heavenly_romer's Photo heavenly_romer 02 Jun 2005

These are pics as of June 2nd...
http://forums.mammothmountain.com/forum/me...6&enterthread=y

It's not fair! Why must it be so far away?!

Over 4th of July, they are planning on running chairs 1, 2, 3, 11, and either 23 or the gondolas, depending on the days (The gondola is now closed during the week to prepare it for the summer)

Sorry everyone in the northwest, we took all your snow. :devil:




Sorry should I have put this in the images section? If anyone wants to move it, go ahead. :blush:
This post has been edited by heavenly_romer: 02 June 2005 - 09:19 PM
Reply

Duck's Photo Duck 03 Jun 2005

In the second pictures, are those guys using a come along to lift up the haul rope, so they can replace a sheave?

-Iain
Reply

KZ's Photo KZ 03 Jun 2005

I wanted to go up over the 4th but I have to move again this summer (horay!). That snow got kinda nasty fast but there is still a ton. I was looking at some pictures of them plowing the road to devil's postpile and it is easily 8 or 9 feet deep. It sure was a good snow year.
Reply

Aussierob's Photo Aussierob 03 Jun 2005

Duck - Yes, if one needed replacing. They can also check and grease the bushings and sheave bearings as well.
Reply

mmsa's Photo mmsa 04 Jun 2005

We use a 3 ton chain come along to lift most of the weight off the sheaves. Then we install our sheave crane to replace the heavy 500 sheaves. The sheave crane really saves the back when you have a lot of sheaves to replace. The pictures of the guys on the tower is on Panorama Gondola.

Attached File(s)

Reply

liftmech's Photo liftmech 04 Jun 2005

Am I seeing the photo right, or are the guys using two chain hoists on that gondola tower? Must be heavy.
Reply

mmsa's Photo mmsa 04 Jun 2005

This tower is just before the big span to the top of the mountain. They are using 2 3 ton chain come-alongs to lift lift the rope, yes a very heavely loaded tower.