2milehi's Photo 2milehi 02 Oct 2014

View Postliftmech, on 02 October 2014 - 05:59 AM, said:

Didn't you guys get some parts from old 6 for some of your lifts?

You'll find those parts on A-51 this winter if you are interested. Sheave assemblies.
Reply

Backbowlsbilly's Photo Backbowlsbilly 04 Oct 2014

Made it up to Beaver Creek yesterday and saw the progress on the new lift, they were finishing the cable splice when I was there.

Attached File(s)

Reply

Peter's Photo Peter 05 Oct 2014

Ragged Mountain, NH

Attached File(s)

Reply

Yooper Skier's Photo Yooper Skier 06 Oct 2014

While back in the Midwest for a wedding, I swung down to Granite Peak. Top (drive) terminal appears to be nearly complete, towers are standing, and looks like concrete for the return isn't far from going down. Chairs, hangers, and terminal components are in the parking lot waiting.

Attached File(s)

Reply

Peter's Photo Peter 06 Oct 2014

Crystal Chair 6

Attached File(s)

Reply

DonaldMReif's Photo DonaldMReif 11 Oct 2014

The chairs for the Colorado SuperChair have arrived and they appear to be sitting next to Lift 5 waiting for assembly.
They also look to be the same LPA chairs that the Kensho SuperChair has.
This post has been edited by DonaldMReif: 11 October 2014 - 01:06 PM
Reply

DonaldMReif's Photo DonaldMReif 14 Oct 2014

Looks like they've started putting chairs on the Colorado SuperChair. They probably will look just like the Kensho SuperChair's chairs, the difference being that they'll have trail maps on their safety bars.
Reply

Kicking Horse's Photo Kicking Horse 14 Oct 2014

View PostDonaldMReif, on 14 October 2014 - 04:19 PM, said:

Looks like they've started putting chairs on the Colorado SuperChair. They probably will look just like the Kensho SuperChair's chairs, the difference being that they'll have trail maps on their safety bars.


Donald, they are not called Safety Bars. They are Comfort Bars. :)
Reply

DonaldMReif's Photo DonaldMReif 15 Oct 2014

Well, as of this post there are three chairs sitting on the rail at the bottom terminal. Doesn't look like the bar maps have been installed quite yet, but they will be added prior to opening day.

Attached File  peak8 10-15-14 07.jpg (322.78K)
Number of downloads: 136

Also, it appears the sign on the board in front of the shared lift shack for the Colorado SuperChair and Rocky Mountain SuperChair has been replaced, as you compare that webcam picture with this one from about a month ago.
Attached File  peak8 09-18-14 02.jpg (309.32K)
Number of downloads: 129
This post has been edited by DonaldMReif: 15 October 2014 - 08:00 AM
Reply

Peter's Photo Peter 16 Oct 2014

I checked out the new lifts at Crystal today. First Chair 6. It's not a whole lot different than the old one...most of the footings were reused and there are 13 towers instead of 14. The lattice tower and the "portal" tower have been replaced with normal tubes. Note in the first photo there is still a bunch of snow leftover from the March avalanche that took out the original. Also there are 3 shiny new Gazex exploders in Powder Bowl (although none are on the avalanche path that took out the lift.)

Attached File(s)

Reply

Peter's Photo Peter 16 Oct 2014

And the "new" Quicksilver. The Deer Valley green is gone from the towers and they are galvanized like all of Crystal's newer lifts. A lot of grading has been done and the lift line is completely new. It is quite a bit shorter than the old Chair 4. I think this lift will continue to be underutilized since it still starts in the middle of nowhere rather than down in the base area.

Attached File(s)

Reply

floridaskier's Photo floridaskier 17 Oct 2014

Are those new towers for Quicksilver? I thought the new HSQ at Deer Valley reused the tower tubes from the old lift (leading to some ground clearance issues that got fixed the next summer)
Reply

Peter's Photo Peter 17 Oct 2014

View Postfloridaskier, on 17 October 2014 - 03:04 AM, said:

Are those new towers for Quicksilver? I thought the new HSQ at Deer Valley reused the tower tubes from the old lift (leading to some ground clearance issues that got fixed the next summer)


Mountaineer Express got all new towers when it was built so these are probably the towers from Deer Crest. There might be a few new ones since Quicksilver has 2 more towers than Deer Crest did.
Reply

DonaldMReif's Photo DonaldMReif 17 Oct 2014

I just got word somewhere the Colorado SuperChair's official tower and chair numbers, for comparison with the old are: 20 towers and 132 chairs, which compares with 21 towers and 153 chairs.
Reply

DonaldMReif's Photo DonaldMReif 17 Oct 2014

And chair installation is mostly completed:
Attached File  peak8 10-17-14 20.jpg (242.82K)
Number of downloads: 114

Attached File  peak8base 10-17-14.jpg (184.64K)
Number of downloads: 103
Reply

Nate214's Photo Nate214 19 Oct 2014

https://www.youtube....h?v=xNKH-NJJV_w Here's a YouTube video of the splice day for the Kachina Peak lift
Reply

Nate214's Photo Nate214 19 Oct 2014

Some Picture from splice day at the Kachina Peak Lift

Attached File(s)

Reply

Nate214's Photo Nate214 19 Oct 2014

Pictures of the Kachina Peak lift the other day. Cable is on just a few more parts needed and some chairs. It's looking nice!

Attached File(s)

Reply

floridaskier's Photo floridaskier 19 Oct 2014

Did SkyTrac buy the patents for the old CTEC line gear? Towerheads and sheave trains look just like the pre-merger CTEC designs
Reply

vons's Photo vons 19 Oct 2014

I think all of the design patents have expired for the parts in question,but, there are also a number of refinements (changes) in every part design used by SkyTrac making their parts different from the old CTEC & D-CTEC ones.
Reply