302 replies to this topic

#221 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 19 October 2014 - 06:56 PM

Yeah, if I didn't know better I'd assume that CTEC built the lift in the early 2000s. Much like I wrongly assumed that Doppelmayr had made modifications to the Keystone double chairlifts last year because the tower heads looked a lot like the Doppelmayr design used on the quads and Ranger triple. I don't know who really did that modification.

But I wonder how they'll put chairs on the cable on the higher parts of the mountain.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#222 Nate214

    Established User

  • Industry II
  • 266 Posts:
  • Interests:Skiing, snowbiking, mountain biking, camping, hiking, cars

Posted 20 October 2014 - 04:33 AM

I like the skirting on the drive terminal will be nice having the bullwheel covered :biggrin:

#223 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 20 October 2014 - 06:35 PM

View PostDonaldMReif, on 19 October 2014 - 06:56 PM, said:



But I wonder how they'll put chairs on the cable on the higher parts of the mountain.

They all go on at the bottom, one at a time. I'm guessing Nate will have photos for us when that happens :)
Member, Department of Ancient Technology, Colorado chapter.

#224 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 20 October 2014 - 06:41 PM

View PostPeter, on 16 October 2014 - 03:22 PM, said:

It is quite a bit shorter than the old Chair 4. I think this lift will continue to be underutilized since it still starts in the middle of nowhere rather than down in the base area.

I don't understand the alignment of this lift. The old one made more sense, although it would have been nice if it had started in front of the lodge originally (even further downhill than before they shortened it). Before chair 8 was built we rode rope tows to get there, or walked because it was faster. Not sure why they brought the top downhill either. Strange.
Member, Department of Ancient Technology, Colorado chapter.

#225 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 20 October 2014 - 07:09 PM

The Ski Hill Grill webcam shows that most, if not all of the Colorado SuperChair's 132 chairs are on. However, it looks like there might be one more carrier to put on based on the latest cam photos.
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#226 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 22 October 2014 - 03:04 AM

It was running on Saturday (the 18th) when we drove by so I'd guess they were already all on.
Member, Department of Ancient Technology, Colorado chapter.

#227 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 22 October 2014 - 01:29 PM

View Postliftmech, on 22 October 2014 - 03:04 AM, said:

It was running on Saturday (the 18th) when we drove by so I'd guess they were already all on.




This was the view yesterday:
Attached File  peak8 10-21-14 08.jpg (255.55K)
Number of downloads: 282


Today:
Attached File  peak8 10-22-14 03.jpg (297.82K)
Number of downloads: 276
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#228 Lift Dinosaur

    Established User

  • Industry II
  • 2,076 Posts:

Posted 22 October 2014 - 07:17 PM

Donald... what is your point? There's a GMC Pick up in the second photo?
Dino?
"Things turn out best for the people that make the best of the way things turn out." A.L.

#229 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 23 October 2014 - 04:48 AM

It was the chair in the lower right corner. And the fact that from what is visible, the lift is virtually completed so the only thing I think they have left is weight testing and attaching trail maps to the bar on each chair.

I suppose the Centennial Chondola is progressing a bit more slowly since it's not scheduled to open for almost a month.

This post has been edited by DonaldMReif: 23 October 2014 - 04:50 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#230 liftmech

    lift mechanic

  • Administrator II
  • 5,918 Posts:
  • Interests:Many.

Posted 25 October 2014 - 05:07 AM

Believe I've mentioned this before, but the maps aren't a checklist item. If they don't have time this season they won't go on.
Member, Department of Ancient Technology, Colorado chapter.

#231 Nate214

    Established User

  • Industry II
  • 266 Posts:
  • Interests:Skiing, snowbiking, mountain biking, camping, hiking, cars

Posted 26 October 2014 - 08:45 AM

I seen SkyTrac going up with the chairs in pieces on Wednesday with Load test scheduled this coming week. Our chairs will be on soon but heard they're waiting for grips to arrive. We'll see what happens they have a November 1st deadline to complete lift and Load Test. Gonna have a busy week sounds like

#232 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 29 October 2014 - 10:55 AM

Finally, Breckenridge Ski Resort has behind the scenes footage of the Colorado SuperChair, showing off the carpet. As the video shows, the top terminal is built on top of what used to be the quad's vault motor room, but the drive is in the terminal housing. Call me skeptical, but I think the chairs on the Colorado SuperChair are much closer than the ones on the Kensho SuperChair.


