Possible New Lifts for Summer 2007

Aussierob's Photo Aussierob 11 Jul 2006

View PostSkier, on Jun 12 2006, 09:58 PM, said:

Ok, anyone know of new lifts for next Summer? Here are a few possible ones:

1 Crystal Mountain, Washington DoppelmayrCTEC Triple Northway
2 Tamarack, Idaho DoppelmayrCTEC High Speed Quad
3 Whistler, British Columbia DoppelmayrCTEC High Speed Quad Crystal Express
4 Lookout Pass, Idaho Double Northstar
5 Beaver Creek, Colorado DoppelmayrCTEC High Speed Quad Rose Bowl
6 Burke Mountain, Vermont Leitner-Poma High Speed Quad Willoughby Express

Both Crystal Mountain and Whistler are starting their trams, but they are 2 year projects.


I haven't heard anything about Crystal Chair at Blackcomb. That chair has been on the replacement list for 10 years now and nothing has happened. It isn't likely to unless there is a major shift in planning in the next 6 months. (note: major planning shifts seem to occur about every month here :wacko2: ) We just upgraded the electrical systems on it 2 years ago and this year it's getting a gearbox rebuild, safety upgrades to the chairs (gussets), and bullwheel bearings.

As for the tram, it apparently isn't a done deal yet. We'll have to wait and see. We will be starting an upgrade on the Village Gondola next year. It's a 2 year project with 2 short shutdowns.
Reply

iceberg210's Photo iceberg210 12 Jul 2006

Alta I think got the last two Stealth terminals because another resort might have bought them but cancelled the order.
Reply

liftmech's Photo liftmech 12 Jul 2006

View PostAussierob, on Jul 11 2006, 09:43 PM, said:

We will be starting an upgrade on the Village Gondola next year. It's a 2 year project with 2 short shutdowns.

Are you doing the same thing Aspen did to theirs this spring, with terminal rebuilds/tire turnarounds and control mods?
Reply

Aussierob's Photo Aussierob 14 Jul 2006

The controls were done in '98. Next year is replacement of motors, gearbox and station mechanicals. (Transfer chain is going, to be replaced with tyres) 2008 is cabins, hangers and redoing the station floors to accommodate the new cabin height.
Reply

vons's Photo vons 14 Jul 2006

Treble Cone ski area NZ has announced plans for a gondola (will be the first in NZ) to connect the resort to the valley floor. They said it will be about a 10 min ride much shorter than the 30+min drive currently required to reach the resort. Estimated price on the lift is $20,000,000. It seems the resort has spent the last few years acquiring all the leases along the alignment.
Reply

Peter's Photo Peter 14 Jul 2006

Would this be a Leitner-Poma I assume?
Reply

vons's Photo vons 15 Jul 2006

I don't think so Treble Cone has only Doppelmayrs with the last being a FGQ that was built two years ago
Reply

Ontariodude's Photo Ontariodude 19 Jul 2006

hello im new to the forum,

does anyone know any info about where the new lifts at kicking horse in golden, BC will be and when they will be installed? i saw something in the other topic "possible new lifts for 2006" that there is a proposed British Columbia Chair[i]. :helpsmilie: does anyone know about where this lift will be located and what typw it will be? :w00t: :helpsmilie: :thumbsup:
Reply

Peter's Photo Peter 19 Jul 2006

Here is a map of the proposed layout

Attached File(s)

Reply

Ontariodude's Photo Ontariodude 20 Jul 2006

Where did you find that?

That is really awesome, I can't wait for it to be fully built out. Looks like the vertical will increase! Does anybody know about the types of lifts that the new lifts will be?
This post has been edited by Ontariodude: 20 July 2006 - 08:00 AM
Reply

Peter's Photo Peter 20 Jul 2006

I actually don't remember where I got it.
Reply

Ontariodude's Photo Ontariodude 20 Jul 2006

Thank you Skier, ive been looking forever to find out what the resort would look like when its done.

This site is awesome. (sorry if this is off topic)
Reply

WBSKI's Photo WBSKI 21 Jul 2006

Hey, Aussierob, when are they planning to put the towers in on Picollo, I was up there on Wednesday and was suprised they were not in yet..
Reply

dromo_mania's Photo dromo_mania 22 Jul 2006

Piccolo is flying the last concrete this week. We've had some trouble arranging a heavy lift helicopter for the project due to the fire danger in this part of BC.

Lots of concrete to pour - about 150 m cubed. Lower road is in although we're getting in shape with the 40 minute hike to the top from Harmony unload!
Reply

Aussierob's Photo Aussierob 23 Jul 2006

I'm not sure what Doppelmayr's schedule is. Obviously there is still concrete to fly and I haven't seen the towers arrive in town yet so it won't be too soon. I think the concrete needs to cure for at least a couple of weeks before tower installation. Whats really interesting is that this is almost a stealth project. I've been wanting to go out and take some pictures but it would be almost 3 hours on an ATV to travel out there, take photos and ride back. You can't just stop by for a look on your way to somewhere.
Reply

WBSKI's Photo WBSKI 23 Jul 2006

Its true! At the moment, nothing is visible, no signs, nothing from the open trails. Here is a View from near the top of Harmony

Attached File(s)

Reply

Warren733's Photo Warren733 09 Aug 2006

Wolf Laurel, NC Will Be getting a Scenic Double Chairlift, I read it at http://skiwolflaurel.com (By the way, Wolf Laurel is Near Asheville, NC)
This post has been edited by Warren733: 09 August 2006 - 07:31 AM
Reply

skiersage's Photo skiersage 09 Aug 2006

Posted Image

By the looks of this map, Mont Ripley is looking into another chairlift for the far right side of the mountain. I don't know when this will be as to whether it will be next year or not. But it is something to look for in the coming year(s).
Reply

iceberg210's Photo iceberg210 15 Aug 2006

It was suggested earlier in the topic that Big Sky might be looking into replacing its Gondola with a new one or possibly a HSQ. Although the gondola is a bit worse for wear since it is mainly used in the summer (even then I think the lifts are used more often if I remember correctly) and only on very busy times in the winter it doesn't see to terribly much use so unless Big Sky is hoping to better utilize it I would highly doubt that they would spend such a high amount of money on a new gondola. Also if they did want to replace it with a HSQ I find this quite odd in that they already have a HSQ (Swift Current) that runs paralel to and serves the exact same terrain as the gondola.
I think that the more likely route for Big Sky would be to modernize various other areas of the resort such as Shedhorn or the Moose triple. But as I haven't heard anything on that front it may very well be that they are planning a replacement for the gondola.
Reply

Peter's Photo Peter 15 Aug 2006

The gondola was redone in both 1997 and 2000, so I can't imagine it being replaced. I would have to think that Shedhorn is up next for replacement. On another note, I heard that an area on the backside of Lone Peak was leased to BS from YC for skiing next season. I think it was called "Texas" or "Oklahoma" or something like that. I don't think any new lifts are involved, but new terrain.

Also Spanish Peaks plans to build a lift from the bottom of Southern Comfort to the top of Lone Moose in the next couple years. YC is going to build the Eglise gondola, and Moonlight has new lifts on the table as well.
Reply