New lift construction photos
Peter
26 May 2006
Construction has begun on the Piccolo Express at Whistler... http://www.whistlerb...ccolo/index.htm
lastchair_44
28 May 2006
Sterling crossarms and towers were flown out today...really crappy weather but it went very well....here are some pics
Attached File(s)
-
sterling_fly_day_003.jpg (704.46K)
Number of downloads: 88 -
sterling_fly_day_004.jpg (663.01K)
Number of downloads: 27 -
sterling_fly_day_005.jpg (670.12K)
Number of downloads: 21 -
sterling_fly_day_006.jpg (665.48K)
Number of downloads: 62 -
sterling_fly_day_007.jpg (670.15K)
Number of downloads: 32 -
sterling_fly_day_008.jpg (678.15K)
Number of downloads: 28 -
sterling_fly_day_009.jpg (687.9K)
Number of downloads: 28 -
sterling_fly_day_010.jpg (698.95K)
Number of downloads: 44 -
sterling_fly_day_011.jpg (681.4K)
Number of downloads: 19
truckintr
28 May 2006
Good Pics, but,,, can you edit them so they are turne dinto the right poistions to view,, my neck now has kinks in it from turning every which way to view the pics.
skisolitude
29 May 2006
There are more pictures of the tunnel and the new lift at Snowbird.
mcjones55
29 May 2006
the K-max is an amazing machine made in my home state.
check out this site for lots of info on the K-max
http://www.markusherzig.com/kmax/
check out this site for lots of info on the K-max
http://www.markusherzig.com/kmax/
Kicking Horse
31 May 2006
Not sure if this has been posted or not but here is the terminal install on the Elk Camp Gondola.
http://www.aspensnowmass.com/images/dyn/br...minal052206.jpg
http://www.aspensnowmass.com/images/dyn/br...minal052206.jpg
SkiBachelor
31 May 2006
It won't be long until Mt. Bachelor starts taking down Pine Marten Express. It looks like the process has already begun.
http://mtbachelor.co...ent_conditions/
http://mtbachelor.co...ent_conditions/
lastchair_44
31 May 2006
vons
01 Jun 2006
Stopped by snowmass yesterday here are some pics.
Attached File(s)
-
DSCN0235.JPG (987.6K)
Number of downloads: 129 -
DSCN0249.JPG (995.61K)
Number of downloads: 72
vons
01 Jun 2006
Funnel is gone you can see about as much of it that is left on site in the picture. Assy hill still has its rope and the chairs are neatly stacked at the bottom but the lift shack has been removed. Any one know what is going to happen to The Assy hill lift? from what I could see it is in great shape for 37 years old.
boardski
03 Jun 2006
Are they planning on removing Naked Lady lift also?? The "Renassance of Snowmass" section on their website calls for it this Summer, however, maybe there is not enough time or maybe they are leaving it until they have a place to reinstall it at one of the other mountains or sell to anther area. Naked Lady likely does not have many hours on it since it was installed in 1981 and only ran full time up until 1993 when Alpine Springs HSQ went in which took away the need to open Naked Lady chair except for extremely crowded days which are fairly rare at Snowmass.
poloxskier
03 Jun 2006
boardski, on Jun 3 2006, 04:48 PM, said:
Are they planning on removing Naked Lady lift also?? The "Renassance of Snowmass" section on their website calls for it this Summer, however, maybe there is not enough time or maybe they are leaving it until they have a place to reinstall it at one of the other mountains or sell to anther area. Naked Lady likely does not have many hours on it since it was installed in 1981 and only ran full time up until 1993 when Alpine Springs HSQ went in which took away the need to open Naked Lady chair except for extremely crowded days which are fairly rare at Snowmass.
I have not heard much about naked lady but I had heard that it has not even been certified for the last few years so I dont know if they would even bother reinstalling it.
liftmech
06 Jun 2006
Chair 3, Mt Baker's last Murray-Latta, is going down to make way for a new CTEC quad (photo credit to Zop, Baker's lift manager)
Attached File(s)
-
say_bye_bye.JPG (95.87K)
Number of downloads: 116