#281 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 23 October 2006 - 02:55 AM

Are those six pack terminals on Peruvian? They look wider than other quad ones. Also, it looks like the bottom terminal is a lot longer than the top (just from counting the windows, 17 to 14). Maybe that's for extra tension carriage travel on a long lift
- Tyler
West Palm Beach, FL - elev. 9 feet

#282 Jonni

    Dreams drive the world.

  • Administrator I
  • 849 Posts:

Posted 23 October 2006 - 04:50 AM

There doesn't seem to be a lot of space at the top of the new Peruvian lift for lining up to get on the carpet through the tunnel. Are they planning on more space for that?
Chairlift n. A transportation system found at most ski areas in which a series of chairs suspended from a cable rapidly conveys anywhere from one to eight skiers from the front of one line to the back of another.

Your Northeastern US Representative

#283 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 23 October 2006 - 04:47 PM

I don't know what exactly the capacity of a carpet is, but the lift is only going to be 1800 per hour and not everyone will be headed for Mineral Basin. Also the top terminal has no drive or tensioning in it, so it can be small because of it is a bottom tension/top vault drive.
- Peter<br />
Liftblog.com

#284 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 23 October 2006 - 05:11 PM

Snowbird has posted their new trail map drawn by James Niehues for this year.



http://www.snowbird..../trailmaps.html
- Peter<br />
Liftblog.com

#285 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 23 October 2006 - 05:57 PM

The Canyons has a new map as well to go with the Dreamcatcher lift

http://www.thecanyon...trail_maps.html

This post has been edited by Skier: 24 October 2006 - 04:07 PM

- Peter<br />
Liftblog.com

#286 floridaskier

    Established User

  • Administrator I
  • 2,814 Posts:

Posted 24 October 2006 - 03:01 AM

http://www.thecanyon...trail_maps.html
New map looks great
- Tyler
West Palm Beach, FL - elev. 9 feet

#287 SkiBachelor

    Forum Administrator

  • Administrator II
  • 6,242 Posts:
  • Interests:Hi, I'm Cameron!

Posted 24 October 2006 - 10:52 PM

Wally, that's cool that Powder Mountain allowed you to talk up and take pictures of the splice.

Looks like the Assay Hill quad at Snowmass is made up from parts of the former Fanny Hill HSQ rather than being an entire new lift.

http://www.mountainresortmag.com/coppermin...cat=0&pos=3
- Cameron

#288 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 26 October 2006 - 05:05 PM

http://www.belleayre.../superchief.htm

http://www.portlandonline.com/transportati...dex.cfm?c=41333

http://www.bigmtn.com/index.php?a=sod/arch...06&amonth=9
(It is a flash photo galley, but there are a few photos of the Easy Rider Quad, which appears to be used from that sightseeing lift that failed in Moab, Utah)
- Peter<br />
Liftblog.com

#289 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 27 October 2006 - 08:06 PM

I just noticed that a new quad is going in at Asessippi Winter Park in Canada. It must be used.



http://www.asessippi.com/
- Peter<br />
Liftblog.com

#290 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 31 October 2006 - 07:23 AM

View PostSkiBachelor, on Oct 24 2006, 11:52 PM, said:

Looks like the Assay Hill quad at Snowmass is made up from parts of the former Fanny Hill HSQ rather than being an entire new lift.


And why not? Since Fanny Hill was one of those 'upgradeable' fixed quads, it stands to reason. It seems from the photos that the only new things on the lift were hanger arms and grips. I imagine Snowmass upgraded the controls and drive as well, but one can't tell from a photo.
Member, Department of Ancient Technology, Colorado chapter.

#291 skiersage

    SAM student

  • Administrator I
  • 858 Posts:

Posted 31 October 2006 - 09:14 AM

View Postliftmech, on Oct 31 2006, 11:23 AM, said:

And why not? Since Fanny Hill was one of those 'upgradeable' fixed quads, it stands to reason. It seems from the photos that the only new things on the lift were hanger arms and grips. I imagine Snowmass upgraded the controls and drive as well, but one can't tell from a photo.


The actual fanny hill alpha drive terminal was used to shorten and upgrade the burlingame lift. So assay hill will likely have all new terminals.
-Sage


If life gives you lemons, make lemonade. And then find someone whose life is giving them vodka and have a party.
-Ron White

#292 poloxskier

    Established User

  • Industry I
  • 1,626 Posts:

Posted 31 October 2006 - 08:06 PM

The peak 8 terminal of Brecks gondola has the outer terminal skins and is awaiting the bullwheel and other asemblies. The loading/unloading platform for the peak 8 station is also comming allong nicely. The com line also has been run from top to bottom. I will have pictures of all of it tomorrow.
-Bryan

Theres a place for all of God's creatures, right next to the mashed potatoes.

"You could say that a mountain is alot like a woman, once you think you know every inch of her and you're about to dip your skis into some soft, deep powder...Bam, you've got two broken legs, cracked ribs and you pay your $20 just to let her punch your lift ticket all over again"

#293 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 31 October 2006 - 08:30 PM

Some new photos of the top station of the BreckConnect:



http://www.mountainresortmag.com/coppermin...m=20&page=2
- Peter<br />
Liftblog.com

#294 skierdude9450

    Established User

  • Member
  • 1,484 Posts:
  • Interests:Skiing, sailing, music.

