

Lifts that Need a Replacement
#222
Posted 08 May 2016 - 07:47 AM
http://sugarloafphotos.blogspot.com/
#223
Posted 08 May 2016 - 08:20 AM
NHskier13, on 08 May 2016 - 07:23 AM, said:
Let's not.
And I thought Loon got crowded.
Sacdelic_Skier, on 08 May 2016 - 07:47 AM, said:
This is the best I could find online, but I do remember the line stretching to where this photo was taken (This photo was taken on a weekday)

Past the lift is a traverse down to the sunbowl, which has no lines typically. That day, everyone thought I was cutting the line when I was trying to weave through.
#224
Posted 08 May 2016 - 08:43 AM
Smacpats, on 07 May 2016 - 06:13 PM, said:



It looks like that aren't loading the chairs in groups of six. I see the exact problem on big blue and gold coast at squaw.
This post has been edited by julestheshiba: 08 May 2016 - 08:44 AM
-Will
#227
Posted 10 May 2016 - 12:12 PM
SkiDaBird, on 10 May 2016 - 01:42 AM, said:
Oh my.
NHskier13, on 08 May 2016 - 04:30 PM, said:
Well to be fair, in the third picture the gondola and the chair next to it were on wind hold, which meant it was the only way out of the base.
#228
Posted 10 May 2016 - 01:03 PM


The only day I ever have had line problems were the following:
MLK weekend, upper sunbowl six-pack was completely shut down and broken, lower was stopping every 15 seconds, with a three hour long
Burton US open (It was in sunbowl). Too bad stratton doesn't host it anymore...

Or maybe not too bad.
lunch can be a problem anywhere though. Alta pulled the words out of my mouth, put it on a sign, and threw it on a tower of wildcat:

This post has been edited by Smacpats: 10 May 2016 - 01:05 PM
#229
Posted 15 May 2016 - 01:56 PM
http://i.imgur.com/8gslFgx.png
http://i.imgur.com/cz47p1v.png
#230
Posted 15 May 2016 - 03:46 PM
Smacpats, on 15 May 2016 - 01:56 PM, said:
http://i.imgur.com/8gslFgx.png
http://i.imgur.com/cz47p1v.png
You do realize those are from two and three years ago, right? It's been hinted at for years.
#231
Posted 15 May 2016 - 05:14 PM
eagle628, on 15 May 2016 - 03:46 PM, said:
Yes I know that, although look at how close they are. They have to finish dealing with financing (Which I'm assuming they could have in 2 years), get a FS permit and call LP or dopp. They could reuse the towers with new detach equipment and chairs, new sheaves, keep the towerheads if possible and be done. 90 degree loading at bottom station and standard at top, they could keep the towers all the same excluding a portal depression tower to replace the one currently attached to the terminal:

I'm not in the industry, but I know for a fact installing towers and concrete footings (they would still need to install 5, both terminals have 2 and the bottom depression portal tower) is one of the most, if not the most expensive part in installing lifts.
#233
Posted 17 May 2016 - 04:07 PM
RibStaThiok, on 15 May 2016 - 09:10 PM, said:
Smacpats, on 15 May 2016 - 05:14 PM, said:

I'm not in the industry, but I know for a fact installing towers and concrete footings (they would still need to install 5, both terminals have 2 and the bottom depression portal tower) is one of the most, if not the most expensive part in installing lifts.
I don't know. They must have fallen off/been taken off like on the South American quad:

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users