New Lifts for 2013
DonaldMReif
11 Jun 2013
Peter
14 Jun 2013
Greek Peak is getting a Doppelmayr fixed quad with a loading carpet to replace Lift 1A.
Source: http://nyskiblog.com...ess-conference/
Source: http://nyskiblog.com...ess-conference/
Peter
14 Jun 2013
Peter, on 14 June 2013 - 02:45 PM, said:
Greek Peak is getting a Doppelmayr fixed quad with a loading carpet to replace Lift 1A.
Source: http://nyskiblog.com...ess-conference/
Source: http://nyskiblog.com...ess-conference/
Also it look like Doppelmayr's tri-leg drive/tension terminal with the Uni-G enclosure has a name that we hadn't heard before: "Tristar"
Attached File(s)
-
Tristar.png (1.17MB)
Number of downloads: 99
skier2
16 Jun 2013
Does L-P have something similar to the Dopp World Book to list more information about the installs each year? I'm looking specifically for the vert of the new Caribou Express at Lutsen.
Lift Dinosaur
17 Jun 2013
In a word, No. Leitner Technologies, the parent company, publishes an Annual Report that is hard covered. It only lists projects by Leitner Ropeways, not POMA or LPOA and is not available to the general public.
As for Caribou Express: Slope Length 3592' and Vertical Rise 768'.
Dino
As for Caribou Express: Slope Length 3592' and Vertical Rise 768'.
Dino
vons
17 Jun 2013
From our French counterparts http://www.remontees...showtopic=17612 and the LPOA projects are included in the report
Allan
20 Jun 2013
jaytrem
20 Jun 2013
Allan
20 Jun 2013
Not this season, it sounds like one way or another we'll be able to get people there the season after. It's actually quite uphill - the map doesn't do it justice!
jaytrem
21 Jun 2013
Sugar Bowl has officially announced the new Crow's Peak Chair. Though it pretty much official when they were touting it for season pass sales.
http://www.sugarbowl.com/18201
http://www.sugarbowl.com/18201
DonaldMReif
23 Jun 2013
Vail's Mid-Vail HD camera is back up. It looks like the terminals are gone on the old Mountaintop Express and just the towers remain to be taken down, before they can start building the new lift.
jaytrem
23 Jun 2013
New lift at Hermitage (aka Haystack). Might not be done for 13/14, but I wouldn't be suprised if they had it done before the end of the season. They got last years lift opened mid-season.
http://www.dvalnews....=home_news_left
"A 3,000-foot transfer lift is included in the Hermitage application as well. The lift will begin at the base of the lower mountain and include a midstation for skiers to exit the lift and use the lower trails, or proceed to the top."
This post has been edited by jaytrem: 23 June 2013 - 05:48 PM
http://www.dvalnews....=home_news_left
"A 3,000-foot transfer lift is included in the Hermitage application as well. The lift will begin at the base of the lower mountain and include a midstation for skiers to exit the lift and use the lower trails, or proceed to the top."
This post has been edited by jaytrem: 23 June 2013 - 05:48 PM
DonaldMReif
13 Jul 2013
Vail update: on the Mid-Vail camera as of today, there are piles of dirt that indicate that they are laying down the lift tower bases.
DonaldMReif
16 Jul 2013
Vail construction update for 7/16: the old lift's towers are down, so the line is cleared.
vons
16 Jul 2013
At Bridger Bowl we flew the final 8 towers worth of mud today, its looking like friday we will be flying the towers in on both lifts.
This post has been edited by vons: 16 July 2013 - 06:10 PM
This post has been edited by vons: 16 July 2013 - 06:10 PM
Lift Dinosaur
17 Jul 2013
72 Hour cure time for the concrete?
Must be vertical towers.....
Dino
Must be vertical towers.....
Dino
boardski
20 Jul 2013
Looking like nice progress on the new Teasure HSQ at Wolf Creek, CO. Web cam shows bottom terminal.
DonaldMReif
22 Jul 2013
Vail construction update: as of today, it looks like they are doing the foundation digging for the bottom terminal on the Mid-Vail cam.