Snowmass to get a Six pack and 8 Pax Gondola
Lift Dinosaur
20 Dec 2005
liftmech, on Dec 1 2005, 06:25 AM, said:
Another late-night project... would this be considered a service project under Rod or is it still tasked to the install guys?
Sorry for the late reply, John - I missed this. The new tower work was done by Installations as they were still there working on the gondola. (Thank God!)
skiersage
26 Dec 2005
We finally have some images of new lifts at snowmass thanks to http://www.coloradoskihistory.com! That new pulse gondola is something else. The vault drive on it is similar to the ones usually seen on older riblets. The last thing that needs to be solved in what has changed on burlingame. We have yet to get confirmation on what the top terminal is like.
This post has been edited by skiersage: 26 December 2005 - 07:35 PM
Attached File(s)
-
snowmass_dec05_0002.jpg (30.04K)
Number of downloads: 23 -
snowmass_dec05_0003.jpg (33.58K)
Number of downloads: 27 -
snowmass_dec05_0004.jpg (38.66K)
Number of downloads: 31 -
snowmass_dec05_0041.jpg (29.21K)
Number of downloads: 32
This post has been edited by skiersage: 26 December 2005 - 07:35 PM
spunkyskier01
27 Dec 2005
what would u like to know about the summit at burlingame? i rode that chair in the summer, right after its reconstruction.
coskibum
30 Dec 2005
Burlingame used to be a vault drive riblet, it was shortened about 1/4 of the line down from its old summit. it now sports a new leitner-poma alpha drive:

also, the last picture posted above with the new 6-pack over the building is the additional tower they had to install.
the summit of sam's knob:


midstation

more pictures of these new lifts here: http://www.colorados...s/snowmass.html

also, the last picture posted above with the new 6-pack over the building is the additional tower they had to install.
the summit of sam's knob:


midstation

more pictures of these new lifts here: http://www.colorados...s/snowmass.html
skiersage
30 Dec 2005
Yea, that is what I wanted to know. the new drive is probably off of the old fanny hill lift. the thing is that the alpha is a drive tension terminal. and the old lift had bottom tensioning. so did they replace or modify the bottom or did they just take the tensioning off the top?