←  Skilifts.org General Discussion

Skilifts.org / SORT Forum

»

New Lifts 2015

Peter's Photo Peter 24 Jun 2015

View Postskier691, on 24 June 2015 - 01:41 PM, said:

Christmas Mtn, WI lift is listed as a Doppelmayr Eco-Drive quad.

Can you cite your source? Mont Cascades' new quad will also be an Eco-Drive.
Reply

skier691's Photo skier691 24 Jun 2015

Midwest Ski Area Association newsletter.
Reply

djspookman's Photo djspookman 25 Jun 2015

View Postdjspookman, on 24 June 2015 - 06:57 AM, said:


The re-use of J Gore's chairs is news to me, but certainly a possibility.


Although, now that i'm thinking about it.. HSDQ to FGQ? Can one just swap grips? I'm also trying to grasp where else the chairs would go...
Reply

Snowy Ferries's Photo Snowy Ferries 25 Jun 2015

View Postdjspookman, on 25 June 2015 - 12:20 PM, said:

Although, now that i'm thinking about it.. HSDQ to FGQ? Can one just swap grips? I'm also trying to grasp where else the chairs would go...

In theory, all that would need to be done is to replace the grips. I can't confirm this, but I think I heard once at Targhee, that one of Sacajewea's HSQ carriers was transferred to the Shoshone FGQ.
Reply

snoloco's Photo snoloco 25 Jun 2015

I'm guessing that the grips would be reused on the new bubble chairs. The hanger arms would be refitted with fixed grips for installation on the new fixed grip quad. I honestly don't know how they can convert the Jackson Gore lift. Bubble chairs are extremely heavy, so the line equipment needed for a bubble 4 would be equivalent to that of a 6-pack with no bubble and the line equipment needed for a bubble 6 would be equivalent to what is needed on an 8 passenger gondola. They would probably need to run less chairs, which would reduce capacity on the new Quantum 4.
Reply

liftmech's Photo liftmech 26 Jun 2015

Snoloco is correct in that bubble carriers are much heavier. Either they're going to upgrade the line and basically re-engineer the entire lift to keep capacity, or they're going to have to cut down the number of chairs. As for converting, if the new bubble chairs are not automatic there's no need for additional equipment. If they are, one would need the opening/closing ramps installed in both terminals.
To change the carriers from detachable to fixed-grips, they'd need new hanger arms as well as grips. On Pomas, at least, the two hangers are different.
Reply

jclark's Photo jclark 26 Jun 2015

Not a new install, but Sugarloaf announced lift projects yesterday: Sugarloaf Announces Fixed Grip Chairlift Projects

The King Pine Quad (which had the rollback) is getting a new Doppelmayr drive terminal, but the rest of it will remain Borvig.
Reply

djspookman's Photo djspookman 26 Jun 2015

View Postliftmech, on 26 June 2015 - 05:17 AM, said:

Snoloco is correct in that bubble carriers are much heavier. Either they're going to upgrade the line and basically re-engineer the entire lift to keep capacity, or they're going to have to cut down the number of chairs. As for converting, if the new bubble chairs are not automatic there's no need for additional equipment. If they are, one would need the opening/closing ramps installed in both terminals.
To change the carriers from detachable to fixed-grips, they'd need new hanger arms as well as grips. On Pomas, at least, the two hangers are different.



Good to know, thanks! Both lifts (new Sunshine Quad-FGQ) and the Jackson Gore HSDQ are Poma.
Reply

llamborghinii's Photo llamborghinii 26 Jun 2015

Can anyone tell me why Copper isn't going to install Tucker Mtn this summer? I remember late this season I just missed the Tucker Cat and ski patrol told me that it wasn't gonna go in because of the Forest Service....that's all could get out of them though.

In regards to Loveland lift 9 mid-station, I heard the reason it's not used anymore was because it literally got blown away and was way too much effort to keep open as a result.

Also, for Chair 5 at Loveland (The one that goes over route 6), I've heard that the reason it's not used anymore is because the forest service complained about garbage getting dropped in Clear Creek, yet on Loveland's MDP it shows the chair getting shortened which implies that they want to reopen it.

I'm hoping Loveland can install chair 10 in the next 3 years. Seeing how little I've heard about the project though, this may be a stretch.
Reply

vons's Photo vons 04 Jul 2015

I contacted SkyTrac lifts, they have two complete lift projects and a number of terminal replacement or lift modification projects this summer. Some resorts get upset if you let the cat out of the bag so I'll just say that one of the new lifts is in ID and the other is in AZ.
Reply

jaytrem's Photo jaytrem 04 Jul 2015

View Postvons, on 04 July 2015 - 07:51 AM, said:

I contacted SkyTrac lifts, they have two complete lift projects and a number of terminal replacement or lift modification projects this summer. Some resorts get upset if you let the cat out of the bag so I'll just say that one of the new lifts is in ID and the other is in AZ.


