←  Skilifts.org General Discussion

Skilifts.org / SORT Forum

»

New Lifts 2015

RibStaThiok's Photo RibStaThiok 06 Feb 2015

very happy to see these upgrades for Powderhorn. If the T4 Express pays off, without a doubt I see them upgrading West End. West End can be an 15+ min ride. I believe both T4 and WE were installed in the early 70s based upon the pictures and this site says WE was put in back in 73.. I drive by PH every summer/fall to do repeater work up on the Grand Mesa. It's a lovely little resort.
Reply

DonaldMReif's Photo DonaldMReif 06 Feb 2015

The current Take Four was actually built around the same time period that lifts like the Falcon SuperChair and Pioneer Express lift were built.
This post has been edited by DonaldMReif: 06 February 2015 - 03:03 PM
Reply

boardski's Photo boardski 06 Feb 2015

View PostDonaldMReif, on 06 February 2015 - 09:06 AM, said:

Take Four was actually built around the same time period that lifts like the Falcon SuperChair and Pioneer Express lift were built.
That sounds about right. It was one of the first small mountains to add a quad chair. Of course back then, they did not say whether it was high speed or not. The current T4 replaced an older double chair which I do not know a lot about.
Reply

RibStaThiok's Photo RibStaThiok 06 Feb 2015

According to the Chairlift Installation Survey when I searched Powderhorn:


1966 saw the installation of a Riblet Double that was 6093ft in length
1972 saw the installation of the current West End Double, 7000ft in length
1987 saw the installation of the current Take Four Quad that is 6216 in length (replacing I assume the 1966 Riblet)
And the installation of the current Easy Rider Double beginer chair.
This post has been edited by RibStaThiok: 06 February 2015 - 11:14 PM
Reply

boardski's Photo boardski 07 Feb 2015

I would not be surprised to see quite a bit of the current lift parts reused to create the new lift such as towers and maybe chairs.
Reply

vons's Photo vons 07 Feb 2015

I don't think they plan on reusing much more than maybe towers http://www.powderhorn.com/
Reply

DonaldMReif's Photo DonaldMReif 07 Feb 2015

The towers on high speed quads are the same width as towers on fixed grip quads, so yeah, I could see Powderhorn saving money by reusing the towers. (Here, it might be a case where they reuse the entire tower unit, although the sheave trains get replaced).
Reply

Peter's Photo Peter 07 Feb 2015

View PostDonaldMReif, on 07 February 2015 - 08:52 AM, said:

The towers on high speed quads are the same width as towers on fixed grip quads, so yeah, I could see Powderhorn saving money by reusing the towers.


Sometimes yes, sometimes no.
Reply

snoloco's Photo snoloco 07 Feb 2015

On Mountain Creek's Granite Peak Quad, the towerheads are the same width as their two high speed quads (Doppelmayrs installed in 1998). This was because they designed it to be converted to detachable just by changing the terminals and grips. However, CETC towers are generally not the same width. The Summit Quad at Whiteface, and the North and Straightbrook Quads at Gore have narrower towers than the Whirlwind Express at Windham (CTEC HSQ from 1993). I'm not sure about Poma.

How come towers on high speed lifts are sometimes wider than on fixed grips? Does it have something to do with giving more distance between the chair and tower because of the higher speed?
Reply

LuvPow's Photo LuvPow 07 Feb 2015

I believe they are using any usable lift part from the lift that was taken down in Newfoundland at Marble... they have been packing them up an shipping them out to GJ to refurbish
Reply

RibStaThiok's Photo RibStaThiok 07 Feb 2015

Name the chair compitition? (according to the Powderhorn website) So it won't be the Take Four Express? Sad :(
Reply

TheEpicPancake's Photo TheEpicPancake 17 Feb 2015

I've recently heard from an inside source that Deer Valley, once they take ownership of Solitude in May, is considering replacing the Summit Lift with a high speed detachable this summer.
Reply

SkiDaBird's Photo SkiDaBird 17 Feb 2015

View PostTheEpicPancake, on 17 February 2015 - 09:53 AM, said:

I've recently heard from an inside source that Deer Valley, once they take ownership of Solitude in May, is considering replacing the Summit Lift with a high speed detachable this summer.

No no no....
Summit doesn't have the terrain to support that capacity. Dynamite is the only cruiser down, everything else is just off shoots of that. Very few people ski Headwall, Corner Chute, Evergreen or even know how to access Cathedral.
Reply

trj820's Photo trj820 17 Feb 2015

View PostSkiDaBird, on 17 February 2015 - 10:25 PM, said:

No no no....
Summit doesn't have the terrain to support that capacity. Dynamite is the only cruiser down, everything else is just off shoots of that. Very few people ski Headwall, Corner Chute, Evergreen or even know how to access Cathedral.

True, but it's needed for One Wassatch.
Reply

sseguin613's Photo sseguin613 18 Feb 2015

Mont Cascades , Quebec seem to be getting a new quad chairlift for next season. Whether it replaces the existing double or triple chairlifts or will serve a new area and trails remains to be seen. The article also mentions potential development of a full resort village and attractions at the base.
http://www.cbc.ca/ne...ntain-1.2937221

Ski Vorlage, Quebec is also potentially installing an additional double chairlift to replace their t-bar, as mentionned in their fall newsletter here.
http://us3.campaign-...1&id=6a005eefde

That's all I got for now. Any more details on these projects from anyone?

Have a great day.
This post has been edited by sseguin613: 18 February 2015 - 05:56 AM
Reply

SuperRat's Photo SuperRat 18 Feb 2015

View PostSkiDaBird, on 17 February 2015 - 10:25 PM, said:

No no no....
Summit doesn't have the terrain to support that capacity. Dynamite is the only cruiser down, everything else is just off shoots of that. Very few people ski Headwall, Corner Chute, Evergreen or even know how to access Cathedral.


It doesn't have to be a high capacity lift.
Reply

Peter's Photo Peter 18 Feb 2015

Shaping up to be a big year for Doppelmayr, I count 11 projects...not many for L-P or SkyTrac so far.

Attached File(s)

Reply

DonaldMReif's Photo DonaldMReif 18 Feb 2015

Tucker Mountain isn't confirmed, so it needs to be taken off that list.
Reply

liftmech's Photo liftmech 21 Feb 2015

View PostDonaldMReif, on 17 February 2015 - 10:08 AM, said:

Solitude's in Utah, so if built, that lift will be built by Doppelmayr by default.

Probably, not definitely. You know how this works. If that were the case we'd have no Doppelmayrs, yet we have four.
Reply

liftmech's Photo liftmech 21 Feb 2015

View PostPeter, on 18 February 2015 - 05:35 PM, said:

Shaping up to be a big year for Doppelmayr, I count 11 projects...not many for L-P or SkyTrac so far.

Nothing confirmed at Copper, unless I'm really a mushroom and you know more than I do.
Reply