Random Lift Photos Number Seven
Andy1962
21 Jul 2012
Allan, on 21 July 2012 - 07:37 AM, said:
First load test for us and the quad! First time doing a downhill load test for us too!
To quote your May 11 comment in the new lifts section:
"Oh we do, but I'll have to wait for the official release.. sorry :)" Allan you never did actually tell us which lift was being replaced at Red Mountainm so now that you have posted a picture, please tell us the name of the lift that was replaced and the stats of the new one. thanks.
Andy1962
21 Jul 2012
Andy1962, on 21 July 2012 - 05:18 PM, said:
To quote your May 11 comment in the new lifts section:
"Oh we do, but I'll have to wait for the official release.. sorry :)" Allan you never did actually tell us which lift was being replaced at Red Mountainm so now that you have posted a picture, please tell us the name of the lift that was replaced and the stats of the new one. thanks.
okay so I figured it out. the lift being replace at Red Mountain is the old Silverlode Triple
Allan
21 Jul 2012
No lifts are being replaced, it will be an addition. The Silverlode triple was replaced in 2007 with the lift I pictured above. It's just our first time doing the load tests since the Doppelmayr crew did the tests last time!
jaytrem
22 Jul 2012
Allan, on 21 July 2012 - 11:25 PM, said:
No lifts are being replaced, it will be an addition. The Silverlode triple was replaced in 2007 with the lift I pictured above. It's just our first time doing the load tests since the Doppelmayr crew did the tests last time!
Must be one of these on Grey (1997 map)...
http://skimap.org/da.../1244183148.jpg
Any idea when the announcement would take place.
vons
11 Aug 2012
http://www.facebook....15897968&type=1 guess the bearing failed or was about too.
This post has been edited by vons: 11 August 2012 - 04:27 PM
This post has been edited by vons: 11 August 2012 - 04:27 PM
skier691
27 Oct 2012
gypsum2.gif (110.71K)
Number of downloads: 122
A picture of a 'conveyer' that took gypsum out to ships in Lake Huron south of Tawas City, here in Michigan.
Andoman
27 Oct 2012
skier691, on 27 October 2012 - 10:04 AM, said:
A picture of a 'conveyer' that took gypsum out to ships in Lake Huron south of Tawas City, here in Michigan.
I took my family up there this summer and we asked about it but nobody had a picture, that is really cool.
mikest2
27 Oct 2012
skier691, on 27 October 2012 - 10:04 AM, said:
A picture of a 'conveyer' that took gypsum out to ships in Lake Huron south of Tawas City, here in Michigan.
Couple of other shots:
http://www.boatnerd....Y-01Sept04-.jpg
http://www.boatnerd....Y2-Sept4-ag.jpg
DonaldMReif
18 Feb 2013
I took these about a month ago at Vail:
V Gallery Photos (1).JPG (1.78MB)
Number of downloads: 95
V Gallery Photos (2).JPG (1.91MB)
Number of downloads: 134
V Gallery Photos (3).JPG (1.71MB)
Number of downloads: 133
V Gallery Photos (4).JPG (1.88MB)
Number of downloads: 134
V Gallery Photos (5).JPG (1.91MB)
Number of downloads: 135
V Gallery Photos (6).JPG (1.87MB)
Number of downloads: 127
V Gallery Photos (7).JPG (1.93MB)
Number of downloads: 126
V Gallery Photos (8).JPG (1.93MB)
Number of downloads: 94
V Gallery Photos (1).JPG (1.78MB)
Number of downloads: 95
V Gallery Photos (2).JPG (1.91MB)
Number of downloads: 134
V Gallery Photos (3).JPG (1.71MB)
Number of downloads: 133
V Gallery Photos (4).JPG (1.88MB)
Number of downloads: 134
V Gallery Photos (5).JPG (1.91MB)
Number of downloads: 135
V Gallery Photos (6).JPG (1.87MB)
Number of downloads: 127
V Gallery Photos (7).JPG (1.93MB)
Number of downloads: 126
V Gallery Photos (8).JPG (1.93MB)
Number of downloads: 94
vons
26 Jul 2014
Not construction but its sure is a nice gondola cabin and probably he same price as the standard CWA https://scontent-b-s...369092166_n.jpg
From BMWBLOG's Facebook page
From BMWBLOG's Facebook page
Lift Dinosaur
26 Jul 2014
Allan
27 Jul 2014
Red Chair, opening day December 1948. Lift was installed in 1947.
Attached File(s)
-
IMG_0566.jpg (1.23MB)
Number of downloads: 141
vons
11 Jan 2015
Looking on one of our sister forums I came across this interesting bi-cable T-bar, enjoy this translated version of the report
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.remontees-mecaniques.net%2Fbdd%2Freportage-1009.html&edit-text=&act=url
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.remontees-mecaniques.net%2Fbdd%2Freportage-1009.html&edit-text=&act=url
liftmech
14 Mar 2015
Top and bottom of Beaver Creek's new chair 6, plus a nice renovation of chair 5's motor room.
DonaldMReif
15 Mar 2015
I think it's interesting how for the Centennial Express lift, they put EpicMix readers at both the loading area for the cabins and the loading area for the chairs, at the bottom of the lift in both cases (this in contrast to a number of gondolas like Canyons' (future west PCMR) Red Pine Gondola and Gondola One at Vail where the EpicMix reader is at the top of the lift).
This post has been edited by DonaldMReif: 17 March 2015 - 09:05 AM
This post has been edited by DonaldMReif: 17 March 2015 - 09:05 AM
Backbowlsbilly
16 Mar 2015
That's because the chondola unloads at two different points, while the other two load at two different points to make the maze more efficient but both unload at the same point.
floridaskier
17 Mar 2015
Think it's a little premature to call the Red Pine Gondola part of PCMR. Vail didn't have time to install any of the EpicMix stuff at PCMR for this season. The Canyons has all of it. They still give out day passes at PCMR on Canyons-logo tickets.
Side note, saw how remote the interconnect gondola unload spot is yesterday. They will need to blow some serious snow over there next year. It's been in the 60s all week and half the mountain is grass until you get back to Tombstone
Side note, saw how remote the interconnect gondola unload spot is yesterday. They will need to blow some serious snow over there next year. It's been in the 60s all week and half the mountain is grass until you get back to Tombstone


