

New lift construction photos
#121
Posted 05 August 2006 - 03:52 PM
#122
Posted 05 August 2006 - 04:20 PM
Heres the link: http://winter.skicb.com/page.php?pname=pre...&article_id=463
This post has been edited by RideBurton: 05 August 2006 - 04:23 PM
#123
Posted 06 August 2006 - 05:23 AM
#124
Posted 06 August 2006 - 12:12 PM

Number of downloads: 37

Number of downloads: 49

Number of downloads: 30nt]

Number of downloads: 25

Number of downloads: 29

Number of downloads: 27nt]

Number of downloads: 22

Number of downloads: 51
West Palm Beach, FL - elev. 9 feet
#125
Posted 06 August 2006 - 08:26 PM
Attached File(s)
-
Road_Trip_046.jpg (1.71MB)
Number of downloads: 16 -
Road_Trip_048.jpg (1.34MB)
Number of downloads: 17 -
Road_Trip_051.jpg (1.35MB)
Number of downloads: 12
Liftblog.com
#126
Posted 06 August 2006 - 09:29 PM
Attached File(s)
-
5055768.jpg (76.69K)
Number of downloads: 33 -
1154619934_DSC0239.jpg (93.46K)
Number of downloads: 38
Liftblog.com
#127
Posted 08 August 2006 - 03:44 PM
Skier, on Aug 6 2006, 10:26 PM, said:
Looks like they haven't done anything in a month


"Today's problems cannot be solved by the level of thinking that created them." -Albert Einstein
#128
Posted 09 August 2006 - 10:20 AM

Number of downloads: 28

Number of downloads: 40 New photos of the Snowmass Gondola mid-station.
This post has been edited by Lift Dinosaur: 09 August 2006 - 10:21 AM
#129
Posted 09 August 2006 - 12:43 PM

Number of downloads: 65

Number of downloads: 49And more taken today at Noon!
#130
Posted 09 August 2006 - 01:31 PM
Liftblog.com
#132
Posted 10 August 2006 - 07:57 PM
The top terminal of the new Peruvian Express high-speed quad. The rebar you see indicates the top of the "Vault" walls. The Vault will house the chairlift's main and auxiliary drives and be located below ground to minimize noise.
Attached File(s)
-
371.jpg (89.9K)
Number of downloads: 55
Liftblog.com
#133
#136
Posted 12 August 2006 - 09:53 AM
Skier, on Aug 10 2006, 09:57 PM, said:
The top terminal of the new Peruvian Express high-speed quad. The rebar you see indicates the top of the "Vault" walls. The Vault will house the chairlift's main and auxiliary drives and be located below ground to minimize noise.
I didn't know vault drives were still being built. Apparently so.
#137
Posted 15 August 2006 - 08:36 PM
Pic is of the Lift tower footings being formed.

Number of downloads: 43
#138
Posted 15 August 2006 - 09:11 PM
liftmech, on Aug 12 2006, 10:53 AM, said:
Snowbasin has a couple of vault driven gondolas
Liftblog.com
#139
Posted 15 August 2006 - 09:32 PM
As well as new photos from Belleayre, NY: http://www.belleayre.../superchief.htm
Attached File(s)
-
941_2180_r1_1.jpg (125.35K)
Number of downloads: 21 -
941_2088_r1_1.jpg (84.15K)
Number of downloads: 34 -
941_2200_1.jpg (171.14K)
Number of downloads: 29 -
941_2202_1.jpg (200.4K)
Number of downloads: 38
Liftblog.com
#140
Posted 16 August 2006 - 07:03 PM
Beaver Mountain's new Harry Dream lift is the old Germania or the old Collins as Beaver Mountain bought both lifts from Alta when they were replaced.
6 User(s) are reading this topic
0 members, 6 guests, 0 anonymous users