This post has been edited by DonaldMReif: 29 October 2014 - 10:57 AM

YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#233 vons

    Established User

  • Industry II
  • 940 Posts:

Posted 29 October 2014 - 03:23 PM

The chairs are closer together on Colorado, Kensho has a lower design capacity whereas Colorado is maxing out the capacity capabilities of a sixpack.

This post has been edited by vons: 29 October 2014 - 03:24 PM


#234 DonaldMReif

    Established User

  • Member
  • 1,980 Posts:

Posted 29 October 2014 - 04:02 PM

Well, given the Kensho SuperChair is 22 towers and 103 chairs, and the Colorado SuperChair has 20 towers and 132 chairs (from a source somewhere), and they cover about the same distance, so yeah, it's reasonable to assume that the Colorado SuperChair's chairs are closer spaced. I think the only other six pack on the mountain with maximum capacity design is Quicksilver Super6 (I think the Independence SuperChair is more like 3,000 pph based on its chair spacing).
YouTube channel for chairlift POV videos and other random stuff:
https://www.youtube....TimeQueenOfRome

#235 Nate214

    Established User

  • Industry II
  • 266 Posts:
  • Interests:Skiing, snowbiking, mountain biking, camping, hiking, cars

Posted 01 November 2014 - 05:49 AM

Some photos from the load test last Wednesday on the Kachina Peak Lift. It's awesome riding this lift!!

Attached File(s)


This post has been edited by Nate214: 01 November 2014 - 05:56 AM


#236 Peter

    Established User

  • Member
  • 4,314 Posts:

Posted 01 November 2014 - 09:30 AM

View PostNate214, on 01 November 2014 - 05:49 AM, said:

Some photos from the load test last Wednesday on the Kachina Peak Lift. It's awesome riding this lift!!

Looks like the first SkyTrac without bars on the chairs...makes them look even stranger!
- Peter<br />
Liftblog.com

#237 boardski

    Established User

  • Industry II
  • 760 Posts:

Posted 01 November 2014 - 03:23 PM

Are they planning on putting cushions on those chairs? Those are some weird looking chairs for sure.
Skiing since 1977, snowboarding since 1989

#238 Nate214

    Established User

  • Industry II
  • 266 Posts:
  • Interests:Skiing, snowbiking, mountain biking, camping, hiking, cars

Posted 01 November 2014 - 07:28 PM

There will be bars mounted before the season not footrest. There will be seat pads but not back pads is a short ride 79 chairs 500 fpm 2100 slope length and 1100 vertical. There will be wind hitting this lift so back pads will have to be two pieces if considered later maybe.

#239 Nate214

    Established User

  • Industry II
  • 266 Posts:
  • Interests:Skiing, snowbiking, mountain biking, camping, hiking, cars

Posted 01 November 2014 - 07:34 PM

The top ramp will be fully decked and synthetic snow. Will probably be wind scoured at the most part so that's the plan.

#240 SkiDaBird

    Established User

  • Member
  • 509 Posts:
  • Interests:Skiing

Posted 02 November 2014 - 12:57 PM

View PostNate214, on 01 November 2014 - 07:28 PM, said:

There will be bars mounted before the season not footrest. There will be seat pads but not back pads is a short ride 79 chairs 500 fpm 2100 slope length and 1100 vertical. There will be wind hitting this lift so back pads will have to be two pieces if considered later maybe.

2100 length and 1100 vert...
Holy ****... that's basically like putting a lift up Highboy... Well not quite.
I really need to get to Taos.

This post has been edited by SkiDaBird: 02 November 2014 - 01:02 PM