Lift Construction Photos 2013
boardski
16 Aug 2013
Hopefully Vail has made more progress than meets the eye on the new chair 4 (Mtn Top Express). In comparison, Wolf Creek has the new Treasure quad bottom terminal completely assembled.
This post has been edited by boardski: 16 August 2013 - 07:00 PM
This post has been edited by boardski: 16 August 2013 - 07:00 PM
DonaldMReif
20 Aug 2013
boardski, on 16 August 2013 - 06:29 PM, said:
Hopefully Vail has made more progress than meets the eye on the new chair 4 (Mtn Top Express). In comparison, Wolf Creek has the new Treasure quad bottom terminal completely assembled.
Well they've finished tree clearing and tower-foundation laying as of this morning.
Peter
20 Aug 2013
Lookin good at Stevens Pass
1119988_10151529420775598_364047775_o (1).jpg (516.44K)
Number of downloads: 102
Whistler Blackcomb update: http://www.whistlerb...blog/index.aspx
1119988_10151529420775598_364047775_o (1).jpg (516.44K)
Number of downloads: 102
Whistler Blackcomb update: http://www.whistlerb...blog/index.aspx
trooper1556
22 Aug 2013
skier691
22 Aug 2013
Caribou Express,
Lutsen, MN
08/22/13
This post has been edited by skier691: 22 August 2013 - 07:19 PM
Lutsen, MN
08/22/13
Attached File(s)
-
photo (5).JPG (460.82K)
Number of downloads: 160 -
photo (4).JPG (538.45K)
Number of downloads: 223 -
photo (3).JPG (541.17K)
Number of downloads: 225 -
photo (2).JPG (566.11K)
Number of downloads: 167
This post has been edited by skier691: 22 August 2013 - 07:19 PM
skier2
23 Aug 2013
vons
24 Aug 2013
not construction but a good video of a rope changehttp://vimeo.com/54237270
BigSkySkier
25 Aug 2013
Here are some good images of the new bottom terminal locations at Bridger Bowl. They are planning are completely revamping their names for the lifts. One of the new lifts will remain Alpine while the other new lift will steal Powder Park away from the quad lift that operates out of the base. The quad will then be renamed Sunnyside. Here is the full article from the local paper in Bozeman. http://www.bozemanda...19bb2963f4.html
Attached File(s)
-
47732_975574913329_668135169_n.jpg (106.46K)
Number of downloads: 113 -
47737_975574593969_885407553_n.jpg (133.19K)
Number of downloads: 142 -
999998_975574743669_2108176137_n.jpg (105.73K)
Number of downloads: 134 -
1000005_975574993169_1481887285_n.jpg (134.74K)
Number of downloads: 132 -
1012250_975575043069_1081871644_n.jpg (117.13K)
Number of downloads: 123 -
1093943_975574833489_1717731328_o.jpg (299.59K)
Number of downloads: 83
vons
26 Aug 2013
Those Photos are a little old, the bottom concrete work is well on its way and the top terminals should be up within the next week. I left that job about a week ago to return to school
. I'll post some shots soon, unfortunately I don't have many, I was too busy Working.
skier691
26 Aug 2013
skier2, on 23 August 2013 - 08:32 AM, said:
Still a lot of work to do there! Looks like the line was shifted over quite a bit, as well. Probably to avoid the need to do additional clearing. Gorgeous views, as ever!
Lift line is basically the same. The view, hard pressed to get a better view of the big lake anywhere! 2 new trails, both with winch points, were also cut on backside between The Plunge and the top of the Bull Chair....
jwilliams
28 Aug 2013
Towers are flying at Vail today. The Vail webcam shows two new Chair 4 towers have popped up in the past hour. I also caught a glimpse of the the helo on the cam.
http://www.vail.com/...ntain-cams.aspx
http://www.vail.com/...ntain-cams.aspx
Lift Dinosaur
28 Aug 2013
Flying concrete for the top station of the 6 Pack at Breckenridge this week.....
1 Hooking Up.JPG (804.15K)
Number of downloads: 111
2 Hooked Up.JPG (862.18K)
Number of downloads: 140
12 Heli above top station- Upper Lift.JPG (677.98K)
Number of downloads: 99
Dino
1 Hooking Up.JPG (804.15K)
Number of downloads: 111
2 Hooked Up.JPG (862.18K)
Number of downloads: 140
12 Heli above top station- Upper Lift.JPG (677.98K)
Number of downloads: 99
Dino
vons
30 Aug 2013
from a few weeks ago at Bridger
Attached File(s)
-
mud.jpg (169.43K)
Number of downloads: 75
floridaskier
30 Aug 2013
DonaldMReif
30 Aug 2013
This picture was posted on Vail's Facebook page recently, and it shows one of the Mountaintop Express lift's terminal pieces being transported by truck up the mountain. Based on its appearance, it's going to be using detachable grips similar to those used on the Doppelmayr-CTEC high speed quads at Beaver Creek.
Attached File(s)
-
Mountaintop Express terminal piece.jpg (73.73K)
Number of downloads: 74
DonaldMReif
30 Aug 2013
Lift Dinosaur, on 28 August 2013 - 04:21 PM, said:
Flying concrete for the top station of the 6 Pack at Breckenridge this week.....
1 Hooking Up.JPG
2 Hooked Up.JPG
12 Heli above top station- Upper Lift.JPG
Dino
Dino
liftmech
31 Aug 2013
It'll be a top drive. The terminal you see is the fixed return wheel that goes with the Alpha drive station. The hill slopes up beyond the terminal. I imagine they wanted to trench power as little as possible, so both lifts' drives will be in the same spot.
DonaldMReif
31 Aug 2013
liftmech, on 31 August 2013 - 04:54 AM, said:
It'll be a top drive. The terminal you see is the fixed return wheel that goes with the Alpha drive station. The hill slopes up beyond the terminal. I imagine they wanted to trench power as little as possible, so both lifts' drives will be in the same spot.
Well I was having a hard time telling in this photo: http://leitner-poma..../2013/07/22.jpg and comparing it to pictures of the Snowflake lift, which is also bottom drive. I know that the terminals and towers will look like the Big Blue Express at Squaw (http://leitner-poma..../SQUAW-3-JF.jpg, and http://leitner-poma....2012/10/sq2.jpg). In fact, I think the new style of towerheads is a retro style, given that the tower heads slant outwards from the crossarms, like the towers on the Falcon SuperChair (http://www.panoramio.../photo/85185796).
This post has been edited by DonaldMReif: 31 August 2013 - 08:39 AM
DonaldMReif
31 Aug 2013
I know, I'm double posting, but Breckenridge also released this video here a few days ago: http://www.youtube.c...eature=youtu.be. Apparently, the six pack will have a custom wood skin similar to that seen on a number of European high speed quads, six packs, and eight packs. I think Breckenridge is going for the same type of terminal appearance that Crested Butte had done to their high speed quads in 2004.
shelldog
01 Sep 2013
Here are a few from Peak 6
Attached File(s)
-
20130821_083435.jpg (1.92MB)
Number of downloads: 131 -
top cage.jpg (1.29MB)
Number of downloads: 184 -
lift line1.jpg (1.15MB)
Number of downloads: 144