Mt. Bachelor Pictures
SkiBachelor
15 Dec 2003
The top terminal. I didn't want to take another picture of inside because I felt like I mgiht get in trouble. Maybe later when I have clearance. B)
Attached File(s)
-
summit4.jpg (39.27K)
Number of downloads: 38
liftmech
18 Dec 2003
That lift gets a great deal of rime- every time I've been there it looks exactly like that. The crew that opens up the lift after a day or so of downtime has to knock off quite a bit of it to run the lift. I've heard of 'ice tunnels' around the sheaves and rope on the towers; only the moving parts are warm enough to stay ice-free. Thus the necessity for the night drive...
floridaskier
02 Jan 2004
Inside the Summit Express terminal buildings, do they have real snow or some fake stuff for the loading ramps?
KZ
02 Jan 2004
they had some carpet at the bottom of eagle express (the uni-g) at mamomth due to lack of snow. It was a bit stickey
floridaskier
04 Jan 2004
Sometimes they have carpet or AstroSnow or whatever else you want to call it at the bottom of PCMR's Town lift (85 CTEC FGT) that starts on Park City's Main Street. It's really weird under your skis
liftmech
07 Jan 2004
We are
but anyway- I've put down treated plywood an inch lower than ramp height, and then bolted inch-square bars of UHMW plastic down every foot or so. That provides a smooth surface, and also holds the snow in place.

CAski
13 Jan 2004
Squaw just uses hay. I still had some stuck to my skis from Thanksgiving this Christmas.
SkiBachelor
13 Jan 2004
Mt. Bachelor uses that stuff too, although only at the start of the season. I have some pictures of this on the site if you look at the Mt. Bachelor pictures. :)
floridaskier
16 Jan 2004
DV hasnt got much of a problem with unloading ramp snow, and they don't use wooden ramps, all snow. It does get a little blown off though
liftmech
13 May 2004
Cameron, I'm going to tag a pic onto your thread here; it seemed an appropriate place.
The Yellow chair (seen in the middle between Pine Marten on the left and Red on the right) got removed, did it not?
The Yellow chair (seen in the middle between Pine Marten on the left and Red on the right) got removed, did it not?
Attached File(s)
-
Bachelor_from_West_Village.JPG (44.48K)
Number of downloads: 30
SkiBachelor
13 May 2004
Yes this lift was removed and only two towers remain of this lift along with the top station's lift shack. :(
crazyskier91
24 May 2004
Why is it resorts tend to leave stuff like operator shacks and unloading platforms?
liftmech
24 May 2004
Most don't, actually. You'd be hard-pressed to find any evidence of the old lifts at Copper unless you hiked the lines. All that remains of them are the tower footings, whether it's the Heron bolt cage or a torched-off piece of tubular steel from the Yans. The only lift I've found a terminal footing from is old I-lift. Same with Crystal and Whistler. As to why some resorts do leave things, my theory (having torn out a lift before) is that they ran out of time.
SkiBachelor
24 May 2004
The line equipement that remains from the yellow chair is actually used. The top lift shack is used for NASTAR while the bottom tower has a Borer tube tow attached to it.
Dr Frankenstein
24 May 2004
Mont St-Sauveur leaves many things whan they remove chairlifts. We still can see:
-The bottom terminal of the côte 69 double
-The unloading platform of the same lift
-Almost all the towers of the côte 71 T-Bar
-etc.
-The bottom terminal of the côte 69 double
-The unloading platform of the same lift
-Almost all the towers of the côte 71 T-Bar
-etc.
crazyskier91
24 May 2004
liftmech, on May 24 2004, 07:05 AM, said:
Most don't, actually. You'd be hard-pressed to find any evidence of the old lifts at Copper unless you hiked the lines. All that remains of them are the tower footings, whether it's the Heron bolt cage or a torched-off piece of tubular steel from the Yans.
You mean hiking the lines and looking for things, and what is a Heron bolt cage?
liftmech
26 May 2004
I mean hiking the old liftline.
A Heron bolt cage is the bolts embedded in concrete that held the tower to the footing. Yan and Riblet were direct burial- the tower was placed in the hole, aligned using three small hand winches, and then concrete was poured around it. Riblet had a sleeve which was place in the hole before concrete was poured, and then once the footing set up, the tower was place in the sleeve and welded. Later they placed a piece of pipe with half of a bolted flage welded on top; the matching half was welded to the bottom of a tower. Most other manufacturers have some variation on the bolt cage. Now that we're
A Heron bolt cage is the bolts embedded in concrete that held the tower to the footing. Yan and Riblet were direct burial- the tower was placed in the hole, aligned using three small hand winches, and then concrete was poured around it. Riblet had a sleeve which was place in the hole before concrete was poured, and then once the footing set up, the tower was place in the sleeve and welded. Later they placed a piece of pipe with half of a bolted flage welded on top; the matching half was welded to the bottom of a tower. Most other manufacturers have some variation on the bolt cage. Now that we're

floridaskier
26 May 2004
The Canyons has the bottom tension support for the old Raptor FGQ- a CTEC moved to Dreamscape that ran next to Golden Eagle- on the runout down to Golden Eagle. I dont know if it's still there, I didn't go down there this year.