1st Hsq In World Found!
Tinel
26 Nov 2003
Chains were used (in Switzerland) by:
Garaventa
WSO-Staedelilift
(Baco-)Poma
von Roll
Habegger
Giovanola & frères
Muellerlifts (GMD)
Rowema
Garaventa
WSO-Staedelilift
(Baco-)Poma
von Roll
Habegger
Giovanola & frères
Muellerlifts (GMD)
Rowema
KZ
26 Nov 2003
I think everyone used chains before they found a reliable way to get the tyres to take the carrier around the contour
SkiBachelor
27 Nov 2003
Another picture of the lift.
Attached File(s)
-
doppelmayr.jpg (65.95K)
Number of downloads: 120
Kicking Horse
27 Nov 2003
That pic is not from Breck. I'm 100% sure that is not breck.
Dr Frankenstein
28 Nov 2003
Not the same grips, not the same towers, not the same chairs, it's not this lift.
liftmech
28 Nov 2003
Conveyor chains were the first method of moving chairs around the contour, as Cameron noted. I don't know how maintenance-intensive Doppelmayr's are, but Poma's take a week per terminal to work on in the summer. Then there's the small problem of the cadencing system being a 'passive' system, instead of the more modern 'active' tyre banks. A passive system means that the chair comes into the terminal and either is caught by the chain or not. An active system, on the other hand, constantly fine-tunes the spacing of the carriers as they come through, eliminating (or almost) chair collisions.
Dr Frankenstein
14 Jan 2004
Does the Orange (formerly Quicksilver) chairlift have gravity grips????
floridaskier
29 Feb 2004
I dont think so. I think it had the box-style grip in use until about '94 (?).
(no actual info on this, don't hold me to it)
(no actual info on this, don't hold me to it)
liftmech
14 Mar 2004
The former Quicksilver doesn't have DS grips? It must have been retrofitted, then, because the DS grip was the first detachable grip and it was on the Quicksilver when it was at Breckenridge,
floridaskier
15 Mar 2004
The chain spacing system on the older Doppelmayrs like at Vail looks pretty simple. The chair is caught by two sort of hook things that are spaced out as far as the distance between the chairs should be. The chains catch the chair. But what would happen if one of them missed the chain hooks and the next one crashed into it?
SkiBachelor
15 Mar 2004
We discussed this a while back with the POMA Angel terminals. If the lift operator was able to see that the chair missed and stopped the lift in time, he would be able to put it on the rail, but if he missed , well there would be a problem. Doppelmayr's seem not to have this problem from what I have seen.
Dr Frankenstein
15 Mar 2004
The operator at St-Sauveur was going crazy because he didn't wanted to stop the lift! He was running in all the ways!
floridaskier
16 Mar 2004
SkiBachelor, on Mar 15 2004, 12:58 PM, said:
We discussed this a while back with the POMA Angel terminals. If the lift operator was able to see that the chair missed and stopped the lift in time, he would be able to put it on the rail, but if he missed , well there would be a problem. Doppelmayr's seem not to have this problem from what I have seen.
Do you mean he would put it on the maintainance rail and put it back next time the spot came around, or push it back into the chains that it missed?