle at Snowshoe, West Virginia was completed and load tested in Early August?
poloxskier
14 Nov 2006
This is not an official word but there was discussion on the radio this morning about Breck pushing back the opening of the Gondola because the two mid stations are not up yet and the rope still has to be pulled. The date discussed was early January.
This post has been edited by poloxskier: 14 November 2006 - 11:25 AM
This post has been edited by poloxskier: 14 November 2006 - 11:25 AM
Lift Kid
14 Nov 2006
poloxskier, on Nov 14 2006, 11:23 AM, said:
This is not an official word but there was discussion on the radio this morning about Breck pushing back the opening of the Gondola because the two mid stations are not up yet and the rope still has to be pulled. The date discussed was early January.
They recently changed it to 1-1-07 but they could change it at any time.
floridaskier
16 Nov 2006
The DV webcam is now pointing back over towards the new Sterling HSQ. Can't tell if there's any chairs on the line yet (or even if there's a line). Looks like it's going to have 90 degree loading and rotate in the opposite direction of the old Sterling, seeing where the lift sign board is
Attached File(s)
-
dvimage.jpg (9.86K)
Number of downloads: 40
Peter
16 Nov 2006
Are those chairs on the Powder Mountain lift different? The backrests look different from the ones on other lifts.
Skiing#1
16 Nov 2006
At DV, the old Sterling and new Sterling bottom are not same place. Old ones stood was close to the hill, the skiers skiied pass Sterling Lift toward to Quincy and Red Cloud from Carpenter and Silver Lake or the skiers ski toward Silver Lake and Homesteak either. New Sterling have moved far from the hill, close to the buildings, just like about moved 100 to 200 feet. The skiers will ski under new Sterling to Quincy and Red Cloud or ski under the Sterling from Quincy and Red Cloud to Silver Lake or Homesteak either.
This post has been edited by Skiing#1: 16 November 2006 - 07:16 PM
Attached File(s)
-
lifts.JPG (750.28K)
Number of downloads: 85
This post has been edited by Skiing#1: 16 November 2006 - 07:16 PM
lastchair_44
16 Nov 2006
floridaskier, on Nov 16 2006, 04:14 PM, said:
The DV webcam is now pointing back over towards the new Sterling HSQ. Can't tell if there's any chairs on the line yet (or even if there's a line). Looks like it's going to have 90 degree loading and rotate in the opposite direction of the old Sterling, seeing where the lift sign board is
You're right...old Sterl was a left hand carry, new Sterl is right hand...the shack is on the other side of the terminal. I hear that carriers are still on the ground due to a shortage of electricans on Doppelmayr's end...they sell a really nice lift for a good price so I can see why.
truckintr
17 Nov 2006
plus it looks like they werent able to do any dirt work to bring ramp elevation up. Guess Paul and crew will have thier work cut out when they get to build the loading ramp. Boys, break out the shovels.
haha. Something i don't miss, building the loading ramps with snow.
haha. Something i don't miss, building the loading ramps with snow.
skier691
18 Nov 2006
I should have pictures of our nice new 'carpet', but wait, the delivery date has been moved for the 3rd time, the earlist is mid-Dec. It wasn't like it was ordered yesterday. Should be fun installing on Christmas Eve, under the fallout of our guns.
Peter
20 Nov 2006
New Photos of the Shock Hill Midstation going in on the BreckConnect Gondola: http://www.mountainresortmag.com/coppermin...astup&cat=0
Breckenridge's website says that the Peak 7 Station won't be open until the 2008/09 Ski Season.
Breckenridge's website says that the Peak 7 Station won't be open until the 2008/09 Ski Season.
poloxskier
20 Nov 2006
I havent been able to go by and get any pics of the peak 7 station yet but they have begun the construction and have the frame up for the station.
Guest_skisox34_* 21 Nov 2006
Is breckconnect going to have one drive terminal or will it be a multiple drive system??