Posted 01 November 2006 - 02:12 PM

Why is it up on that platform? Will it be a vault drive?
-Matt

"Today's problems cannot be solved by the level of thinking that created them." -Albert Einstein

#295 poloxskier

    Established User

  • Industry I
  • 1,626 Posts:

Posted 01 November 2006 - 03:15 PM

The drawings that I have seen for the new hotel and base development show it as having a plaza at the level of the loading of the lifts where the gondola unloads at the base and a parking garage underneith so that is my assumption of the design. I couldnt tell if it will be vault or not.
-Bryan

Theres a place for all of God's creatures, right next to the mashed potatoes.

"You could say that a mountain is alot like a woman, once you think you know every inch of her and you're about to dip your skis into some soft, deep powder...Bam, you've got two broken legs, cracked ribs and you pay your $20 just to let her punch your lift ticket all over again"

#296 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 03 November 2006 - 09:52 PM

From Crested Butte:

Attached File  5061895.jpg (79.34K)
Number of downloads: 82

The New East River High Speed Quad Gets Ready to Rip!

11-03-06 04:05 PM

Today's second shot is of the top (drive) terminal on the new East River Lift. The lift line terminals and towers are just about ready to go (if the finishing touches aren't yet complete, they're probably being taken care of as you read this), while the grips and chairs will be assembled this weekend for a Monday load test. The lift is deemed ready to transport the public when the load test is complete, so you can imagine that both the CBMR lift maintenance guys and the Poma crew members are working some big hours to button this project up by the end of the weekend.

The pallets in this photo are loaded with the detachable grips that will be mounted atop the chairs and then hung on the haul rope over the next couple of days. You can see the huge springs that generate the force necessary for the grip to clamp on to the haul rope for the carrier's travel up and down the lift line. Those white wheels allow the grip (and chair/carrier) to roll through the terminal when the grip has released from the haul rope. Cool mechanical stuff, and we're wishing the new lift good luck for Monday's load test!



Gettin' It Done on the new East River Lift!

11-03-06 04:04 PM

Attached File  5061890.jpg (77.78K)
Number of downloads: 57

Friday's third shot is of Nathan, a Poma electrician from New Zealand. He's been brought in to help get the new East River Lift squared away. What a view from his office, huh? That's Double Top Mountain in the background.

After being stuck in Snowmass helping out with a project there, Nathan sounded stoked to be in a town that actually has some "ski town" character. Imagine that--a ski town that looks like a ski town, not a suburb. Nathan's been away from home, working seven days a week for a while now (I believe he lives permanently in New Zealand . . . Poma brought him to Colorado via a project in London, so he's been on the road with his tool bag for a bit), but he mentioned wanting to ride CB before heading back down under for their summer. He thinks Crested Butte looks like a sweet mountain and cool town. He's obviously a sharp guy . . .

Thank you for all the help with the lift, Nathan--safe travels home when your adventure's over.

This post has been edited by Skier: 03 November 2006 - 09:53 PM

- Peter<br />
Liftblog.com

#297 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 06 November 2006 - 06:21 AM

Nice- Marketing can't resist putting the company tagline in a writeup about a new lift.
Member, Department of Ancient Technology, Colorado chapter.

#298 garthd

    Established User

  • Industry II
  • 117 Posts:

Posted 06 November 2006 - 03:27 PM

View Postpoloxskier, on Nov 1 2006, 04:15 PM, said:

The drawings that I have seen for the new hotel and base development show it as having a plaza at the level of the loading of the lifts where the gondola unloads at the base and a parking garage underneith so that is my assumption of the design. I couldnt tell if it will be vault or not.

I was up there last week and the Poma guy I talked to said that there would be a bridge going to the slope just to the skier's right of the Colorado. I was there again today, and lo and behold there was the bridge. I will take some pics in the next couple of days. Also, it looked like there was a cable sitting at Shock Hill right below where the terminal there will be.
Garth Dickerman, BR-350 Jockey

#299 poloxskier

    Established User

  • Industry I
  • 1,626 Posts:

Posted 06 November 2006 - 06:38 PM

That bridge is for the short term, I was referencing mre of long term plans and the reason that it was constructed off of ground level. I have pics to post tonight.
-Bryan

Theres a place for all of God's creatures, right next to the mashed potatoes.

"You could say that a mountain is alot like a woman, once you think you know every inch of her and you're about to dip your skis into some soft, deep powder...Bam, you've got two broken legs, cracked ribs and you pay your $20 just to let her punch your lift ticket all over again"

#300 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 06 November 2006 - 07:15 PM

Here are more pictures of the East River lift at Crested Butte. It looks to be almost complete. Mountaian Resort Magazine and Leitner-Poma have done a great job posting pictures of each of their installations. Hopefully Doppelmayr will do the same in future years.

http://www.mountainresortmag.com/coppermin...ls.php?album=46
- Peter<br />
Liftblog.com