Hmmmm, Magic has been talking about an expansion for a number of years, but they're sitting on Jackson Hole's old Casper lift.


I don't think this has been mentioned yet, but Kissing Bridge in NY is removing their Coal Chute double, not sure if the new chair is going in right away....

http://www.kbski.com...r-to-come-down/
Reply

Peter's Photo Peter 04 Jul 2015

View Postjaytrem, on 04 July 2015 - 02:05 PM, said:


Hmmmm, Magic has been talking about an expansion for a number of years, but they're sitting on Jackson Hole's old Casper lift.



I doubt it's Magic. Both Tamarack and Soldier Mountain have new owners that could be building new lifts. Could also be a short lift for one of Brundage's new housing developments.

Arizona Snowbowl has a new owner who is already building lifts at Sipapu and Durango. They also have four new lifts in the master plan. Just a guess.

Thanks for the intel vons.
Reply

jaytrem's Photo jaytrem 04 Jul 2015

View PostPeter, on 04 July 2015 - 05:35 PM, said:


I doubt it's Magic. Both Tamarack and Soldier Mountain have new owners that could be building new lifts. Could also be a short lift for one of Brundage's new housing developments.

Arizona Snowbowl has a new owner who is already building lifts at Sipapu and Durango. They also have four new lifts in the master plan. Just a guess.

Thanks for the intel vons.



Magic did mention expansion on Facebook back in March. But I too doubt they would be the ones buying a whole new lift. Soldier has 2 Yans in storage, so I doubt it's them. Tamarack does need a replacement for Wildwood, guess they could do it with a fixed grip. That would be my best guess, but probably a lousy guess. It's probably some place crazy like Rotorun.
Reply

ewh5987's Photo ewh5987 06 Jul 2015

View Postjaytrem, on 04 July 2015 - 06:34 PM, said:



Magic did mention expansion on Facebook back in March. But I too doubt they would be the ones buying a whole new lift. Soldier has 2 Yans in storage, so I doubt it's them. Tamarack does need a replacement for Wildwood, guess they could do it with a fixed grip. That would be my best guess, but probably a lousy guess. It's probably some place crazy like Rotorun.



http://www.pomerelle...Special_Events/
It might be Pomerelle. They mention "equipment upgrades" this summer but there is no additional information.
Reply

liftmech's Photo liftmech 09 Jul 2015

View Postllamborghinii, on 26 June 2015 - 07:55 PM, said:

Can anyone tell me why Copper isn't going to install Tucker Mtn this summer? I remember late this season I just missed the Tucker Cat and ski patrol told me that it wasn't gonna go in because of the Forest Service....that's all could get out of them though.


I'm not certain what patrol was told, but we were informed that Powdr was taking a year off of capital projects (at least the big ones) to get its financial house in order. Management is fairly certain we'll get to do a lift next year but we're not sure which one, as we have several on the hit list. I'll keep y'all informed as I hear more.
Reply

RibStaThiok's Photo RibStaThiok 15 Jul 2015

View Postjaytrem, on 04 July 2015 - 06:34 PM, said:



Magic did mention expansion on Facebook back in March. But I too doubt they would be the ones buying a whole new lift. Soldier has 2 Yans in storage, so I doubt it's them. Tamarack does need a replacement for Wildwood, guess they could do it with a fixed grip. That would be my best guess, but probably a lousy guess. It's probably some place crazy like Rotorun.


Isn't wildwood an 05 HSQ? Why replace it? Unless it was re-possesed by the lender?
Also- When did Soldier get 2 yans? Don't they run 2 old double Stadeli's?
Reply

jaytrem's Photo jaytrem 15 Jul 2015

View PostRibStaThiok, on 15 July 2015 - 01:51 PM, said:


Isn't wildwood an 05 HSQ? Why replace it? Unless it was re-possesed by the lender?
Also- When did Soldier get 2 yans? Don't they run 2 old double Stadeli's?


Yup, Wildwood was repossessed a few years back. Was rebuilt for Brian Head before this past season.

The 2 Soldier Yans are in storage, not built yet. I don't think they plan to replace the existing chairs, would be used for expansion.
Reply

Peter's Photo Peter 15 Jul 2015

Pomerelle is replacing their SLI double with a new SkyTrac triple.
Reply

vons's Photo vons 15 Jul 2015

Peter is correct. Peter did you stop by Pomerelle on your way to Park City or did you stop in at Skytrac in SLC?
This post has been edited by vons: 15 July 2015 - 06:33 PM
Reply

Peter's Photo Peter 15 Jul 2015

View Postvons, on 15 July 2015 - 06:33 PM, said:

Peter is correct. Peter did you stop by Pomerelle on your way to Park City or did you stop in at Skytrac in SLC?

Unfortunately didn't make it to either one this trip.
Reply