#1 heavenly_romer

    HI

  • Member
  • 316 Posts:

Posted 02 June 2005 - 09:15 PM

These are pics as of June 2nd...
http://forums.mammothmountain.com/forum/me...6&enterthread=y

It's not fair! Why must it be so far away?!

Over 4th of July, they are planning on running chairs 1, 2, 3, 11, and either 23 or the gondolas, depending on the days (The gondola is now closed during the week to prepare it for the summer)

Sorry everyone in the northwest, we took all your snow. :devil:




Sorry should I have put this in the images section? If anyone wants to move it, go ahead. :blush:

This post has been edited by heavenly_romer: 02 June 2005 - 09:19 PM


#2 Duck

    Mechanical Designer

  • Member
  • 391 Posts:
  • Interests:-Snowboarding and lifts :)<br />-Transportation Technology<br />-Windturbines<br />-Amusement Rides and Technology<br />-Industrial Automation and Robotics (the industry in which I am employed)<br />-Minimoto

Posted 03 June 2005 - 03:56 AM

In the second pictures, are those guys using a come along to lift up the haul rope, so they can replace a sheave?

-Iain

#3 KZ

    Multipurpose Machine

  • Industry II
  • 2,087 Posts:
  • Interests:Howdy folks, Im Zack and I live in California.

Posted 03 June 2005 - 05:53 AM

I wanted to go up over the 4th but I have to move again this summer (horay!). That snow got kinda nasty fast but there is still a ton. I was looking at some pictures of them plowing the road to devil's postpile and it is easily 8 or 9 feet deep. It sure was a good snow year.
Zack

#4 Aussierob

    Lift Sparky

  • Industry II
  • 1,036 Posts:
  • Interests:Search and Rescue
    Hockey
    Ski Touring
    Geocaching

Posted 03 June 2005 - 06:52 AM

Duck - Yes, if one needed replacing. They can also check and grease the bushings and sheave bearings as well.
Rob
Ray's Rule for Precision - Measure with a micrometer, mark with chalk, cut with an axe.

#5 mmsa

    Established User

  • Industry II
  • 73 Posts:
  • Interests:Elk Hunting, Archery of any type,

Posted 04 June 2005 - 06:02 AM

We use a 3 ton chain come along to lift most of the weight off the sheaves. Then we install our sheave crane to replace the heavy 500 sheaves. The sheave crane really saves the back when you have a lot of sheaves to replace. The pictures of the guys on the tower is on Panorama Gondola.

Attached File(s)


I don't understand it
I've cut it twice and it is still too short

#6 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 04 June 2005 - 06:44 AM

Am I seeing the photo right, or are the guys using two chain hoists on that gondola tower? Must be heavy.
Member, Department of Ancient Technology, Colorado chapter.

#7 mmsa

    Established User

  • Industry II
  • 73 Posts:
  • Interests:Elk Hunting, Archery of any type,

Posted 04 June 2005 - 11:04 AM

This tower is just before the big span to the top of the mountain. They are using 2 3 ton chain come-alongs to lift lift the rope, yes a very heavely loaded tower.
I don't understand it
I've cut it twice and it is still too short