New Lift Construction Photos 2014

liftmech's Photo liftmech 17 May 2014

Can't say I knew we had a camera up there :blush:
Reply

liftmech's Photo liftmech 17 May 2014

New lift location.

Attached File(s)

Reply

boardski's Photo boardski 17 May 2014

How do those riding the summer park lift access the lift during the summer?
Reply

DonaldMReif's Photo DonaldMReif 17 May 2014

I don't know. Definitely not via American Flyer. The roads down from the top of Union Creek lift might be a potential route. But it might be best to wait for Copper to make further announcements.
Reply

liftmech's Photo liftmech 18 May 2014

Same way they always have-- the bus. We've run these camps for years, it's just that they've always used vans to shuttle the campers from the bottom back up. They take a bus fro the base area to the park itself then ride in the vans. The lift is to eliminate the multiple shuttles.
Reply

Yooper Skier's Photo Yooper Skier 25 May 2014

Took these at Shawnee Peak after they took down the towers and return of Rabbit. The first two i snagged from their facebook page.

Attached File(s)

Reply

Lift Dinosaur's Photo Lift Dinosaur 25 May 2014

I was in Breckenridge last week and they have the haul rope spooled up and the pilot rope being retrieved.
Next step will be to pull test the tower foundations and prep the cross arms to be flown out. Some will have the sheave assemblies removed as they are too heavy for the KMax that will be coming.
Dino

Attached File  P1000445.JPG (321.58K)
Number of downloads: 150Attached File  P1000447.JPG (412.64K)
Number of downloads: 193Attached File  P1000448.JPG (420.1K)
Number of downloads: 199Attached File  P1000450.JPG (351.81K)
Number of downloads: 145
Reply

liftmech's Photo liftmech 25 May 2014

That spool rig looks really familiar.
Reply

DonaldMReif's Photo DonaldMReif 25 May 2014

No word on if they will also test the tower tubes to make sure they could carry the weight of high speed six pack crossarms and chairs?
Reply

JSteigs's Photo JSteigs 26 May 2014

View PostDonaldMReif, on 25 May 2014 - 07:00 PM, said:

No word on if they will also test the tower tubes to make sure they could carry the weight of high speed six pack crossarms and chairs?

Tower tube widths are somewhat standard. I doubt there will be any testing, just an engineer running the numbers, and signing off on it.
Reply

liftmech's Photo liftmech 26 May 2014

View PostDonaldMReif, on 25 May 2014 - 07:00 PM, said:

No word on if they will also test the tower tubes to make sure they could carry the weight of high speed six pack crossarms and chairs?

Read Dino's post.

Quote

Next step will be to pull test the tower foundations and prep the cross arms to be flown out.
Reply

snoloco's Photo snoloco 28 May 2014

Removal of the Adirondack Express high speed triple at Gore Mountain has begun to make way for the new high speed quad. The chairs are off. The jagged cut up pieces of metal here prove that the lift is being scrapped, not relocated.

Posted Image
Reply

RibStaThiok's Photo RibStaThiok 28 May 2014

Those jerks.
Reply

2milehi's Photo 2milehi 29 May 2014

View PostLift Dinosaur, on 25 May 2014 - 05:05 PM, said:

I was in Breckenridge last week and they have the haul rope spooled up and the pilot rope being retrieved.
Next step will be to pull test the tower foundations and prep the cross arms to be flown out. Some will have the sheave assemblies removed as they are too heavy for the KMax that will be coming.
Dino

Attachement P1000445.JPGAttachement P1000447.JPGAttachement P1000448.JPGAttachement P1000450.JPG

Don't pull too hard :wink:
This post has been edited by 2milehi: 29 May 2014 - 08:27 AM
Reply

liftmech's Photo liftmech 30 May 2014

View Postsnoloco, on 28 May 2014 - 03:17 PM, said:

Removal of the Adirondack Express high speed triple at Gore Mountain has begun to make way for the new high speed quad. The chairs are off. The jagged cut up pieces of metal here prove that the lift is being scrapped, not relocated.



Damn. They just cut the carriers up? Very surprised they didn't sell them, I imagine there are quite a few people in that area who would have wanted one.
Reply

snoloco's Photo snoloco 30 May 2014

From a closer look at it. It looks like these are just the hanger arms. They said on Facebook that you should stay tuned for information about the chairs.
Reply

CH3skier's Photo CH3skier 02 Jun 2014

View PostNate214, on 10 May 2014 - 07:04 AM, said:

Another picture of the Sky Trac Bullwheel on Kachina PeakAttachement kachinab5.jpg

Here is a news video I saw on Facebook today.
http://www.koat.com/...26257542#!TJXaR
Reply

Nate214's Photo Nate214 02 Jun 2014

View PostCH3skier, on 02 June 2014 - 10:43 AM, said:

Here is a news video I saw on Facebook today.
http://www.koat.com/...26257542#!TJXaR

Yup they came and shot that last week. Just seen it on facebook also. The Spider excavator showed up and is supposed to get to work at the top and work down.
Reply

Nate214's Photo Nate214 02 Jun 2014

This Spider Excavator is about to be an office with a awesome view. Attached File  IMG_20140602_064613.jpg (533.01K)
Number of downloads: 100Attached File  IMG_20140602_064634.jpg (566.75K)
Number of downloads: 93
Reply

snoloco's Photo snoloco 03 Jun 2014

The haul rope is off the Adirondack Express.

Posted Image

Another picture of haul rope removal.
Posted Image

Bottom terminal deconstruction
Posted Image

Posted Image
This post has been edited by snoloco: 03 June 2014 - 11:54 AM
Reply