The new lifts i'm particularly excited about are almost finished.
Sunapee's New Sunbowl Express lift was fairly close to completion by mid-October, and I assume that it's pretty much done by now. The lift was the former Northstar Express Quad from Okemo, VT. It reused the towers from the old Sunbowl Quad.
The first thumbnail shows the Northstar Express installed at it's original location at Okemo, VT.
Northstar Quad Top.png (659.62K)
Number of downloads: 92
The second thumbnail shows the top area of the Sunbowl Express, after the old quad was removed but before the new one was in construction.
Sunbowl Express Top Area.png (811.63K)
Number of downloads: 108
The third thumbnail shows a footing and some towers in the background.
Top Area and Footing.png (948.28K)
Number of downloads: 98
The fourth shows the bottom terminal in construction. I have no idea if the new lift is top or bottom drive, but the original was a top drive.
Sunbowl Express Bottom Terminal Construction.png (987.86K)
Number of downloads: 102
The fifth shows the top station in construction : The Bullwheel is being flown in here
Sunbowl Express Top Terminal Construction.png (880.72K)
Number of downloads: 100
The sixth shows basically the same shot but a few seconds later.
Sunbowl Express Top Terminal Construction (2).png (940.9K)
Number of downloads: 102
Overall I'm pretty happy that the old quad is being replaced. It was my favorite lift, had a nice view and it serviced my favorite trails on Sunapee, but it was so slow...
The Spear Mountain Quad at Ragged is also going pretty good. Last time I checked they had the haul rope up.
The seventh thumbnail shows the new quad before the haul rope was applied. By the looks of it, I think it's a UNI-G.
Spear Mountain Quad Oct2014.png (882.54K)
Number of downloads: 115
The eighth thumbnail shows the bottom terminal after the haul rope was put on.
Spear Mountain Quad November 2014.png (544.85K)
Number of downloads: 122
The ninth thumbnail shows the chairs and other supplies needed to finish the lift. Those clearly look like EJ's.
Spear Mountain Quad Nov2014 Chairs.png (321.1K)
Number of downloads: 139
I also am quite happy about the Spear Mountain Quad. The old triple took like 15 minutes, and ain't nobody got time for that. :)
So, Okemo lost the Northstar Quad to Sunapee, NH. But, they're getting a brand new Six-Seater Bubble lift from Leitner-Poma. Unlike the Northstar, the new lift is a top station drive.
The Tenth thumbnail shows the bottom station of the new six-pack.
Sunburst Six Bottom Construction.png (816.04K)
Number of downloads: 167
The Eleventh thumbnail shows the inside of the top station of the new six-pack.
Sunburst Six Top Station.png (801.39K)
Number of downloads: 132