Lift Construction Photos 2013
Peter
16 May 2013
Stevens Pass is already assembling the top terminal of the new Jupiter Express.
Attached File(s)
-
479381_10151382218590598_1630525498_o.jpg (386.19K)
Number of downloads: 237
Peter
18 May 2013
Some pictures from the Sea to Sky Gondola Facebook Page...
310015_580368511993543_199029010_n.jpg (145.26K)
Number of downloads: 173
943702_580368698660191_2063522114_n.jpg (212.65K)
Number of downloads: 222
BGZDvMFCMAAB2x3.jpg large.jpg (148.5K)
Number of downloads: 159
Also there is a live webcam of the bottom terminal site: http://seatoskygondola.com/webcam/

Number of downloads: 173

Number of downloads: 222

Number of downloads: 159
Also there is a live webcam of the bottom terminal site: http://seatoskygondola.com/webcam/
Aussierob
26 May 2013
Top of Harmony missing a few bits. Doppelmayr are pull testing all the towers and significant excavation has been done at Crystal return.
Attached File(s)
-
photo.JPG (424.94K)
Number of downloads: 162
SkiBachelor
26 May 2013
Is Doppelmayr or Leitner-POMA re-installing Harmony?
I know Doppelmayr has relocated a few POMA HSQs in the past, but just curious.
I know Doppelmayr has relocated a few POMA HSQs in the past, but just curious.
Peter
27 May 2013
SkiBachelor, on 26 May 2013 - 09:38 PM, said:
Is Doppelmayr or Leitner-POMA re-installing Harmony?
Per this, L-P.
Aussierob
27 May 2013
Yep, L-P are doing the Harmony relocate to Crystal and Doppelmayr are doing the new install on Harmony. I'm glad WB are doing the blog. I won't be here this summer to take photos.
liftmech
29 May 2013
Nice-- so the new lift might use old tower tubes and the old one gets new.
Aussierob
02 Jun 2013
Yes .The new Doppel six pack on the old quad towers and new towers for the old quad going to Crystal.
Allan
24 Jul 2013
Well there's steel standing for our lift!
Attached File(s)
-
IMG_16722.jpg (809.54K)
Number of downloads: 140
Peter
24 Jul 2013
Bridger Bowl towers are in: https://www.facebook...83875638&type=1
Whistler Blackcomb update:http://www.whistlerb...blog/index.aspx
Stevens Pass: https://www.facebook...&type=1
Whistler Blackcomb update:http://www.whistlerb...blog/index.aspx
Stevens Pass: https://www.facebook...&type=1
floridaskier
01 Aug 2013
Website for the construction on Snowbird's new Gad 2 high speed quad
http://www.snowbird.com/winter/gad2/
http://www.snowbird.com/winter/gad2/
liftmech
07 Aug 2013
Peter
07 Aug 2013
Harmony 6 going up at W-B
Attached File(s)
-
tumblr_inline_mr6oz6xrjV1qz4rgp.jpg (89.86K)
Number of downloads: 213 -
tumblr_inline_mr6ozksasC1qz4rgp.jpg (81.68K)
Number of downloads: 263 -
1149046_10151638671593402_938652954_n.jpg (116.64K)
Number of downloads: 187
skier691
10 Aug 2013
Crystal Mtn, MI
Future 'New' Buck
All concrete poured except the drive terminal
IMG_1737.JPG (1.54MB)
Number of downloads: 103
Future 'New' Buck
All concrete poured except the drive terminal

Number of downloads: 103
liftmech
16 Aug 2013
DonaldMReif
16 Aug 2013
It's probably going to be difficult to get any pictures of Peak 6 chairlift construction. However you can see parts of the newly cleared trails from Highway 9. It's a whole lot easier to get Vail lift construction updates because they have a live camera at Mid-Vail that shows the Mountaintop Express.